Contributions
[ AI/Question: Q4/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2078 ]
|
G.vector: Supporting zero bits and measuring QLN based on zero bits
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2061 ]
|
G.fast: On robustness and recovery of G.fast link
|
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2058 ]
|
G.fast: Comments on draft text of G.9701 Amendment 3
|
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2055 ]
|
G.fast: G.fast Non-linear precoding simulation conditions: Imperfect Channel State Information (background)
|
Alcatel-Lucent International
|
Q4/15
|
2016-09-05 |
|
[ 2049 ]
|
G.fast: General framework of INM method
|
Broadcom Corporation
,
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2039 ]
|
G.Fast: Application reference model(s) for coax
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2038 ]
|
G.Fast: Indication of QoS queues status for DTA control
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2037 ]
|
G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2036 ]
|
G.Fast: Consideration for signalling mechanism of DTA updates
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2035 ]
|
G.fast: Considerations on pre-coding of 212MHz profile
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2023 ]
|
G.fast: identifying and completing missing elements in the RPA procedure in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2021 ]
|
G.fast: identifying and completing missing elements in the FRA procedure in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2006 ]
|
G.fast: removing INP_min_shine in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2005 ]
|
G.hs, G.fast: text proposal for adding codepoints for G.9701 Annex X related items
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2001 ]
(Rev.1) |
G.fast: Text updates of Annex X sections (in G.9701 & G.9700) on profiles, termination impedance and transmit power for coax cables
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 1978 ]
(Rev.1) |
G.fast: a corrigendum item for correcting a mistake in clause 8.3.1 "PTM-TC DTU format" of G.9701
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-04 |
|
[ 1957 ]
|
G.fast: utility maximization for vector policy management
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2016-09-02 |
|
[ 1956 ]
|
G.fast profiles 424 and 848
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2016-09-02 |
|
[ 1955 ]
|
Additional DTA Management Parameters
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2016-09-02 |
|
[ 1858 ]
|
Configuration counters in L2 states (G.9701 Amd 1)
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1856 ]
|
Comments on the draft G.9701 Amendment 1
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1840 ]
|
G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters
|
Proximus PLC
|
Q4/15
|
2016-02-02 |
|
[ 1838 ]
|
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission
|
Futurewei Technologies US R&D Center
,
Metanoia Technologies, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1817 ]
|
G.fast: Reduction of number VF samples reporting formats
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1816 ]
|
G.fast: Clarification on byte order in SOC and EOC messages.
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1812 ]
|
G.fast: G.9701 test parameters text improvements
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1810 ]
|
G.fast: Various text updates to G.9701 Amd1 Low power mode
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1809 ]
|
G.fast: Proposal to restrict upstream transmit power for 8dBm profile
|
Broadcom Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1808 ]
|
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1807 ]
|
G.vdsl: Mis-estimation of SNR during MEDLEY
|
Broadcom Corporation
,
Intel Corporation
,
Qualcomm, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1804 ]
|
G.fast: G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1802 ]
|
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1801 ]
|
G.ploam, G.fast: Clarification on Unavailable State for corrigendum
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1800 ]
|
G.ploam: Test parameter update time stamps in G.997.2 Amd1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1799 ]
|
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1798 ]
|
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1797 ]
|
G.ploam: Missing lom failure in G.997.1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1792 ]
|
G.vector: Considerations about Multi-Vendor Vectoring standardization
|
Telecom Italia S.p.A.
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1787 ]
|
Proposal for TIGAV transmission method
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1783 ]
|
G.fast: Upstream Hlog reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1782 ]
|
G.ploam, Capability reporting in G.997.1 and G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1774 ]
|
On G.fast based solution for Coax application
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-02-02 |
|
[ 1744 ]
|
On the details of TIGAV procedure
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1743 ]
|
Proposed eoc settings for Annex Q when used with G.993.5
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1742 ]
|
On the timeout of L2.1-Entry procedure (G.9701 Amd 1)
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1740 ]
|
Proposed corrigendum to G.9701
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1702 ]
(Rev.1) |
G.fast Amendment 2: Maximum Bit Loading Revisited
|
Huawei Technologies Co., Ltd.
,
Metanoia Technologies
,
Swisscom SA
|
Q4/15
|
2016-02-01 |
Results:256 total items. Result page:
-
1 -
2 -
3 -
4 -
5 -
6
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):