International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2015-06-22 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2015-06-22) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2015-06-22 to 2015-07-03

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:32 total items.
Contributions  [ Source: FiberHome Technologies Group ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1473 ]  
 
New type protection mode in G.989.1Amd1     FiberHome Technologies Group   Q2/15   2015-06-09
[ 1471 ]  
 
Proposals to categorize type B protection for G.989.1Amd1     FiberHome Technologies Group   Q2/15   2015-06-09
[ 1455 ]  
 
Transport of the clockClass message over GPON     Alcatel-Lucent Shanghai Bell , China Mobile Communications Corporation , FiberHome Technologies Group , ZTE Corporation   Q2/15, Q13/15   2015-06-09
[ 1434 ]  
 
New term and update of availability enhancement techniques     Electronics and Telecommunications Research Institute (ETRI) , Coriant GmbH & Co. KG , FiberHome Technologies Group , SK Telecom   Q14/15, Q12/15   2015-06-09
[ 1433 ]  
(Rev.1) 
Consideration on DNI fault scenarios in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1426 ]  
 
Discussion of the protection types that can be supported by controller based protection in SDTN     FiberHome Technologies Group   Q14/15, Q12/15   2015-06-09
[ 1424 ]  
 
Proposal of new parameters of Single-Sided C+ Transceiver for G984.2 Amd1     China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q2/15   2015-06-09
[ 1417 ]  
 
Proposals for the latest draft of G.mdsp     China Unicom , FiberHome Technologies Group   Q9/15   2015-06-09
[ 1387 ]  
 
Consideration Hybrid Interconnection in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1386 ]  
 
Consideration of MCC in G.8021     FiberHome Technologies Group   Q10/15   2015-06-09
[ 1371 ]  
 
Consideration DNI architecture in G.MDSP     FiberHome Technologies Group   Q9/15   2015-06-09
[ 1368 ]  
 
Requirement analysis of optical layer protection in metro WDM networks     China Telecommunications Corporation , China Unicom , FiberHome Technologies Group   Q9/15   2015-06-09
[ 1329 ]  
 
Consideration of network management in SDN     China Mobile Communications Corporation , FiberHome Technologies Group   Q14/15, Q12/15   2015-06-08
[ 1300 ]  
 
Proposals to architecture components classification and clarification of G.800     FiberHome Technologies Group   Q12/15   2015-06-08
[ 1298 ]  
 
Consideration of Sync Pacs in G.gim     China Mobile Communications Corporation , FiberHome Technologies Group   Q14/15   2015-06-08
[ 1296 ]  
 
Functional requirements for SDN CPI and M-CPI in G.asdtn     FiberHome Technologies Group   Q14/15, Q12/15   2015-06-08
[ 1295 ]  
 
Consideration for single-end/Dual-end performance measurement in G.8052 and G.8152     FiberHome Technologies Group   Q14/15   2015-06-08
[ 1263 ]  
 
Proposal on RTM for cable cut-off wavelength in revision of ITU-T Rec. G.650.1     FiberHome Technologies Group   Q5/15   2015-06-08
[ 1262 ]  
 
Revision Proposal for Appendix I of recommendation L.60     FiberHome Technologies Group   Q16/15   2015-06-08
[ 1261 ]  
 
Proposal of technical clauses for revision of recommendation L.60     FiberHome Technologies Group   Q16/15   2015-06-08
[ 1251 ]  
(Rev.1) 
The suggestion of adding some new Abbreviations and acronyms into G.709 and G.798     FiberHome Technologies Group   Q11/15   2015-06-08
[ 1250 ]  
 
The modification of figure 15-1B of G.709     FiberHome Technologies Group   Q11/15   2015-06-08
[ 1249 ]  
 
Proposal of a new PTP TC layer structure diagram     FiberHome Technologies Group   Q2/15   2015-06-08
[ 1248 ]  
 
Adding ODUCn to figures 12-2 and 12-3 of G.709     FiberHome Technologies Group   Q11/15   2015-06-08
[ 1247 ]  
 
The MI of OCh/OTUCn should be added into G.874     FiberHome Technologies Group   Q14/15   2015-06-08
[ 1246 ]  
 
The MI of OSx/CBRx should be added into G.874     FiberHome Technologies Group   Q14/15   2015-06-08
[ 1243 ]  
 
Amendment of ONU state diagram of PtP WDM TC     FiberHome Technologies Group   Q2/15   2015-06-08
[ 1227 ]  
 
Proposal of new recommendation on studying indoor high speed Visible Light Communications(VLC)     Ministry of Industry and Information Technology (MIIT) , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q2/15, Q18/15, Q15/15   2015-06-08
[ 1226 ]  
 
L.oxcon "outdoor optical cross connect cabinet"     Ministry of Industry and Information Technology (MIIT) , FiberHome Technologies Group , Huawei Technologies Co., Ltd.   Q16/15   2015-06-08
[ 1221 ]  
 
The consideration of communication channel of G.metro     ADVA Optical Networking , China Unicom , Electronics and Telecommunications Research Institute (ETRI) , FiberHome Technologies Group , Telefon AB - LM Ericsson , ZTE Corporation   Q6/15   2015-06-07
[ 1203 ]  
 
XG-PON2 Requirements and Standardization Proposal     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co., Ltd. , ZTE Corporation   Q2/15   2015-06-05
[ 1202 ]  
 
Using Standard GFP-T to map CPRI clients into an ODU Carrier - Proposed addition to the draft CPRI-over-OTN Supplement     China Mobile Communications Corporation , Coriant GmbH & Co. KG , FiberHome Technologies Group , PMC-Sierra, Inc.   Q11/15   2015-06-05
Results:32 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-24