Contributions
[ Source: Huawei Technologies Co., Ltd. ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2213 ]
|
Consideration on Functional Requirements for Transport SDN CPI
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q14/15, Q12/15
|
2016-09-07 |
|
[ 2165 ]
(Rev.1) |
ODU SMP Operations Considerations
|
Huawei Technologies Co., Ltd.
|
Q9/15, Q14/15
|
2016-09-06 |
|
[ 2164 ]
|
Considerations on 'Lockout of Protection (LoP)' for G.odusmp
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2144 ]
|
Test of EVM scripts for draft revised G.698.2
|
Huawei Technologies Co., Ltd.
|
Q6/15
|
2016-09-06 |
|
[ 2143 ]
|
Considerations on optical transceiver module for G.metro
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q6/15
|
2016-09-06 |
|
[ 2142 ]
|
Revision of the description of cross-polarization modulation
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q7/15
|
2016-09-06 |
|
[ 2141 ]
|
Comments on Table 9-1/G.8021
|
NEC Corporation
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q14/15, Q10/15
|
2016-09-06 |
|
[ 2140 ]
|
Comments to the latest draft of G.Sup-ELPDNI
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2139 ]
|
Use of bridges and selectors in the latest draft of G.Sup-ELPDNI
|
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2117 ]
|
Interoperability between EEC and eEEC (G.8262.1 and G.8262 clocks).
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2116 ]
|
HRMs for cluster-based synchronization (G.8271.1).
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2098 ]
|
Proposed text for MPLS-TP Shared Ring Protection (G.8132)
|
China Mobile Communications Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-06 |
|
[ 2091 ]
|
The suggestion about adding some new characteristics of optical transport network equipment
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-06 |
|
[ 2089 ]
|
G.fast: Excluding persistent near-end los defect from fast retrain triggers
|
Huawei Technologies Co., Ltd.
|
Q4/15
|
2016-09-06 |
|
[ 2086 ]
|
G.fast: The next generation of DSL beyond current G.fast
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
Swisscom SA
|
Q4/15
|
2016-09-06 |
|
[ 2085 ]
|
Requirements for a common service information model
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q14/15
|
2016-09-06 |
|
[ 2081 ]
|
APTS network limit of G.8271.2 and noise generation of G.8273.4
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2079 ]
|
Proposals for G.8266 clock with GNSS receiver and G.8272.1 scope
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2077 ]
|
SyncE clock ID of G.8264
|
Huawei Technologies Co., Ltd.
,
Orange
|
Q13/15
|
2016-09-06 |
|
[ 2075 ]
|
Sub-Nyquist Artefacts and Sampling Moiré Effects when Measuring PTP to PTP and PTP to 1 PPS Noise Transfer (G.8272.3, G.supp)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2074 ]
|
Proposed notes for 7.3.1/G.8273.2 (PTP to PTP noise transfer) and C.2.3.1/G.8273.2 (PTP to 1PPS noise transfer)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2073 ]
|
Miscellaneous Proposals for Revised Recommendation G.781
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2072 ]
|
Initial Simulation Results for Wander Accumulation in a Chain of eEECs (G.8262.1, G.supp)
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2071 ]
|
G.8275.2 - Deny service
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2070 ]
(Rev.1) |
Same path of SyncE frequency and PTP time
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2069 ]
|
OMCI management support for XGS-PON
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-06 |
|
[ 2068 ]
|
Short-term phase transient and phase discontinuity of G.8266
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2067 ]
|
Wide-Band Jitter Accumulation Simulation Results for Transport of Higher-Rate Ethernet Clients over B100G OTN based on Multiple Replications
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-09-06 |
|
[ 2064 ]
|
Proposed G.FAST updates in G.988
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-06 |
|
[ 2059 ]
|
Solution for Avoiding Sympathetic Switching in ODUk SNC/S Protected Domains
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15
|
2016-09-05 |
|
[ 2018 ]
|
Consideration on Network Resource Slicing in G.asdtn
|
China Telecommunications Corporation
,
ETRI
,
Huawei Technologies Co., Ltd.
|
Q14/15, Q12/15
|
2016-09-05 |
|
[ 2017 ]
|
G.vlc: Draft working text for the new G.vlc Recommendation
|
Huawei Technologies Co., Ltd.
,
China Academy of Telecommunication Research (CATR)
,
Marvell Semiconductor Inc.
,
Ministry of Industry and Information Technology (MIIT)
|
Q18/15
|
2016-09-05 |
|
[ 2015 ]
|
Wavelength block filter in XG-PON ONU
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-05 |
|
[ 2014 ]
|
The Spectral width parameter in XGS-PON
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-05 |
|
[ 2013 ]
|
Draft Supplement to ITU-T G-series Recommendations 25 Gb/s per wavelength transmission technologies over PON
|
Huawei Technologies Co., Ltd.
|
Q2/15
|
2016-09-05 |
|
[ 1940 ]
|
Proposal of a new supplement on 25 Gb/s transmission per wavelength
|
Broadcom Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
FiberHome Technologies Group
,
Futurewei Technologies US R&D Center
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
|
Q2/15
|
2016-09-02 |
|
[ 1918 ]
|
Proposal to start a new project to specify CPRI over OTN phase 2
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1917 ]
(Rev.1-2) |
CPRI over OTN phase II extension
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Intel Corporation
,
IP Light
,
Xilinx Incorporation
|
Q11/15
|
2016-09-01 |
|
[ 1915 ]
|
100G/B100G multi-vendor FlexO based SOTUm interface family
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1914 ]
|
Proposed corrections to Table 8-1/G.874 and 7-1/G.806
|
Huawei Technologies Co., Ltd.
|
Q14/15, Q11/15
|
2016-09-01 |
|
[ 1913 ]
|
OTN connections and protected connections
|
Huawei Technologies Co., Ltd.
|
Q9/15, Q12/15, Q11/15
|
2016-09-01 |
|
[ 1912 ]
|
Atomic function specification text proposal of FlexE
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-09-01 |
|
[ 1911 ]
|
FlexE and xGE interoperability update
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1910 ]
|
Atomic function specification text proposal of the interworking between ETCx and ETCflex
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1909 ]
|
Atomic function specification text proposal of mapping a 64b/66b PCS coded signal into OPUflex
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-09-01 |
|
[ 1908 ]
|
ETC Naming Proposal
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-09-01 |
|
[ 1907 ]
|
Comments on the open issues with the ETY_TT description in G.8021
|
Huawei Technologies Co., Ltd.
|
Q11/15, Q10/15
|
2016-09-01 |
|
[ 1906 ]
|
G.hn: Interoperability of different secure admission mechanisms
|
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
|
Q18/15
|
2016-09-01 |
Results:48 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):