Français
Español
Home
:
ITU-T
:
SG15
:
Contributions
Recently posted
-
Search Meeting Documents
ITU-T SG15 C
ITU-T SG15
Max # of documents displayed/page:
Transport network structures
Study Period 2009
Results:
78
total items.
Result page:
1
-
2
-
Next
Contributions
[ Source: AT ]
Number
Title
Source
AI/Question
Filter...
Q1/15
Q1/5
Q10/15
Q11/15
Q12/15
Q13/15
Q14/15
Q15/15
Q2/15
Q3/15
Q4/15
Q4A/15
Q6/15
Q7/15
Q9/15
QALL/15
Clear filter
Date
[ 2053 ]
(Rev.1)
Development of a new PTP Profile for Time/Phase Distribution
AT&T, Inc.
,
Sprint
,
SymmetriCom, Inc.
,
Verizon Communication Corporation
Q13/15
2012-08-24
[ 2045 ]
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
AT&T, Inc.
,
Ciena Corporation
Q9/15
,
Q14/15
,
Q13/15
,
Q11/15
2012-08-24
[ 2032 ]
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
Q4A/15
2012-08-24
[ 1723 ]
(Rev.1)
Request for evaluation of OTN support for CPRI
AT&T, Inc.
Q13/15
2011-11-21
[ 1722 ]
(Rev.1)
G.798 PT Interworking Smart?
AT&T, Inc.
Q9/15
2011-11-21
[ 1697 ]
(Rev.1)
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France Télécom Orange
,
Telecom Italia S.p.A.
Q4/15
2011-11-21
[ 1567 ]
Principle of Cooperation and Lines of Responsibility
AT&T, Inc.
,
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
QALL/15
2011-11-18
[ 1329 ]
Rationale for support of 1SL in Y.1731 and G.8021
AT&T
,
Verizon
Q9/15
,
Q10/15
2011-02-01
[ 1308 ]
Reporting of results for pro-active measurement using SLM
Cisco
,
AT&T
Q9/15
2011-02-01
[ 1305 ]
Procedural issues on MPLS-TP
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
Q9/15
,
Q3/15
,
Q14/15
,
Q12/15
,
Q11/15
,
Q10/15
,
Q1/15
2011-02-01
[ 1303 ]
Inter SDO Cooperation on MPLS-TP
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
Q9/15
,
Q3/15
,
Q14/15
,
Q12/15
,
Q10/15
,
Q1/5
2011-02-01
[ 1300 ]
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021
Verizon
,
AT&T
Q9/15
,
Q10/15
2011-02-01
[ 1290 ]
Reporting of results for pro-active measurement using SLM
Cisco
,
AT&T
Q9/15
2011-02-01
[ 1249 ]
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile
CATR
,
China Mobile
Q10/15
2011-01-31
[ 1248 ]
PTN GACh+Y.1731 OAM interoperability test activities and result
CATR
,
China Mobile
Q9/15
,
Q14/15
,
Q12/15
,
Q10/15
2011-01-31
[ 1235 ]
Proposal on maximum PTP clock number in the time reference model
CMCC
,
CATR
,
ZTE
Q13/15
2011-01-31
[ 1234 ]
TOD specification
CMCC
,
CATR
,
Huawei
,
ZTE
Q13/15
2011-01-31
[ 1157 ]
G.ploam: Proposed Text for Upstream Xlog Test Parameter
ASSIA
,
AT&T
Q4/15
2011-01-31
[ 1156 ]
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector
ASSIA
,
AT&T
Q4/15
2011-01-31
[ 1155 ]
G.hnem: G.hnem management
ASSIA
,
AT&T
,
Aware
,
Maxim Integrated Product
,
Texas Instruments
Q4/15
2011-01-31
[ 1154 ]
G.Gen, G.hx, G.cx: G.hn and G.cx management
ASSIA
,
AT&T
,
Aware
,
Marvell Semiconductor
Q4/15
2011-01-31
[ 1153 ]
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2
ASSIA
,
AT&T
Q4/15
2011-01-31
[ 1152 ]
