Contributions
[ AI/Question: Q13/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 440 ]
|
clockClass usage in G.8275.1
|
Orange
|
Q13/15
|
2013-06-19 |
|
[ 425 ]
|
Priority1 parameter and Domain number in G.8275.1
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2013-06-18 |
|
[ 424 ]
|
G.8261.1: PDV Network Limit
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2013-06-18 |
|
[ 423 ]
|
Clock classes and selection algorithm in G.8275.1
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2013-06-18 |
|
[ 412 ]
|
Way forward on PDV network limits in G.8261.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 411 ]
|
Updated text for the new Appendix "Evaluation of the Packet Delay Variation generation and asymmetry in a network node" in G.8261.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 409 ]
|
PTP attributes values in G.8275.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 408 ]
|
Text for Annex A of G.8275.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 407 ]
|
Phase/time network limits in G.8271.1
|
Orange
|
Q13/15
|
2013-06-18 |
|
[ 382 ]
|
FPP metric informal correspondence - Summary, further results and proposal for Study Point 3
|
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
|
Q13/15
|
2013-06-18 |
|
[ 381 ]
|
FPP metric informal correspondence - Summary and proposal for Study Point 1
|
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
|
Q13/15
|
2013-06-18 |
|
[ 380 ]
|
FPP metric informal correspondence - Summary and proposal on the Agreements
|
Calnex Solutions Limited
,
RAD Data Communications, Ltd.
|
Q13/15
|
2013-06-18 |
|
[ 361 ]
|
Complementary data for reroute detection mechanisms
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
|
[ 360 ]
|
Signalling TLV for distribution of timing information
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
|
[ 359 ]
|
Self Monitoring Synchronization Network Comprised Of Probing Master/BC Nodes
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
|
[ 358 ]
|
Concerns about Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
|
[ 357 ]
|
Alternative Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
|
[ 355 ]
|
Method for estimation Gamma distribution parameters based on FPP and Maximal Delay.
|
ADVA Optical Networking
|
Q13/15
|
2013-06-18 |
|
[ 329 ]
|
Proposed amendment material for G.8251 on OTU3.4 jitter
|
PMC-Sierra, Inc.
|
Q13/15
|
2013-06-18 |
|
[ 325 ]
|
Text for Annex B of G.8273
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 322 ]
|
Summary Text for G.8273 Annex A: Clause A.1
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 321 ]
|
Summary Text for G.8273 Annex A: Clause A.2 through A.5
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 316 ]
|
Text for Annex A of G.8273 section A.1.2
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 315 ]
|
Text for Annex A of G.8273 section A.1.x
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 314 ]
|
Text for Annex A of G.8273 section A.1
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 313 ]
|
Further discussion regarding definition of "floor" in time-transfer application
|
Ixia
,
Symmetricom
|
Q13/15
|
2013-06-18 |
|
[ 312 ]
|
Discussion regarding definition of "floor" in time-transfer application
|
Ixia
,
Symmetricom
|
Q13/15
|
2013-06-18 |
|
[ 311 ]
|
Analysis of Cluster-width and packet-selection window interaction
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 310 ]
|
Normal operation of telecom-grade network elements for supporting packet-based timing
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 309 ]
|
Figures for measurement of combined (PRTC+T-GM)
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 308 ]
|
Network Limit at Reference points C and D in G.8271.1
|
Ixia
|
Q13/15
|
2013-06-18 |
|
[ 302 ]
|
G.8275.1: Clarification on the contents of Announce Messages
|
Juniper Networks
|
Q13/15
|
2013-06-17 |
|
[ 301 ]
|
G.8273.2: Packet Selection for T-BCs and T-TSCs for PTP Time/Phase Profiles
|
Juniper Networks
|
Q13/15
|
2013-06-17 |
|
[ 296 ]
|
Revision of network limits in G.8271.1
|
Calnex Solutions Limited
,
Huawei Technologies Co. Ltd.
,
Telefon AB - LM Ericsson
|
Q13/15
|
2013-06-17 |
|
[ 295 ]
(Rev.1) |
Mitigation of time error due to SyncE transients in G.8273.2
|
Telefon AB - LM Ericsson
|
Q13/15
|
2013-06-17 |
|
[ 294 ]
|
Coexistence of different profiles in G.8275
|
Telefon AB - LM Ericsson
|
Q13/15
|
2013-06-17 |
|
[ 284 ]
(Rev.1) |
Q13/15 Synchronization Requirements Structure
|
Deutsche Telekom AG
|
Q13/15
|
2013-06-17 |
|
[ 275 ]
|
Re-arrangement times for G.8271.1 HRM topologies
|
Alcatel-Lucent USA Inc.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 274 ]
|
Development of Slave Clock Specifications for Different Use Cases
|
Sprint
|
Q13/15
|
2013-06-17 |
|
[ 272 ]
(Rev.1) |
Service Requirements for Manageable Synchronization Infrastructure
|
Alcatel-Lucent USA Inc.
,
Sprint
|
Q13/15
|
2013-06-17 |
|
[ 259 ]
|
G.8271.1 Appendix VI modifications for cTE classes [G.8271.1]
|
Vitesse Semiconductor Corporation
|
Q13/15
|
2013-06-17 |
|
[ 258 ]
|
PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]
|
Cisco Systems, Inc.
,
Vitesse Semiconductor Corporation
|
Q13/15
|
2013-06-17 |
|
[ 253 ]
|
Static noise generation of G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
|
[ 252 ]
|
Delay_Req Transmission Requirements in G.8275.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2013-06-17 |
|
[ 251 ]
|
Proposals for G.8275.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2013-06-17 |
|
[ 250 ]
|
Proposal for default value for offsetScaledLogVariance, for G.8275.1
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2013-06-17 |
|
[ 249 ]
|
Discussion of Noise Tolerance in G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2013-06-17 |
|
[ 248 ]
|
Proposal for Time Noise Transfer in G.8273.2
|
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orange
|
Q13/15
|
2013-06-17 |
|
[ 247 ]
|
Proposed Text for Method 3 of G.8263-Testing
|
Calnex Solutions Limited
,
Huawei Technologies Co. Ltd.
,
Nokia Siemens Networks GmbH & Co. KG
,
Orange
|
Q13/15
|
2013-06-17 |
|
[ 246 ]
|
Proposed Correction to Annex C of ITU-T Rec. O.172
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2013-06-17 |
Results:87 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):