Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1819 ]
|
Wander Accumulation Simulation Results for Transport of a 1 GB Ethernet Client over B100G OTN based on Multiple Replications
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1818 ]
|
10Mhz interface
|
Huawei Technologies Co., Ltd.
|
Q13/15
|
2016-02-02 |
|
[ 1817 ]
|
G.fast: Reduction of number VF samples reporting formats
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1816 ]
|
G.fast: Clarification on byte order in SOC and EOC messages.
|
Broadcom Corporation
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2016-02-02 |
|
[ 1815 ]
|
OOC-PSD mask in NG-PON2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q2/15
|
2016-02-02 |
|
[ 1814 ]
|
Proposal precautions for the use of GNSS receivers
|
Orange
|
Q13/15
|
2016-02-02 |
|
[ 1813 ]
|
Observed GPS UTC information malfunction - for information
|
Orange
|
Q13/15
|
2016-02-02 |
|
[ 1812 ]
|
G.fast: G.9701 test parameters text improvements
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1811 ]
|
Proposal for G.654.E fibre
|
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2016-02-02 |
|
[ 1810 ]
|
G.fast: Various text updates to G.9701 Amd1 Low power mode
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1809 ]
|
G.fast: Proposal to restrict upstream transmit power for 8dBm profile
|
Broadcom Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1808 ]
|
G.fast: G.ploam: G.997.2 parameters to support G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1807 ]
|
G.vdsl: Mis-estimation of SNR during MEDLEY
|
Broadcom Corporation
,
Intel Corporation
,
Qualcomm, Inc.
|
Q4/15
|
2016-02-02 |
|
[ 1806 ]
|
Future work on G.fast recommendations
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1805 ]
|
G.fast, Editorial Correction to Figure Z-2.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1804 ]
|
G.fast: G.fast XLOG test parameter
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1803 ]
|
G.vlc: Modulations formats for G.vlc
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1802 ]
|
G.fast, G.ploam: VCE ID and VCE port index in G.9701 Amd2 and G.997.2 Amd2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1801 ]
|
G.ploam, G.fast: Clarification on Unavailable State for corrigendum
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1800 ]
|
G.ploam: Test parameter update time stamps in G.997.2 Amd1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1799 ]
|
G.fast, G.ploam: Corrigenda to G.9701 and G.997.2
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1798 ]
|
G.ploam, G.fast: Link state forced/enable/actual in G.9701 Amd1 and G.997.2 Amd1.
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1797 ]
|
G.ploam: Missing lom failure in G.997.1
|
Alcatel-Lucent International
|
Q4/15
|
2016-02-02 |
|
[ 1796 ]
|
Considerations on the evolution of Module Framer and DSP Framer Interfaces (MFI/DFI)
|
Huawei Technologies Co., Ltd.
|
Q11/15
|
2016-02-02 |
|
[ 1795 ]
|
G.hn: On the use of G.hn over twisted pair cables
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1794 ]
|
Cascaded and nested protection
|
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2016-02-02 |
|
[ 1793 ]
|
Optical Media SDN Control Dependencies
|
Xtera Communications, Inc.
|
Q14/15, Q12/15
|
2016-02-02 |
|
[ 1792 ]
|
G.vector: Considerations about Multi-Vendor Vectoring standardization
|
Telecom Italia S.p.A.
|
Q4/15
|
2016-02-02 |
|
[ 1791 ]
|
G.fast: On data rate reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1790 ]
|
Test result for multi-domain nested protection
|
China Unicom
|
Q9/15
|
2016-02-02 |
|
[ 1789 ]
|
G.hn: Implementation on the agreements on centralized coordination of neighbouring domains
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1788 ]
|
Test result for multi-domain cascaded protection
|
China Unicom
|
Q9/15
|
2016-02-02 |
|
[ 1787 ]
|
Proposal for TIGAV transmission method
|
Intel Corporation
|
Q4/15
|
2016-02-02 |
|
[ 1786 ]
|
G.hn: Some considerations on PSD ceiling use in G.hn framework - Continuation
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1785 ]
|
Alarm processing in G.asdtn and G.gim
|
ZTE Corporation
|
Q14/15, Q12/15
|
2016-02-02 |
|
[ 1784 ]
|
Proposal on dual rate PMD reference design for XGS-PON
|
FiberHome Technologies Group
|
Q2/15
|
2016-02-02 |
|
[ 1783 ]
|
G.fast: Upstream Hlog reporting
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1782 ]
|
G.ploam, Capability reporting in G.997.1 and G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2016-02-02 |
|
[ 1781 ]
(Rev.1) |
Consideration for upstream dual-rate XGS-PON
|
FiberHome Technologies Group
|
Q2/15
|
2016-02-02 |
|
[ 1780 ]
|
G.primex: Ask for consent and determination
|
STMicroelectronics
|
Q15/15
|
2016-02-02 |
|
[ 1779 ]
|
G.654 revision proposal incorporating a large Aeff fibre for terrestrial networks
|
Corning Incorporated
|
Q5/15
|
2016-02-02 |
|
[ 1778 ]
|
Comments to the editor proposed revisions for ITU-T Recommendation G.652
|
Corning Incorporated
|
Q5/15
|
2016-02-02 |
|
[ 1777 ]
|
Proposed changes to CLPAJ and NTT revised proposal on chromatic dispersion specifications of G.652.D fibre
|
Corning Incorporated
|
Q5/15
|
2016-02-02 |
|
[ 1776 ]
|
Proposal for revising Appendix I of ITU-T Recommendation G.652 revision
|
Corning Incorporated
,
OFS Fitel, LLC
|
Q6/15, Q5/15
|
2016-02-02 |
|
[ 1775 ]
|
G.vlc: Some consideration on G.vlc use cases
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1774 ]
|
On G.fast based solution for Coax application
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2016-02-02 |
|
[ 1773 ]
|
G.vlc: Connecting a G.hn-AFE to a LED-based VLC transceiver
|
Marvell Semiconductor Inc.
|
Q18/15
|
2016-02-02 |
|
[ 1772 ]
|
Holdover Scenarios with eEEC Clock
|
Rakon Limited
|
Q13/15
|
2016-02-02 |
|
[ 1771 ]
|
Option 2 clocks for eEEC
|
Rakon Limited
|
Q13/15
|
2016-02-02 |
|
[ 1770 ]
|
Withdrawn by submitter
|
N/A
|
|
2016-02-02 |
Results:371 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):