Contributions
[ Source: Huawei Technologies Co. Ltd. ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 764 ]
|
G.vdsl: New 998ADE17 Band Plan for VDSL2
|
China Telecommunications Corporation
,
China Unicom
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 763 ]
|
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 762 ]
|
G.fast: On TIGA and SRA
|
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q4/15
|
2014-03-11 |
|
[ 747 ]
|
Information on Upcoming New Work on B100G OTN
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 739 ]
(Rev.1) |
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
|
Q2/15
|
2014-03-11 |
|
[ 737 ]
|
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 736 ]
|
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 735 ]
|
Proposal on Synchronization OAM in packet networks
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q13/15, Q10/15
|
2014-03-11 |
|
[ 697 ]
|
G.hn: Discussion on method for creating a secure G.hn domain
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q18/15
|
2014-03-11 |
|
[ 691 ]
|
proposal for TWDM PON Protection in G.989.1
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
,
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
|
Q2/15
|
2014-03-11 |
|
[ 687 ]
|
Consideration for 1588 over OTN by ESC
|
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 685 ]
|
Test and analysis about PTP over OTN by transparent mode
|
Calnex Solutions Limited
,
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-11 |
|
[ 667 ]
|
Component-based recursive description for software defined transport networks
|
China Telecommunications Corporation
,
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
|
Q14/15, Q12/15
|
2014-03-10 |
|
[ 666 ]
|
Virtualization for the software defined transport networks
|
China Telecommunications Corporation
,
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
|
Q14/15, Q12/15
|
2014-03-10 |
|
[ 663 ]
|
Proposal to start work on a Recommendation specifying the architecture of the software defined transport network
|
China Telecommunications Corporation
,
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
|
Q14/15, Q12/15
|
2014-03-10 |
|
[ 661 ]
|
Operation of One-Stage ODU SMP Protocols over B100G links
|
Huawei Technologies Co. Ltd.
,
Infinera Corporation
|
Q9/15
|
2014-03-10 |
|
[ 639 ]
(Rev.1) |
Synchronization over OTN network
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2014-03-10 |
|
[ 638 ]
|
Test error of PRTC of G.8272
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-03-10 |
|
[ 637 ]
|
Proposals for G.8275.1
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-03-10 |
|
[ 636 ]
(Rev.1) |
Effect of lower network limit on PTP slave clock
|
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 635 ]
|
SyncE transient measurement method for G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 634 ]
|
Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 633 ]
|
Physical layer frequency to PTP noise transfer gain peaking in G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 632 ]
|
Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2014-03-10 |
|
[ 631 ]
|
Proposal on 21 hops of G.8271.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2014-03-10 |
|
[ 630 ]
|
Proposal for Revision of Rec. L.53
|
Huawei Technologies Co. Ltd.
|
Q17/15
|
2014-03-10 |
|
[ 629 ]
|
Proposal for Appendix I of L.53
|
Huawei Technologies Co. Ltd.
|
Q17/15
|
2014-03-10 |
|
[ 628 ]
|
Proposal for studying intelligent node elements in optical fibre networks
|
China
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q16/15
|
2014-03-10 |
|
[ 623 ]
(Rev.1) |
1-stage and 2-stage Re-definition in ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 622 ]
|
Message Encoding Set Update for ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 621 ]
|
1-stage ODU SMP Protocol
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 620 ]
(Rev.1) |
APS Mechanisms in ODU SMP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 619 ]
|
Proposed functional models in MDSP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 618 ]
|
Interconnection solution for Ethernet linear protection in MDSP
|
Huawei Technologies Co. Ltd.
|
Q9/15
|
2014-03-10 |
|
[ 617 ]
|
Discussion on the scope of potential G.metro Recommendation
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2014-03-10 |
|
[ 616 ]
|
Discussion on the minimum SMSR for 100G applications in G.698.2
|
Huawei Technologies Co. Ltd.
|
Q6/15
|
2014-03-10 |
|
[ 615 ]
|
Proposal of power budget update in G.973
|
Huawei Technologies Co. Ltd.
|
Q8/15
|
2014-03-10 |
|
[ 614 ]
|
G.hn: Proposal for seamless domain merging procedure
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-03-10 |
|
[ 613 ]
|
G.hn: Proposal for handover procedure of SC function
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-03-10 |
|
[ 612 ]
|
G.hn: Text proposal for SC re-establishment procedure in G.hn
|
Huawei Technologies Co. Ltd.
|
Q18/15
|
2014-03-10 |
|
[ 586 ]
|
Proposal for time synchronization requirements
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q2/15, Q13/15
|
2014-03-10 |
|
[ 541 ]
|
Performance analysis of OTUC4 and OTLC4.16 frame alignment
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 540 ]
|
Logical lane format of OTUCn without FEC
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 539 ]
|
FEC options of OTUCn
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 538 ]
|
Proposed mapping for new FC and IB client signals
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 537 ]
|
Proposal for OTUCn, ODUCn and OPUCn Payload bit rates
|
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 536 ]
|
B100G FEC and logical lane considerations
|
China Mobile Communications Corporation
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 535 ]
|
B100G extension of G.709 and G.798
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 534 ]
|
Proposed text for optical layer overhead clauses 15, 15.1, 15.4 and 15.5
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2014-03-09 |
|
[ 533 ]
|
Optical layer overhead considerations and proposal for OTN B100G
|
Coriant GmbH & Co. KG
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q6/15, Q11/15
|
2014-03-09 |
Results:61 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):