Contributions
[ AI/Question: Q4/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2210 ]
|
G.fast: Maximal Ratio Transmission over FEXT channels
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2209 ]
|
G.fast: On mixed sampling frequency G.fast vector groups
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2208 ]
|
G.fast: Zero Forcing Pre-coder optimisation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2182 ]
|
VDSL: Long Reach VDSL2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2170 ]
|
G.fast: Mobile backhaul use cases
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-09-06 |
|
[ 2162 ]
|
G.fast: identifying and completing missing elements in the SRA procedure in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2160 ]
|
G.fast: Clarification on bitswap constraints
|
Broadcom Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2159 ]
|
G.ploam: Corrigendum item to G.997.2
|
Broadcom Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2155 ]
|
G.ploam: Working text to support Annex T of G.9701
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2154 ]
|
G.fast: Working text for Annex T
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2153 ]
|
G.fast: Update of working for Annex S (NT software upgrade)
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2152 ]
|
G.fast: Update of coax cable configurations working text for Annex X
|
ADTRAN
,
AT&T, Inc.
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2151 ]
|
G.fast: Wideband transmit power for profile 212a
|
Intel Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2146 ]
(Rev.1) |
G.fast: A framework for seamless reconfiguration
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2145 ]
|
G.fast: communicating DTA_enable and DTA_max_Mds from the FTU-O to the FTU-R for DTA operation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2135 ]
|
G.fast: a corrigendum item for correcting some typos in clause 11.2.2.13 ("PMD test parameter read commands and responses") of G.9701
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2125 ]
|
G.fast: 212 MHz profile considerations
|
Telecom Italia S.p.A.
|
Q4/15
|
2016-09-06 |
|
[ 2124 ]
|
G.fast: proposal to add a 159MHz profile to the main body of G.9701
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2089 ]
|
G.fast: Excluding persistent near-end los defect from fast retrain triggers
|
Huawei Technologies Co., Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2087 ]
|
G.fast: INM procedure and control parameters
|
Intel Corporation
|
Q4/15
|
2016-09-06 |
|
[ 2086 ]
|
G.fast: The next generation of DSL beyond current G.fast
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
Swisscom SA
|
Q4/15
|
2016-09-06 |
|
[ 2084 ]
|
G.fast: Revising ETR_min and ETR_min_eoc
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2083 ]
|
G.fast: Simulation results on linear precoding and non-linear precoding
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2082 ]
|
Adding a note to clarify PRMPSDds
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2080 ]
|
G.vector: Extending pilot sequence length to 1024
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2078 ]
|
G.vector: Supporting zero bits and measuring QLN based on zero bits
|
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-09-06 |
|
[ 2061 ]
|
G.fast: On robustness and recovery of G.fast link
|
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2058 ]
|
G.fast: Comments on draft text of G.9701 Amendment 3
|
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2055 ]
|
G.fast: G.fast Non-linear precoding simulation conditions: Imperfect Channel State Information (background)
|
Alcatel-Lucent International
|
Q4/15
|
2016-09-05 |
|
[ 2049 ]
|
G.fast: General framework of INM method
|
Broadcom Corporation
,
Intel Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2039 ]
|
G.Fast: Application reference model(s) for coax
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2038 ]
|
G.Fast: Indication of QoS queues status for DTA control
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2037 ]
|
G.Fast: Requirements for DTA capability Negotiation and environment confirmation in the initialization stage for operation on twisted-pair cables
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2036 ]
|
G.Fast: Consideration for signalling mechanism of DTA updates
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2035 ]
|
G.fast: Considerations on pre-coding of 212MHz profile
|
ZTE Corporation
|
Q4/15
|
2016-09-05 |
|
[ 2023 ]
|
G.fast: identifying and completing missing elements in the RPA procedure in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2021 ]
|
G.fast: identifying and completing missing elements in the FRA procedure in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2006 ]
|
G.fast: removing INP_min_shine in G.9701 Corrigendum 3
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2005 ]
|
G.hs, G.fast: text proposal for adding codepoints for G.9701 Annex X related items
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 2001 ]
(Rev.1) |
G.fast: Text updates of Annex X sections (in G.9701 & G.9700) on profiles, termination impedance and transmit power for coax cables
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-05 |
|
[ 1978 ]
(Rev.1) |
G.fast: a corrigendum item for correcting a mistake in clause 8.3.1 "PTM-TC DTU format" of G.9701
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-09-04 |
|
[ 1957 ]
|
G.fast: utility maximization for vector policy management
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2016-09-02 |
|
[ 1956 ]
|
G.fast profiles 424 and 848
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2016-09-02 |
|
[ 1955 ]
|
Additional DTA Management Parameters
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2016-09-02 |
|
[ 1858 ]
|
Configuration counters in L2 states (G.9701 Amd 1)
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1856 ]
|
Comments on the draft G.9701 Amendment 1
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1840 ]
|
G.fast: Proximus requirements for G.fast operation on coax and CAT5 wires up to at least 150 meters
|
Proximus PLC
|
Q4/15
|
2016-02-02 |
|
[ 1838 ]
|
G.fast: Analysis of dynamic time assignment (DTA) for upstream and downstream transmission
|
Futurewei Technologies US R&D Center
,
Metanoia Technologies, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1817 ]
|
G.fast: Reduction of number VF samples reporting formats
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1816 ]
|
G.fast: Clarification on byte order in SOC and EOC messages.
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
Results:256 total items. Result page:
1 -
2 -
3 -
4 -
5 -
6
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):