Contributions
[ AI/Question: Q4/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1701 ]
(Rev.1) |
G.fast: Exchange and determine the time out of initialization stages in handshake
|
Huawei Technologies Co., Ltd.
|
Q4/15
|
2016-02-01 |
|
[ 1672 ]
|
G.fast: Dynamic Bandwidth Allocation (DBA) for G.fast - control and management
|
ADTRAN
,
AT&T, Inc.
|
Q4/15
|
2016-02-01 |
|
[ 1668 ]
(Rev.1) |
G.fast: FTU-R software upgrade over eoc
|
ADTRAN
,
AT&T, Inc.
,
CenturyLink
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-01 |
|
[ 1662 ]
|
G.fast, G.hs: G.994.1 tone sets for coax
|
ADTRAN
,
AT&T, Inc.
,
Broadcom Corporation
,
Qualcomm, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-01 |
|
[ 1661 ]
|
G.Fast: Requirements for operation on copper lines extended to include coaxial cables
|
ZTE Corporation
|
Q4/15
|
2016-02-01 |
|
[ 1660 ]
|
G.Fast: Requirements for Dynamic Bandwidth Allocation (DBA) in G.fast operation on coax
|
ZTE Corporation
|
Q4/15
|
2016-02-01 |
|
[ 1567 ]
|
G.fast: Framework for Dynamic US/DS Time Assignment Mechanism
|
Qualcomm, Inc.
|
Q4/15
|
2016-01-29 |
|
[ 1565 ]
|
G.fast - specification of Impulse noise monitoring
|
Swisscom SA
|
Q4/15
|
2016-01-29 |
|
[ 1563 ]
(Rev.1) |
G.fast: requirements for the DBA TDD DS/US ratio limits
|
AT&T, Inc.
,
ADTRAN
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-29 |
|
[ 1562 ]
|
G.fast coax cable configurations
|
ADTRAN
,
AT&T, Inc.
|
Q4/15
|
2016-01-29 |
|
[ 1561 ]
(Rev.1) |
G.fast 212 MHz amendment
|
AT&T, Inc.
,
Orange
,
TELUS Communications
|
Q4/15
|
2016-01-29 |
|
[ 1550 ]
|
G.fast: Signalling of DBA updates over the RMC
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-28 |
|
[ 1549 ]
|
G.fast: DBA proposed way for changing the TDD DS/US ratio during showtime
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-01-28 |
|
[ 1526 ]
|
G.fast - Need for improved reporting of EFTR
|
Swisscom SA
|
Q4/15
|
2016-01-27 |
|
[ 1524 ]
|
G.fast - Need for seamless reconfiguration of TARSNRM
|
Swisscom SA
|
Q4/15
|
2016-01-22 |
|
[ 1499 ]
|
Release of BT cable (20 pair) NEXT measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-12-10 |
|
[ 1496 ]
|
G.dpm: Proposal for text modifications in G.dpm draft Recommendation
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-09 |
|
[ 1482 ]
|
G.fast: Proposed text updates for G.9701 Amd 1
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-09 |
|
[ 1481 ]
|
G.vdsl2: Proposed update for Annex Q profiles
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-09 |
|
[ 1478 ]
|
G.fast: Proposed change in retransmission function definition
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1469 ]
|
G.vdsl: Proposed limits for CPE Common Mode Emission
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1463 ]
+Add.1-2 |
G.vector: channel measurements for two Belgacom paper cable samples
|
Belgacom SA Account Payable Service
|
Q4/15
|
2015-06-09 |
|
[ 1461 ]
|
G.dpm: Proposed text for an amendment to G.9979
|
Marvell Semiconductor Inc.
|
Q4/15, Q18/15
|
2015-06-09 |
|
[ 1460 ]
|
G.fast: New format for RPA request
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1459 ]
|
G.inp, G.vdsl: Reduce HRTref for VTU-R in 35b
|
Broadcom Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1458 ]
|
G.fast changes to G.9701 (2014) to support Cross-Layer Low Power Mode Control Annex
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1457 ]
|
G.dpm: Alignment of Vendor specific TLVs between G.DPM and G.9979
|
Marvell Semiconductor Inc.
