International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:59 total items.
Result page:   -  1 - 2  -  Next
Contributions  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 306 ]  
 
G.fast: Proposal for Representation of Reported Error Samples     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 305 ]  
 
G.fast: DTUs acknowledgment working text     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 304 ]  
 
G.fast: Fast OLR behaviour under impulsive noise environment     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 303 ]  
 
G.fast: Robust OLR protocol     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 286 ]  
 
G.fast: TDD-frame and super-frame structure working text     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 280 ]  
 
G.fast: Scrambler working text     Lantiq Beteiligungs-GmbH & Co. KG , Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-17
[ 265 ]  
 
G.inp: Extension of ADSL L2 Link State Operation for Retransmission     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4/15   2013-06-17
[ 264 ]  
 
G.fast: Multi-Line PSD Mask Constraint     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4/15   2013-06-17
[ 261 ]  
 
G.fast: Non-Linear Precoder Ordering     Adaptive Spectrum and Signal Alignment (ASSIA) Inc.   Q4/15   2013-06-17
[ 242 ]  
 
G.fast: DRA Timing Requirements     ADTRAN   Q4/15   2013-06-17
[ 199 ]  
(Rev.1) 
G.fast: Initialization     Broadcom Corporation , Futurewei Technologies US R&D Center   Q4/15   2013-06-17
[ 198 ]  
 
G.hs,G.fast::Additional carrier sets for G.fast     ZTE Corporation   Q4/15   2013-06-17
[ 197 ]  
(Rev.1) 
G.fast: Fast OLR proposal.     Broadcom Corporation   Q4/15   2013-06-17
[ 196 ]  
(Rev.1) 
G.fast:. Improved On Line Reconfiguration for precoder update     Broadcom Corporation   Q4/15   2013-06-17
[ 195 ]  
(Rev.1) 
G.fast: RMC framing and impact on OLR.     Broadcom Corporation   Q4/15   2013-06-17
[ 194 ]  
(Rev.1) 
G.vdsl: Low power mode.     Broadcom Corporation   Q4/15   2013-06-17
[ 175 ]  
(Rev.1) 
G.hn, G.vdsl, G.fast : Powerline Interference Indication and Mitigation for DSL transceivers     AT&T, Inc. , Metanoia Technologies, Inc.   Q4/15, Q18/15   2013-06-17
[ 173 ]  
 
G.inp: Working Text for Power Efficient Transmission     Metanoia Technologies, Inc.   Q4/15   2013-06-17
[ 172 ]  
 
G.fast: SNR Loss in Discontinuous Operation     Metanoia Technologies, Inc.   Q4/15   2013-06-17
[ 143 ]  
 
Determining the Time Position of Upstream Probe Sequence     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 142 ]  
 
G.fast: On Discontinuous Operation     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 141 ]  
 
On Transition From L2.2 to Other States     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 140 ]  
 
Probe Sequence Modulation and Error Signal Feedback     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 139 ]  
 
On PSD Control in Vectoring     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 138 ]  
 
Asynchronous OLR for PSD Control     Huawei Technologies Co. Ltd.   Q4/15   2013-06-16
[ 132 ]  
 
G.bond: Shutting down some lines in a bonded group     AT&T, Inc.   Q4/15   2013-06-15
[ 108 ]  
 
G.fast: SOS-like Scheme as Fast OLR     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 107 ]  
 
G.fast: Transmitter Initiated Gain and Bit-Loading Adjustment     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 106 ]  
 
G.fast: Configuration of Gap Time Parameter Tg2     Futurewei Technologies US R&D Center   Q4/15   2013-06-14
[ 105 ]  
 
G.vdsl: Low Power Mode proposal and working text     TQ DELTA. LLC   Q4/15   2013-06-14
[ 104 ]  
(Rev.1) 
G.vector, G.hs: Potential Ghost Start Issue in G.vector     Ikanos Communications   Q4/15   2013-06-14
[ 102 ]  
 
G.fast: Maximum aggregate transmit power     Deutsche Telekom AG , Swisscom SA   Q4/15   2013-06-14
[ 73 ]  
 
G.It: Discussion on accuracy of multi-component measurements     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
[ 72 ]  
 
G.It: Request for revision of G.996.2 3-element capacitance measurement accuracies     Microsemi Semiconductor Corporation   Q4/15   2013-06-13
Results:59 total items.
Result page:   -  1 - 2  -  Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-27