International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:17 total items.
Contributions  [ Source: Infineon Technologies AG ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 300 ]  
 
Retransmission management in the TPS-TC layer     Infineon Technologies AG   Q4/15   2008-11-23
[ 281 ]  
 
G.hn: Proposal for maximum wideband transmit power     Infineon Technologies AG   Q4/15   2008-11-23
[ 280 ]  
 
G.hn: Proposal for text describing G.hn threat model     Infineon Technologies AG   Q4/15   2008-11-23
[ 268 ]  
 
G.hn: Proposal for fixed window setting     Infineon Technologies AG   Q4/15   2008-11-21
[ 267 ]  
 
G.hn: Proposal to associate EVM values with the transmit power levels     Infineon Technologies AG, DS2   Q4/15   2008-11-21
[ 262 ]  
 
G.INP: Further Details on Error Monitoring, OAM and Traffic Differentiation with the Unified Retransmission Method     Infineon Technologies AG   Q4/15   2008-11-21
[ 261 ]  
 
G.hn: Proposal to use a single indexing rule     Infineon Technologies AG   Q4/15   2008-11-21
[ 258 ]  
 
G.inp: Limitations of the PMS-TC Retransmisssion Scheme     Infineon Technologies AG   Q4/15   2008-11-21
[ 231 ]  
 
G.lt: Proposal for MELT annex for G.lt     Infineon Technologies AG   Q4/15   2008-11-21
[ 228 ]  
 
G.vector: Proposal for signaling of upstream vectoring parameters     Infineon Technologies AG   Q4/15   2008-11-21
[ 144 ]  
 
G.hn: Proposed updates for description of profiles     Infineon Technologies AG   Q4/15   2008-11-20
[ 143 ]  
 
G.hn: Proposal for the range of center frequencies for RF coax     Infineon Technologies AG   Q4/15   2008-11-20
[ 142 ]  
 
G.hn: Proposal on limit PSD mask for coax     Infineon Technologies AG   Q4/15   2008-11-20
[ 141 ]  
 
G.hn: Advantages of MAC frame encryption     Infineon Technologies AG, DS2   Q4/15   2008-11-20
[ 140 ]  
 
G.vector: Duration of FEXT estimation phases in G.vector initialization     Infineon Technologies AG   Q4/15   2008-11-20
[ 139 ]  
 
G.vector: Proposal for extended SOC channel     Infineon Technologies AG   Q4/15   2008-11-20
[ 128 ]  
 
G.ADSL2, G.ADSL2+, G.HS, G.VDSL2: Short CL, Short CLR behavior issue in multimode modems supported ADSL2x and VDSL2     Infineon Technologies AG   Q4/15   2008-11-20
Results:17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-29