Contributions
[ AI/Question: Q14/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2388 ]
|
Proposal of study items for multi-layer/multi-technology converged transport networks
|
NTT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2387 ]
|
Proposal of clarification of requirements for MPLS-TP p2mp transport path
|
NTT
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2342 ]
|
Proposal to finalize a Recommendation specifying APS based MPLS-TP linear protection for PTN applications
|
Italy
|
Q9/15, Q14/15, Q10/15
|
2012-08-28 |
|
[ 2314 ]
|
Proposal of Consent of Recommendation on APS based MPLS-TP Linear Protection
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-28 |
|
[ 2271 ]
|
Considerations re ETH-LM and Link Aggregation
|
AimValley BV
,
Alcatel-Lucent USA Inc.
|
Q14/15, Q10/15
|
2012-08-28 |
|
[ 2190 ]
|
Definition of Signal Degrade in packet networks
|
Alcatel-Lucent Italia S.p.A.; China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
Orckit Corrigent
,
Telecom Italia S.p.A.
,
ZTE Corporation
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2188 ]
|
Implementation Procedure of DCN Management for G.7710
|
FiberHome Technologies Group
|
Q14/15
|
2012-08-27 |
|
[ 2187 ]
|
MI Grouping Packages for G.8152
|
FiberHome Technologies Group
|
Q14/15
|
2012-08-27 |
|
[ 2186 ]
|
Mapping of G.8152 Atomic Functions and UML Model Artifacts
|
FiberHome Technologies Group
|
Q14/15
|
2012-08-27 |
|
[ 2185 ]
|
OTN Linear Protection Function Modelling for G.874.1
|
FiberHome Technologies Group
|
Q14/15
|
2012-08-27 |
|
[ 2184 ]
|
G.874.1 UML Model
|
Ericsson, Inc.
|
Q14/15
|
2012-08-27 |
|
[ 2152 ]
|
Proposed terminologies for ETH PM
|
Fujitsu Limited
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2146 ]
(Rev.1) |
Proposal to modify relationships between classes in class diagram for OTN Entities
|
ZTE Corporation
|
Q14/15
|
2012-08-27 |
|
[ 2144 ]
|
Proposed text for the guidance to performance measurement by ETH OAM
|
Fujitsu Limited
,
NEC Corporation
|
Q9/15, Q14/15, Q10/15
|
2012-08-27 |
|
[ 2142 ]
(Rev.1) |
Proposal to extend the index n of OPSn in the text of next revision of G.874.1
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2141 ]
(Rev.1) |
Proposal to add some mapping between G.798 OTN atomic functions and UML model artifacts in the table 7-1of next revision of G.874.1
|
ZTE Corporation
|
Q14/15
|
2012-08-27 |
|
[ 2140 ]
(Rev.1) |
Comments to new draft G.8152 MPLS-TP model
|
ZTE Corporation
|
Q14/15
|
2012-08-27 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2029 ]
|
Update to the AIS Insert process in G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2028 ]
|
Proposed Text for adding Lock Instruct functions to G.8121.2
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2027 ]
|
Proposed Text for adding Lock Instruct functions to G.8121
|
Cisco Systems, Inc.
|
Q9/15, Q14/15
|
2012-08-24 |
|
[ 2023 ]
|
Terminology for Performance Monitoring in G.8013/Y.1731
|
Cisco Systems, Inc.
|
Q9/15, Q14/15, Q10/15
|
2012-08-24 |
|
[ 1992 ]
(Rev.1) |
Inverse multiplexing for ODUS
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1991 ]
(Rev.1) |
Architecture Consideration for the extension of OTN Beyond 100G
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1965 ]
|
Request for Response to OIF Liaison Statement (oif2012.265.02) a
|
Alcatel-Lucent USA Inc.
,
Xtera Communications, Inc.
|
Q9/15, Q14/15
|
2012-08-22 |
|
[ 1937 ]
|
Mapping of G.798 atomic functions to G.874.1 object classes
|
Deutsche Telekom AG
|
Q14/15
|
2011-11-23 |
|
[ 1912 ]
|
Maintaining the common OTN functional model in draft revised G.872
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1901 ]
(Rev.1) |
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1897 ]
(Rev.1) |
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1853 ]
(Rev.1) |
Alignment on dUNP between Y.1731 and G.8021
|
Alcatel-Lucent Italia S.p.A.
|
Q9/15, Q14/15, Q10/15
|
2011-11-22 |
|
[ 1847 ]
|
China Propose to make progress on MPLS-TP OAM Standardization
|
China
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1844 ]
|
Requirements for L0/L1/L2 Multi-layer Convergence Network
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1843 ]
|
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1838 ]
|
G.8021 and G.8051 updates to support MI specified in G.8031v3 as corrected and G.8032v3
|
Alcatel-Lucent Bell N.V.
|
Q9/15, Q14/15
|
2011-11-22 |
|
[ 1837 ]
|
Withdrawn - Duplicate of C-1838
Forthcoming
|
Alcatel-Lucent Bell N.V.
|
Q9/15, Q14/15
|
2011-11-22 |
|
[ 1822 ]
(Rev.1) |
Considerations about PTN and PSN applications for MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1821 ]
(Rev.2) |
Considerations about collaboration between ITU-T and IETF on MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1818 ]
(Rev.1) |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1763 ]
(Rev.1) |
Consideration on the use of a new Ethertype for MPLS-TP
|
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1756 ]
(Rev.1) |
MPLS-TP OAM Recommendations - Proposed way forward
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1754 ]
(Rev.1) |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1753 ]
(Rev.1) |
Draft of multi layer converged network informative document
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1744 ]
(Rev.1) |
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON
|
ZTE Corporation
|
Q14/15, Q12/15
|
2011-11-22 |
|
[ 1694 ]
|
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
Withdrawn
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1688 ]
(Rev.1) |
Proposal for joint discussion about flexible grid network
|
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-21 |
|
[ 1610 ]
(Rev.1) |
Management of G.872 v2 (aon)
|
Ciena Corporation
|
Q14/15, Q12/15
|
2011-11-19 |
|
[ 1576 ]
(Rev.1) |
ODUflex related extensions to information model in G.874.1
|
Infinera Corporation
|
Q14/15
|
2011-11-18 |
Results:143 total items. Result page:
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):