Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
17
total items.
Contributions
[ Source: Swisscom ]
Number
Title
Source
AI/Question
Filter...
Q1/15
Q12/15
Q2/15
Q3/15
Q4/15
Q4A/15
Clear filter
Date
[ 2322 ]
(Rev.1)
Terminology for Sub-Lambda Photonically Switched Network (SLPSN)
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
Q3/15
,
Q12/15
2012-08-28
[ 2024 ]
G.fast: Limitations on cyclic prefix length
Swisscom SA
Q4A/15
2012-08-24
[ 2022 ]
G.fast: Requirements for VDSL2 emulation on G.fast hardware
Swisscom SA
Q4A/15
2012-08-24
[ 1527 ]
(Rev.1-3)
Standardization of optical switching (photonic sub-lambda switching)
France Télécom Orange
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
Q12/15
2011-11-15
[ 1390 ]
G.vdsl: Operator control of transitions out of showtime (Reinit policies)
Swisscom
Q4/15
2011-02-01
[ 1359 ]
(Rev.1)
Enhancements of the supported G.inp rates for VDSL2 lines operating in conjunction with vectoring
Telecom Italia
,
France Telecom Orange
,
Swisscom
,
TNO
Q4/15
2011-02-01
[ 1278 ]
G.vdsl: Support for text proposal for Attainable Net Data rate
Swisscom
Q4/15
2011-01-31
[ 1276 ]
G.vdsl: Support for text proposal for Short Interruption Monitoring
Swisscom
Q4/15
2011-01-31
[ 1274 ]
G.vdsl: Support for Alternative Electrical Length Estimation Method
Swisscom
Q4/15
2011-01-31
[ 850 ]
VDSL2 issues for discussion at dedicated DSL meetings
Swisscom Ltd
Q4/15
2010-05-17
[ 824 ]
Vectoring-friendly VTU-R
Alcatel-Lucent
,
Belgacom
,
Swisscom
Q4/15
2010-05-17
[ 785 ]
Proposed ITU-T Rec. on remote management of CPE
Alcatel-Lucent
,
BT
,
Cable & Wireless Communications
,
France Telecom Orange
,
Nokia Siemens Networks
,
Swisscom
,
Technicolor
,
Telecom Italia
Q4/15
,
Q2/15
,
Q1/15
2010-05-14
[ 591 ]
G.VDSL: VDSL2 resynchronisation stability needs to be improved
TNO
,
Swisscom
Q4/15
2009-09-18
[ 484 ]
G.vector: Swisscom's views on vectoring
Swisscom (Switzerland) Ltd.
Q4/15
2009-09-17
[ 183 ]
G.inp: Outline compromise proposal for error correction by retransmission protocol
BT plc, Deutsche Telekom AG, Swisscom, Telecom Italia, Telenor ASA
Q4/15
2008-11-21
[ 182 ]
G.inp: Requirements for a compromise error correction by retransmission protocol for VDSL2 and ADSL2/ADSL2plus
BT plc, Deutsche Telekom AG, Swisscom, Telecom Italia, Telenor ASA, TNO
Q4/15
2008-11-21
[ 113 ]
G.ploam: Improvement of xTU-R Inventory Information
Swisscom
Q4/15
2008-11-20
Results:
17
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2024-9-20