Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1398 ]
|
Proposal and comment on G.Sup.fcr
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2015-06-09 |
|
[ 1397 ]
|
Unfiltered BC specification
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
|
[ 1396 ]
|
Proposal on chromatic dispersion specification of G.652.D and G.657.A fibres
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q5/15
|
2015-06-09 |
|
[ 1395 ]
|
Proposal on the revision of G.652 and G.657
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q5/15
|
2015-06-09 |
|
[ 1394 ]
|
Phase and time distribution without physical layer frequency support
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
|
[ 1393 ]
|
Network design aspects for phase delivery - Eth' speed mismatch
|
ADVA Optical Networking
|
Q13/15
|
2015-06-09 |
|
[ 1392 ]
|
Proposal for PTP profile using T-TC
|
Microsemi
,
NEC Corporation
,
Orange
|
Q13/15
|
2015-06-09 |
|
[ 1391 ]
|
Consideration on multicast forwardable / non-forwardable address for T-TC
|
Microsemi
,
NEC Corporation
,
Orange
|
Q13/15
|
2015-06-09 |
|
[ 1390 ]
|
Message rate of PTP over OTN
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15, Q11/15
|
2015-06-09 |
|
[ 1389 ]
|
Proposal on new Recommendations of optical infrastructure for developing countries
|
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q16/15
|
2015-06-09 |
|
[ 1388 ]
|
Proposal on frequency offset measurement function
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
|
Q13/15
|
2015-06-09 |
|
[ 1387 ]
|
Consideration Hybrid Interconnection in G.MDSP
|
FiberHome Technologies Group
|
Q9/15
|
2015-06-09 |
|
[ 1386 ]
|
Consideration of MCC in G.8021
|
FiberHome Technologies Group
|
Q10/15
|
2015-06-09 |
|
[ 1385 ]
|
G.fast Low power Mode Control Managed Objects for G.997.2
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2015-06-09 |
|
[ 1384 ]
|
Proposal on TOD Specification - Electrical Characteristics and Frame Structure
|
Calnex Solutions Limited
,
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15
|
2015-06-09 |
|
[ 1383 ]
|
Proposal on TOD Specification - Time Event Message
|
Calnex Solutions Limited
,
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15
|
2015-06-09 |
|
[ 1382 ]
|
Proposal on TOD Specification - Time Information Message
|
Calnex Solutions Limited
,
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q13/15
|
2015-06-09 |
|
[ 1381 ]
|
Proposal on synchronization information model
|
China Mobile Communications Corporation
,
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q14/15, Q13/15, Q12/15
|
2015-06-09 |
|
[ 1380 ]
|
ePRTC Time Holdover
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1379 ]
|
Text for "Unicast message negotiation" clause in the G.8275.2 profile
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1378 ]
|
Initial Draft of 10 MHz interface in G.703
|
Microsemi
|
Q13/15
|
2015-06-09 |
|
[ 1377 ]
|
Follow-up proposal for low loss ODN classes in WS-ODN (G.989.2 Am1)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2015-06-09 |
|
[ 1376 ]
|
G.hn: Further discussion of IMB open issues
|
Metanoia Technologies, Inc.
|
Q18/15
|
2015-06-09 |
|
[ 1375 ]
|
Performance requirements for passive node elements with ID tags
|
China Unicom
|
Q16/15
|
2015-06-09 |
|
[ 1374 ]
|
Proposal for G.9802 Annex B
|
ZTE Corporation
|
Q2/15
|
2015-06-09 |
|
[ 1373 ]
|
CC calling on HCC
|
Alcatel-Lucent Shanghai Bell
|
Q12/15
|
2015-06-09 |
|
[ 1372 ]
(Rev.1) |
Proposal for the TWDM-PON line code of 10G upstream in 40km in G.989.2 Amendment 1
|
ZTE Corporation
|
Q2/15
|
2015-06-09 |
|
[ 1371 ]
|
Consideration DNI architecture in G.MDSP
|
FiberHome Technologies Group
|
Q9/15
|
2015-06-09 |
|
[ 1370 ]
|
the Clarification of G.metro work
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1369 ]
|
Editorial comments for G.7044
|
Alcatel-Lucent Shanghai Bell
,
China Mobile Communications Corporation
|
Q11/15
|
2015-06-09 |
|
[ 1368 ]
|
Requirement analysis of optical layer protection in metro WDM networks
|
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
|
Q9/15
|
2015-06-09 |
|
[ 1367 ]
|
Proposal on Hold-off timer in G.873.1
|
ZTE Corporation
|
Q9/15
|
2015-06-09 |
|
[ 1366 ]
|
Proposal on SNC protection in G.808.1
|
ZTE Corporation
|
Q9/15
|
2015-06-09 |
|
[ 1365 ]
|
Proposal on precision time synchronization layer OAM
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-09 |
|
[ 1364 ]
|
Proposal on frequency synchronization layer OAM
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-09 |
|
[ 1363 ]
|
Proposal on frequency synchronization layer OAM
No file provided
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-09 |
|
[ 1362 ]
|
Proposal on Synchronization OAM
|
China Mobile Communications Corporation
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q14/15, Q13/15
|
2015-06-09 |
|
[ 1361 ]
|
Discussion on various scenarios for ODU SMP application
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1360 ]
|
Considerations re management of SDN control
No file provided
|
Alcatel-Lucent Shanghai Bell
|
Q14/15, Q12/15
|
2015-06-09 |
|
[ 1359 ]
|
Network flattening application scenarios for future ODUSMP deployment
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1358 ]
|
Consideration on vertical link of interconnected nodes in DNI of MDSP
|
China Unicom
|
Q9/15
|
2015-06-09 |
|
[ 1357 ]
|
Proposal of standardization for cascaded and nested protection of multiple OTN domains
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co., Ltd.
|
Q9/15, Q11/15
|
2015-06-09 |
|
[ 1356 ]
|
G.dpm: Proposed modifications to working text in sections 7.5 and 7.6 of the G.dpm draft Recommendation
|
Broadcom Corporation
|
Q4/15, Q18/15
|
2015-06-09 |
|
[ 1355 ]
|
ICTP primitives description
|
Alcatel-Lucent International
,
Calix Networks, Inc.
,
China Telecommunications Corporation
,
Huawei Technologies Co., Ltd.
,
Orange
,
Verizon Communication Corporation
|
Q2/15
|
2015-06-08 |
|
[ 1354 ]
(Rev.1) |
OTUC4 IrDI Format Decision Criteria
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1353 ]
|
Adaptation of Flex Ethernet to the OTN Transport Network
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1352 ]
|
B100G packet client adaptation into ODUflex
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1351 ]
|
400GE mapping
|
Inphi Corporation
|
Q11/15
|
2015-06-08 |
|
[ 1350 ]
|
G.8273: SyncE Transient Test
|
Calnex Solutions Limited
|
Q13/15
|
2015-06-08 |
|
[ 1349 ]
|
Impact of leaving events on G.993.2 Annex Q vectoring
|
Huawei Technologies Co., Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2015-06-08 |
Results:336 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):