International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : TSAG : Meeting 2012-07-02 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T TSAG  TD (2012-07-02) 

ITU-T TSAG

Telecommunication Standardization Advisory Group

Study Period 2009

Meeting  from 2012-07-02 to 2012-07-04

held in Switzerland [Geneva]

Other Meetings : [ 2012-07-02 ]  2012-01-10  2011-02-08  2010-02-08  2009-04-28 

Results:15 total items.
Temporary Documents  (GEN)  [ Source: Director, TSB ]   Documents / Contributions
 
Number 
Title Source Date
[ 0459 ]  
 
Academia: Proposed rights for academia and TSB action plan     Director, TSB   2012-07-03
[ 0455 ]  
 
Director TSB's Proposals on Editorial Updates to WTSA-08 Resolutions     Director, TSB   2012-07-03
[ 0452 ]  
(Rev.1) 
Update on MPLS-TP Recommendations in SG15     Director, TSB   2012-07-02
[ 0446 ]  
 
TSB response to TSAG C.122 (Canada)     Director, TSB   2012-07-01
[ 0437 ]  
 
Workshop on Sector Membership - Outcomes Report     Director, TSB   2012-06-28
[ 0425 ]  
+Add.1 
DRAFT TSB Director's Report for WTSA-12: ITU-T Highlights of 2009-2012     Director, TSB   2012-06-23
[ 0423 ]  
 
WTSA-08 Action Plan Progress Report, V.8.0 (22 June 2012)     Director, TSB   2012-06-23
[ 0422 ]  
 
Gender mainstreaming in ITU-T and TSB     Director, TSB   2012-06-23
[ 0421 ]  
 
Report by the Secretary-General - Conformance and Interoperability Programme status report and proposed action plan     Director, TSB   2012-06-22
[ 0420 ]  
 
e-health standardization and interoperability     Director, TSB   2012-06-22
[ 0414 ]  
 
Impact of Radiocommunication Assembly (RA-12) and World Radiocommunication Conference (WRC-12) on ITU-T     Director, TSB   2012-06-25
[ 0403 ]  
 
Confirmed Report on the Eleventh meeting of the IEC/ISO/ITU World Standards Cooperation (WSC)     Director, TSB   2012-06-19
[ 0400 ]  
 
Electronic working methods services and database applications     Director, TSB   2012-06-19
[ 0398 ]  
 
Draft four-year Rolling Operational Plan for the 2013 to 2016 timeframe     Director, TSB   2012-06-14
[ 0394 ]  
 
Kaleidoscope 2013     Director, TSB   2012-06-08
Results:15 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-6