Contributions
[ AI/Question: Q4/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 439 ]
(Rev.1) |
[FAST] Proposal for improvements to draft text for G.fast-psd
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 438 ]
|
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 437 ]
|
VDSL2 FTTdp annex
|
Orange
|
Q4/15
|
2013-06-18 |
|
[ 436 ]
|
[FAST] On Aggregate Transmitter Power
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 434 ]
|
[FAST] On Power Budget
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 431 ]
(Rev.1) |
[FAST] On VHF background noise assumptions for G.FAST
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 419 ]
|
G.fast: Discontinuous operation is not always the way to minimize power
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 413 ]
|
[FAST] Low Power Mode Requirements for G.FAST
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2013-06-18 |
|
[ 410 ]
|
G.fast: OLR procedures during G.fast initialization
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 406 ]
|
G.fast: DRA primitives and interface requirements at the gamma reference point
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 405 ]
|
G.fast: Energy Efficiency-performance trade-offs
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 404 ]
|
G.fast: Vectoring Backchannel Encapsulation
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 398 ]
|
G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2013-06-18 |
|
[ 378 ]
|
G.fast: Alternative samples report by FTU-R for downstream crosstalk estimation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 375 ]
|
G.vdsl2, G.inp: Considerations related to VDSL2 low power mode
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 373 ]
|
G.993.5: Initialization using extended O-P-VECTOR 1
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 339 ]
|
G.fast: Operations and maintenance (OAM)
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 338 ]
|
G.fast: G.fast performance over KPN cable
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 337 ]
(Rev.1) |
G.fast: Proposal for early stages of initialization
|
Lantiq Beteiligungs-GmbH & Co. KG
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 336 ]
|
G.vdsl2: Proposed corrigendum to G.993.2
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 335 ]
|
G.fast: Proposal for G.994.1 tones to be used in G.fast
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 334 ]
|
G.fast: Update of the working text for PMD section
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2013-06-18 |
|
[ 333 ]
(Rev.1) |
G.fast: Update of the working text for PMS-TC section
|
Lantiq Beteiligungs-GmbH & Co. KG
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-18 |
|
[ 332 ]
(Rev.1) |
G.lt: MELT accuracy for a multi-component measurement
|
Deutsche Telekom AG
,
Lantiq Beteiligungs-GmbH & Co. KG
,
Telecom Italia S.p.A.
|
Q4/15
|
2013-06-18 |
|
[ 307 ]
|
G.fast: Proposal for discontinuous operation
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 306 ]
|
G.fast: Proposal for Representation of Reported Error Samples
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 305 ]
|
G.fast: DTUs acknowledgment working text
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 304 ]
|
G.fast: Fast OLR behaviour under impulsive noise environment
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 303 ]
|
G.fast: Robust OLR protocol
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 286 ]
|
G.fast: TDD-frame and super-frame structure working text
|
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 280 ]
|
G.fast: Scrambler working text
|
Lantiq Beteiligungs-GmbH & Co. KG
,
Sckipio Technologies S.I. Ltd.
|
Q4/15
|
2013-06-17 |
|
[ 265 ]
|
G.inp: Extension of ADSL L2 Link State Operation for Retransmission
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2013-06-17 |
|
[ 264 ]
|
G.fast: Multi-Line PSD Mask Constraint
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2013-06-17 |
|
[ 261 ]
|
G.fast: Non-Linear Precoder Ordering
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
|
Q4/15
|
2013-06-17 |
|
[ 242 ]
|
G.fast: DRA Timing Requirements
|
ADTRAN
|
Q4/15
|
2013-06-17 |
|
[ 199 ]
(Rev.1) |
G.fast: Initialization
|
Broadcom Corporation
,
Futurewei Technologies US R&D Center
|
Q4/15
|
2013-06-17 |
|
[ 198 ]
|
G.hs,G.fast::Additional carrier sets for G.fast
|
ZTE Corporation
|
Q4/15
|
2013-06-17 |
|
[ 197 ]
(Rev.1) |
G.fast: Fast OLR proposal.
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 196 ]
(Rev.1) |
G.fast:. Improved On Line Reconfiguration for precoder update
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 195 ]
(Rev.1) |
G.fast: RMC framing and impact on OLR.
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 194 ]
(Rev.1) |
G.vdsl: Low power mode.
|
Broadcom Corporation
|
Q4/15
|
2013-06-17 |
|
[ 175 ]
(Rev.1) |
G.hn, G.vdsl, G.fast : Powerline Interference Indication and Mitigation for DSL transceivers
|
AT&T, Inc.
,
Metanoia Technologies, Inc.
|
Q4/15, Q18/15
|
2013-06-17 |
|
[ 173 ]
|
G.inp: Working Text for Power Efficient Transmission
|
Metanoia Technologies, Inc.
|
Q4/15
|
2013-06-17 |
|
[ 172 ]
|
G.fast: SNR Loss in Discontinuous Operation
|
Metanoia Technologies, Inc.
|
Q4/15
|
2013-06-17 |
|
[ 143 ]
|
Determining the Time Position of Upstream Probe Sequence
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 142 ]
|
G.fast: On Discontinuous Operation
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 141 ]
|
On Transition From L2.2 to Other States
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 140 ]
|
Probe Sequence Modulation and Error Signal Feedback
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 139 ]
|
On PSD Control in Vectoring
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
|
[ 138 ]
|
Asynchronous OLR for PSD Control
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2013-06-16 |
Results:59 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):