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses
ASSIA
,
AT&T
Q4/15
2011-01-31
[ 1148 ]
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
AT&T
Q4/15
2011-01-30
[ 1127 ]
(Rev.1)
Proposal to define IPv6 host config ME in G.988
Ericsson, AT&T, Alcatel-Lucent
Q2/15
2011-01-28
[ 1124 ]
Structure and content of the MPLS-TP Recommendations
CMCC,CT , CATR
Q9/15
,
Q14/15
,
Q12/15
,
Q10/15
2011-01-28
[ 1123 ]
Associated Channel Type for G.tpoam
CMCC, CT,CATR
Q9/15
,
Q14/15
,
Q12/15
,
Q10/15
2011-01-28
[ 1090 ]
SD triggered protection switching in G.8031
CATR
,
Huawei
Q9/15
2010-05-21
[ 1070 ]
1588v2 transmission by OSC over OTN
FiberHome
,
CATR
,
ZTE
Q13/15
,
Q11/15
2010-05-21
[ 1067 ]
GPS timing receiver characterization
Symmetricom
,
CATR
,
CMCC
Q13/15
,
Q11/15
2010-05-21
[ 1066 ]
Analysis of time synchronization performance using PTP in hybrid transport network
CMCC
,
CATR
,
ZTE
Q13/15
,
Q11/15
2010-05-21
[ 1065 ]
Proposal of accelerating MTIE and TDEV mask study for time synchronization
CMCC
,
CATR
,
Huawei
,
ZTE
Q13/15
2010-05-21
[ 1064 ]
Proposal of research on link asymmetry compensation for PTP
CMCC, ZTE, CATR
Q13/15
2010-05-21
[ 1062 ]
Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth
CATR
Q15/15
2010-05-21
[ 1061 ]
Proposal of revising for SSM message delay description in G.8264
CATR
Q13/15
2010-05-21
[ 1060 ]
Objectives and Requirements for G.827x Recommendations
CATR
,
Huawei
Q13/15
2010-05-21
[ 1059 ]
Functionality proposals about MPLS-TP OAM toolsets in G.tpoam
CATR
Q10/15
2010-05-21
[ 1057 ]
Some consideration with 40G intra-office interface parameters
CATR
Q6/15
2010-05-21
[ 1056 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39
CATR
,
Huawei
Q6/15
2010-05-21
[ 1055 ]
40G application code for G.698.2
CATR
Q6/15
2010-05-21
[ 1048 ]
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39
CATR
Q6/15
2010-05-22
[ 1041 ]
Issues about metrics of network limits for time synchronization
ZTE
,
CATR
,
CMCC
Q13/15
2010-05-20
[ 1040 ]
Field test of 1588v2 time sync based on physical layer frequency sync support
ZTE
,
CATR
,
CMCC
Q13/15
2010-05-20
[ 1037 ]
1588v2 test results with different clock mode and field network
ZTE
,
CATR
,
CMCC
Q13/15
2010-05-20
[ 1025 ]
Clarification on ODU Multiplexing
AT&T
Q13/15
,
Q12/15
2010-05-20
[ 904 ]
G.827x Recommendations - High-Level Objectives
Huawei
,
CATR
,
MII
Q13/15
2010-05-18
[ 903 ]
Pulse-Per-Second Interface
Huawei
,
CATR
,
China Mobile Communications Corporation
,
MII
Q13/15
2010-05-18
[ 823 ]
Propose to add an appendix to describe EVPRM solution to G.8011.4
Alcatel Lucent Shanghai Bell
,
CATR
,
Ministry of Information Industry of P.R. of China
Q10/15
2010-05-17
[ 807 ]
G.hn Management and Diagnostics Specifications
AT&T
Q4/15
2010-05-16
[ 806 ]
Proposed ITU-T Rec. on remote management of CPE
AT&T
,
ASSIA Inc
,
Qwest
,
Verizon
Q4/15
,
Q2/15
,
Q1/15
2010-05-16
Results:
78
total items.
Result page:
1
-
2
-
Next
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2025-5-10