Contributions
[ Source: ETRI ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 383 ]
|
Proposal to cross-connection release signal of 2-stage ODU SMP protocol
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 370 ]
|
Utilizing G.8031 APS protocol for per-leaf protection in MECP
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 369 ]
|
Propose to modify network objectives for G.mdsp
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 352 ]
|
Proposal to add OTU0 frame format into G.709
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
|
Q11/15
|
2013-06-18 |
|
[ 350 ]
|
Considerations in 2-stage ODU SMP protocol
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 349 ]
|
Proposal to support OAM on rooted-multipoint connection in G.8013
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q10/15
|
2013-06-18 |
|
[ 348 ]
|
Comments on the draft revised G.8011.4
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q10/15
|
2013-06-18 |
|
[ 347 ]
|
MECP per-tree protection - simultaneous condition
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 346 ]
|
MECP per-tree protection - operator's command initiated protection
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15
|
2013-06-18 |
|
[ 345 ]
|
Spectral excursion and wavelength tuning granularity parameter values to G.989.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
|
Q2/15
|
2013-06-18 |
|
[ 344 ]
(Rev.1) |
Parameter specifications proposal for NRZ 2.5G application codes in G.698.3
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
|
Q6/15
|
2013-06-18 |
|
[ 331 ]
|
G.698.3 considerations to add OTU0 frame format into G.709
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
SK Telecom
|
Q11/15
|
2013-06-18 |
|
[ 300 ]
|
Proposal to add an appendix for MPLS-TP packet data throughput to G.8112
|
Electronics and Telecommunications Research Institute (ETRI)
,
SK Telecom
|
Q10/15
|
2013-06-17 |
|
[ 187 ]
|
Proposal on initiating a new work item on transport SDN
Withdrawn: Duplicate of C-0148
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Ministry of Industry and Information Technology (MIIT)
,
Telecom Italia S.p.A.
,
ZTE Corporation
|
Q14/15, Q12/15
|
2013-06-17 |
|
[ 177 ]
|
Upstream inter-channel crosstalk impairment of TWDM-PON
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
|
Q2/15
|
2013-06-17 |
|
[ 176 ]
(Rev.1) |
Use case and requirements for metro WDM link
|
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
|
Q6/15
|
2013-06-17 |
|
[ 174 ]
(Rev.1-2) |
Eye mask for Proposed 200 GHz spaced 2.5 Gbps G.698.3 application code
|
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
|
Q6/15
|
2013-06-17 |
|
[ 148 ]
|
Proposal on initiating a new work item on transport SDN
|
China Mobile Communications Corporation
,
China Telecommunications Corporation
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Telecom Italia S.p.A.
,
ZTE Corporation
|
Q14/15, Q12/15
|
2013-06-16 |
|
[ 101 ]
|
G.metro scope proposal
|
ADVA Optical Networking
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
Ericsson-LG
,
Italy
,
Nokia Siemens Networks GmbH & Co. KG
,
Telefon AB - LM Ericsson
|
Q6/15
|
2013-06-14 |
Results:19 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):