|
Q4/15, Q18/15
|
2015-06-09 |
|
[ 1453 ]
|
G.fast: Issues with definition of Active Line Noise (ALN) in Low Power Mode
|
Alcatel-Lucent International
|
Q4/15
|
2015-06-09 |
|
[ 1450 ]
|
G.fast: Corrigendum 1: Improvements to working text on DFT output sample reporting
|
Alcatel-Lucent International
|
Q4/15
|
2015-06-09 |
|
[ 1448 ]
|
G.fast Cross-Layer Low Power Mode Control Annex in Draft Amendment 1 to Recommendation ITU-T G.9701 (2014)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1438 ]
|
Illustration of Packet Delay Variation (PDV) over GPON (access network) technology
|
Orange
|
Q4/15, Q2/15, Q13/15
|
2015-06-09 |
|
[ 1435 ]
|
G.fast, G.bond: Proposed Text for Backpressure Control from FTU-R when operating with G.998.2 bonding
|
Broadcom Corporation
,
Ikanos Communications
|
Q4/15
|
2015-06-09 |
|
[ 1422 ]
+Add.1 |
G.fast: Release of BT cable (100 pair) measurements for use in simulations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1421 ]
|
G.fast Enhanced Diagnosis Functions
|
ZTE Corporation
|
Q4/15
|
2015-06-09 |
|
[ 1420 ]
|
G.997.1/G.998.4 Retransmission Counters
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1413 ]
|
G.fast Amendment 2 Priorities
|
AT&T, Inc.
,
British Telecommunications Public Ltd. Co. (BT Plc)
,
CenturyLink
,
Deutsche Telekom AG
,
Orange
,
Swisscom SA
,
Telecom Italia S.p.A.
|
Q4/15
|
2015-06-09 |
|
[ 1403 ]
|
G.997.1 modifications to support G.993.2 profile 35b and G.993.2 Annex B revision
|
Deutsche Telekom AG
,
Orange
,
Swisscom SA
,
Telecom Italia S.p.A.
|
Q4/15
|
2015-06-09 |
|
[ 1385 ]
|
G.fast Low power Mode Control Managed Objects for G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1356 ]
|
G.dpm: Proposed modifications to working text in sections 7.5 and 7.6 of the G.dpm draft Recommendation
|
Broadcom Corporation
|
Q4/15, Q18/15
|
2015-06-09 |
|
[ 1349 ]
|
Impact of leaving events on G.993.2 Annex Q vectoring
|
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2015-06-08 |
|
[ 1348 ]
|
G.fast: MIMO Processing versus FEXT Cancellation
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2015-06-08 |
|
[ 1340 ]
|
G.fast: Additional retransmission parameters exchanged during initialization
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2015-06-08 |
|
[ 1339 ]
|
G.fast: Test Parameter Xlin
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2015-06-08 |
|
[ 1338 ]
|
G.fast: Proposed items for G.9701 corrigendum
|
Futurewei Technologies US R&D Center
,
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2015-06-08 |
|
[ 1337 ]
|
G.fast (Amd 1): Proposed Active Line Noise (ALN) Definition
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1336 ]
(Rev.1-3) |
G.fast (Amd 1): Proposed Quiet Line Noise (QLN) definition edits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1335 ]
|
G.fast (Amd 1): Proposed Line Attenuation (LATN) informative appendix
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1334 ]
|
G.fast (Amd 2): A Comparison of Linear and Non-Linear Precoders
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2015-06-08 |
|
[ 1302 ]
|
G.vdsl,G.bond: KPN requirements on profile 35b/Annex Q
|
The Netherlands Organisation for Applied Scientific Research (TN
|
Q4/15
|
2015-06-08 |
|
[ 1282 ]
|
Adding G.9701 Low Power Mode managed objects to G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2015-06-08 |
Results:256 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):