International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2015-06-22 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2015-06-22) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2015-06-22 to 2015-07-03

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:17 total items.
Contributions  [ Source: British Telecommunications Public Ltd. Co. (BT Plc) ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1490 ]  
 
Annex C in 989.2 Amd1     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-09
[ 1475 ]  
 
Loose ONU Calibration in NGPON2     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-09
[ 1474 ]  
 
10G symmetric, single-channel PON system     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-09
[ 1468 ]  
 
ITU-T G.8271 Network Reference Model Extension     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2015-06-09
[ 1467 ]  
 
Access Budget (Optical/Copper Media) within E2E Time/phase HRM     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2015-06-09
[ 1466 ]  
 
ITU-T G.8271 Access HRM Model Extension     British Telecommunications Public Ltd. Co. (BT Plc)   Q13/15   2015-06-09
[ 1465 ]  
 
ITU-T G.8271 Network Reference Model Extension  
No file provided
 
British Telecommunications Public Ltd. Co. (BT Plc)     2015-06-09
[ 1458 ]  
 
G.fast changes to G.9701 (2014) to support Cross-Layer Low Power Mode Control Annex     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-06-09
[ 1448 ]  
 
G.fast Cross-Layer Low Power Mode Control Annex in Draft Amendment 1 to Recommendation ITU-T G.9701 (2014)     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-06-09
[ 1422 ]  
+Add.1 
G.fast: Release of BT cable (100 pair) measurements for use in simulations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-06-09
[ 1420 ]  
 
G.997.1/G.998.4 Retransmission Counters     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-06-09
[ 1413 ]  
 
G.fast Amendment 2 Priorities     AT&T, Inc. , British Telecommunications Public Ltd. Co. (BT Plc) , CenturyLink , Deutsche Telekom AG , Orange , Swisscom SA , Telecom Italia S.p.A.   Q4/15   2015-06-09
[ 1385 ]  
 
G.fast Low power Mode Control Managed Objects for G.997.2     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-06-09
[ 1210 ]  
 
Proposals to address issues 1, 2 & 3 in G.Suppl.51 LL (TD 543/WP1)     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-05
[ 1208 ]  
 
TWDM-PON Protection time flow charts     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-05
[ 1206 ]  
 
G.8031/Y.1342 - 1:1 Bidirectional Ethernet Protection Switching to Support Dual Parenting PON Protection     British Telecommunications Public Ltd. Co. (BT Plc) , Huawei Technologies Co., Ltd.   Q9/15   2015-06-05
[ 1181 ]  
 
Proposals to address issues 4&5 in G.Suppl.51 LL (TD 543/WP1)     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-03
Results:17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19