Contributions
[ Source: AT&T ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2053 ]
(Rev.1) |
Development of a new PTP Profile for Time/Phase Distribution
|
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
|
Q13/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2032 ]
|
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
|
Q4A/15
|
2012-08-24 |
|
[ 1723 ]
(Rev.1) |
Request for evaluation of OTN support for CPRI
|
AT&T, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1722 ]
(Rev.1) |
G.798 PT Interworking Smart?
|
AT&T, Inc.
|
Q9/15
|
2011-11-21 |
|
[ 1697 ]
(Rev.1) |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-21 |
|
[ 1567 ]
|
Principle of Cooperation and Lines of Responsibility
|
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15
|
2011-11-18 |
|
[ 1329 ]
|
Rationale for support of 1SL in Y.1731 and G.8021
|
AT&T
,
Verizon
|
Q9/15, Q10/15
|
2011-02-01 |
|
[ 1308 ]
|
Reporting of results for pro-active measurement using SLM
|
Cisco
,
AT&T
|
Q9/15
|
2011-02-01 |
|
[ 1305 ]
|
Procedural issues on MPLS-TP
|
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-02-01 |
|
[ 1303 ]
|
Inter SDO Cooperation on MPLS-TP
|
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5
|
2011-02-01 |
|
[ 1300 ]
|
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021
|
Verizon
,
AT&T
|
Q9/15, Q10/15
|
2011-02-01 |
|
[ 1290 ]
|
Reporting of results for pro-active measurement using SLM
|
Cisco
,
AT&T
|
Q9/15
|
2011-02-01 |
|
[ 1157 ]
|
G.ploam: Proposed Text for Upstream Xlog Test Parameter
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1156 ]
|
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1155 ]
|
G.hnem: G.hnem management
|
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
|
Q4/15
|
2011-01-31 |
|
[ 1154 ]
|
G.Gen, G.hx, G.cx: G.hn and G.cx management
|
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
|
Q4/15
|
2011-01-31 |
|
[ 1153 ]
|
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1152 ]
|
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
|
ASSIA
,
AT&T
|
Q4/15
|
2011-01-31 |
|
[ 1148 ]
|
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
|
AT&T
|
Q4/15
|
2011-01-30 |
|
[ 1127 ]
(Rev.1) |
Proposal to define IPv6 host config ME in G.988
|
Ericsson, AT&T, Alcatel-Lucent
|
Q2/15
|
2011-01-28 |
|
[ 1025 ]
|
Clarification on ODU Multiplexing
|
AT&T
|
Q13/15, Q12/15
|
2010-05-20 |
|
[ 807 ]
|
G.hn Management and Diagnostics Specifications
|
AT&T
|
Q4/15
|
2010-05-16 |
|
[ 806 ]
|
Proposed ITU-T Rec. on remote management of CPE
|
AT&T
,
ASSIA Inc
,
Qwest
,
Verizon
|
Q4/15, Q2/15, Q1/15
|
2010-05-16 |
|
[ 433 ]
|
Multi-lane STM-256
|
AT&T
|
Q11/15
|
2009-09-16 |
|
[ 432 ]
|
Optical Monitoring
|
AT&T
|
Q7/15, Q6/15
|
2009-09-16 |
|
[ 431 ]
|
G.709 "Black Link" OTM-1r.m Interface as IrDI
|
AT&T
|
Q6/15, Q12/15, Q11/15
|
2009-09-16 |
|
[ 430 ]
|
G.709 OTN domains
|
AT&T
|
Q11/15
|
2009-09-16 |
|
[ 412 ]
(Rev.1) |
Latency Measurements in the Optical Transport Network Using G.709 Overhead
|
Verizon
,
AT&T
,
BT
,
Nokia Siemens Networks
|
Q9/15, Q11/15
|
2009-09-15 |
|
[ 379 ]
|
Methods for Measuring Multipoint Services Availability
|
Cisco Ciena; China Telecom
,
AT&T
,
Broadcom Corporation
,
Ciena Corporation
,
Verizon
|
Q9/15, Q10/15
|
2009-09-10 |
|
[ 364 ]
|
G.INP: Proposed Title and Scope for G.INP
|
AT&T
|
Q4/15
|
2009-09-09 |
|
[ 341 ]
|
Living List for proposed "10Gigabit-capable Passive Optical Networks (XG-PON): General Requirements"
|
AT&T, France Telecom, NTT
|
Q2/15
|
2009-05-05 |
|
[ 340 ]
|
Proposal to standardize "10Gigabit-capable Passive Optical Networks (XG-PON): General Requirements"
|
AT&T, France Telecom, NTT
|
Q2/15
|
2009-05-05 |
|
[ 110 ]
|
Standardization of G.709 Bit Rate Compliant Transparent Transport of 10GBase-R Clients in G.7041 and G.709
|
AT&T, Lucent, Ciena, PMC-Sierra
|
Q11/15
|
2008-11-20 |
|
[ 105 ]
|
G.8021 Appendix II Correction
|
AT&T
|
Q9/15
|
2008-11-20 |
|
[ 34 ]
|
Proposed ODU0 structure and multiplexing
|
PMC-Sierra, Lucent Technologies, AT&T & Ciena Corp
|
Q11/15
|
2008-11-19 |
|
[ 30 ]
|
Status of ATIS NIPP-NAI Technical Report on MIMO Crosstalk Channel Model
|
AT&T, Conexant, ASSIA
|
Q4/15
|
2008-11-18 |
|
[ 29 ]
|
G.hn: Proposal for G.hn Foundation Content
|
AT&T, Aware, Conexant, Intel
|
Q4/15
|
2008-11-18 |
|
[ 9 ]
|
Proposed G.993.2 Annex A reference to ATIS NIPP TR on Upstream Power Back Off Parameters.
|
AT&T, Conexant, ASSIA Inc.
|
Q4/15
|
2008-11-17 |
Results:39 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):