International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:440 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 440 ]  
 
clockClass usage in G.8275.1     Orange   Q13/15   2013-06-19
[ 439 ]  
(Rev.1) 
[FAST] Proposal for improvements to draft text for G.fast-psd     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 438 ]  
 
Extended RAM and Retransmission in VDSL2 on Vector Capable Hardware     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 437 ]  
 
VDSL2 FTTdp annex     Orange   Q4/15   2013-06-18
[ 436 ]  
 
[FAST] On Aggregate Transmitter Power     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 435 ]  
 
G.hn: a mechanism to protect specified slots from neighbouring interfering nodes     Sigma Designs Israel S.D.I Ltd.   Q18/15   2013-06-18
[ 434 ]  
 
[FAST] On Power Budget     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 433 ]  
 
G.hn: Proposal to reduce the number of valid combinations in RCM     Sigma Designs Israel S.D.I Ltd.   Q18/15   2013-06-18
[ 432 ]  
+Add.1 
10G Upstream Optical Parameters     Alcatel-Lucent Deutschland AG   Q2/15   2013-06-18
[ 431 ]  
(Rev.1) 
[FAST] On VHF background noise assumptions for G.FAST     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 430 ]  
 
Proposed text for draft G.MDSP based on existing OTN material     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 429 ]  
 
Considerations regarding G.MDSP     Alcatel-Lucent Italia S.p.A.   Q9/15   2013-06-18
[ 428 ]  
 
Definition of the "local add/drop" criteria in G.672     Deutsche Telekom AG   Q7/15   2013-06-18
[ 427 ]  
 
Comments on circulated draft version of G.808.2     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 426 ]  
 
Proposed enhancement of G.873.2     Alcatel-Lucent Deutschland AG   Q9/15   2013-06-18
[ 425 ]  
 
Priority1 parameter and Domain number in G.8275.1     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2013-06-18
[ 424 ]  
 
G.8261.1: PDV Network Limit     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2013-06-18
[ 423 ]  
 
Clock classes and selection algorithm in G.8275.1     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2013-06-18
[ 422 ]  
(Rev.1) 
MAC DA setting for Ethernet OAM frames     Alcatel-Lucent Italia S.p.A.   Q9/15, Q10/15   2013-06-18
[ 421 ]  
(Rev.1) 
Considerations regarding ETH-VSP and ETH-EXP OAM functions     Alcatel-Lucent Italia S.p.A.   Q10/15   2013-06-18
[ 420 ]  
 
Proposed update to ITU-T Y.1731 TLVs registry     Telecom Italia S.p.A.   Q10/15   2013-06-18
[ 419 ]  
 
G.fast: Discontinuous operation is not always the way to minimize power     Sckipio Technologies S.I. Ltd.   Q4/15   2013-06-18
[ 418 ]  
 
Discussion and proposal on progress in MPLS-TP linear protection     Nippon Telegraph and Telephone Corporation (NTT)   Q9/15   2013-06-18
[ 417 ]  
 
Proposed text for G.mdsp     Alcatel-Lucent Italia S.p.A. , Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 416 ]  
 
Recent progress and discussion on MPLS-TP P2MP     Nippon Telegraph and Telephone Corporation (NTT)   Q12/15, Q10/15   2013-06-18
[ 415 ]  
 
Proposal to continue security of optical infrastructure considerations     TELEKOMUNIKACJA POLSKA S.A.   Q17/15   2013-06-18
[ 414 ]  
 
Inputs on procedures for transport SDN discussion     Nippon Telegraph and Telephone Corporation (NTT)   Q14/15, Q12/15   2013-06-18
[ 413 ]  
 
[FAST] Low Power Mode Requirements for G.FAST     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2013-06-18
[ 412 ]  
 
Way forward on PDV network limits in G.8261.1     Orange   Q13/15   2013-06-18
[ 411 ]  
 
Updated text for the new Appendix "Evaluation of the Packet Delay Variation generation and asymmetry in a network node" in G.8261.1     Orange   Q13/15   2013-06-18
[ 410 ]  
 
G.fast: OLR procedures during G.fast initialization     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2013-06-18
[ 409 ]  
 
PTP attributes values in G.8275.1     Orange   Q13/15   2013-06-18
[ 408 ]  
 
Text for Annex A of G.8275.1     Orange   Q13/15   2013-06-18
[ 407 ]  
 
Phase/time network limits in G.8271.1     Orange   Q13/15   2013-06-18
[ 406 ]  
 
G.fast: DRA primitives and interface requirements at the gamma reference point     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 405 ]  
 
G.fast: Energy Efficiency-performance trade-offs     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 404 ]  
 
G.fast: Vectoring Backchannel Encapsulation     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 403 ]  
 
Requirements for passive Metro DWDM interfaces     Deutsche Telekom AG   Q6/15, Q11/15   2013-06-18
[ 402 ]  
 
Requirements for Beyond 100G OTN     Nippon Telegraph and Telephone Corporation (NTT)   Q11/15   2013-06-18
[ 401 ]  
 
Application scenarios using new Metro DWDM interfaces     Deutsche Telekom AG   Q6/15, Q11/15   2013-06-18
[ 400 ]  
 
The difference of the trib and line side between the existing OTN and B100G OTN     FiberHome Technologies Group   Q11/15   2013-06-18
[ 399 ]  
 
The requirement of optical overhead extend at IrDI     China Unicom , FiberHome Technologies Group   Q11/15   2013-06-18
[ 398 ]  
 
G.fast: On Line Reconfiguration for Precoder Gain Scaling: working text figures     Alcatel-Lucent Bell N.V.   Q4/15   2013-06-18
[ 397 ]  
 
The discussion about OTM- n.m IaDI interface of B100G     China Mobile Communications Corporation , FiberHome Technologies Group   Q11/15   2013-06-18
[ 396 ]  
 
The suggestion about OTM-0.mvn IrDI interface of B100G     China Mobile Communications Corporation , China Mobile Communications Corporation   Q11/15   2013-06-18
[ 395 ]  
 
Support for Ethernet linear protection solutions applicable to DNI scenarios     Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 394 ]  
 
Selection of protection transport entities in m1 SMP architecture     FiberHome Technologies Group   Q9/15   2013-06-18
[ 393 ]  
 
Editorial suggestions for G.8131.1     FiberHome Technologies Group   Q9/15   2013-06-18
[ 392 ]  
 
G.mdsp proposed new network objectives     Telecom Italia S.p.A.   Q9/15   2013-06-18
[ 391 ]  
 
Version of ring APS PDUs in Y.1731 and editorial comments on Y.1731     Alcatel-Lucent USA Inc.   Q10/15   2013-06-18
Results:440 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19