Contributions
[ AI/Question: Q12/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2388 ]
|
Proposal of study items for multi-layer/multi-technology converged transport networks
|
NTT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2387 ]
|
Proposal of clarification of requirements for MPLS-TP p2mp transport path
|
NTT
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2368 ]
|
Low-complexity DWDM system with self-seeded optical transceivers
|
Futurewei Technologies US R&D Center
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2364 ]
|
Comments on draft revised Recommendation G.872
|
Deutsche Telekom AG
|
Q12/15
|
2012-08-28 |
|
[ 2351 ]
|
Scope of Q2, as applies to access vs. OTN
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2322 ]
(Rev.1) |
Terminology for Sub-Lambda Photonically Switched Network (SLPSN)
|
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Q3/15, Q12/15
|
2012-08-28 |
|
[ 2314 ]
|
Proposal of Consent of Recommendation on APS based MPLS-TP Linear Protection
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-28 |
|
[ 2281 ]
|
The considerations about beyond 100G OTN requirements
|
China Telecommunications Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2270 ]
(Rev.1) |
ITU-T study item discussion on transport network with backhaul traffic optimization
|
China Unicom
|
Q12/15
|
2012-08-28 |
|
[ 2263 ]
|
Propose a new equipment model of converged access and transport node
|
ZTE Corporation
|
Q9/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2262 ]
(Rev.1) |
Proposal to study a converged access and transport network
|
ZTE Corporation
|
Q2/15, Q12/15
|
2012-08-28 |
|
[ 2234 ]
|
Clarification on Ethernet transport network architecture in G.8010
|
Hitachi, Ltd.
|
Q12/15
|
2012-08-28 |
|
[ 2215 ]
|
OTN Architecture Extensions
|
Infinera Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2157 ]
(Rev.1) |
Considerations on next steps beyond 100 Gbit/s applications
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q6/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2142 ]
(Rev.1) |
Proposal to extend the index n of OPSn in the text of next revision of G.874.1
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 1992 ]
(Rev.1) |
Inverse multiplexing for ODUS
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1991 ]
(Rev.1) |
Architecture Consideration for the extension of OTN Beyond 100G
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1980 ]
|
Proposed Liaison on Control Plane and Data Plane
|
Ciena Canada
|
Q12/15
|
2012-08-22 |
|
[ 1961 ]
|
Traffic Differentiation in Transport Networks
|
Ericsson UK
|
Q9/15, Q12/15
|
2012-08-16 |
|
[ 1912 ]
|
Maintaining the common OTN functional model in draft revised G.872
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1902 ]
(Rev.1) |
Draft "multi-layer converged transport networks" and some discussion points
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q12/15
|
2011-11-22 |
|
[ 1901 ]
(Rev.1) |
Proposal of reconsideration for future planning of standardization for MPLS-TP related Recommendations
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1897 ]
(Rev.1) |
Consideration of approval of both MPLS-TP OAM Recommendations(G.8113.1 based on Ethernet and G.8113.2 based on MPLS)
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1882 ]
|
Model for Ethernet Remote Customer Service Interfaces
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1881 ]
|
Transport Entity Role Examples
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1871 ]
|
Comments on draft revised G.872
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1869 ]
(Rev.1) |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
|
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
|
Q6/15, Q2/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1867 ]
(Rev.1) |
Ciena's views on Progressing work on Recs. G.8113.1 and G.8113.2
|
Ciena Corporation
|
Q12/15
|
2011-11-22 |
|
[ 1858 ]
|
Black Link related amendments to G.872
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1857 ]
|
Architectural models of OTN transport services
|
Deutsche Telekom AG
|
Q12/15
|
2011-11-22 |
|
[ 1847 ]
|
China Propose to make progress on MPLS-TP OAM Standardization
|
China
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1844 ]
|
Requirements for L0/L1/L2 Multi-layer Convergence Network
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1843 ]
|
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1822 ]
(Rev.1) |
Considerations about PTN and PSN applications for MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1821 ]
(Rev.2) |
Considerations about collaboration between ITU-T and IETF on MPLS-TP
|
Italy
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1818 ]
(Rev.1) |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1776 ]
|
Multi layer optimization alternatives associated with Ethernet Service support
|
Huawei Technologies Co. Ltd.
|
Q12/15
|
2011-11-22 |
|
[ 1763 ]
(Rev.1) |
Consideration on the use of a new Ethertype for MPLS-TP
|
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1756 ]
(Rev.1) |
MPLS-TP OAM Recommendations - Proposed way forward
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2011-11-22 |
|
[ 1754 ]
(Rev.1) |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1753 ]
(Rev.1) |
Draft of multi layer converged network informative document
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1744 ]
(Rev.1) |
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON
|
ZTE Corporation
|
Q14/15, Q12/15
|
2011-11-22 |
|
[ 1719 ]
|
Maintaining the functional model of the OTN in G.872
|
Germany
|
Q12/15
|
2011-11-21 |
|
[ 1717 ]
(Rev.1) |
Progressing MPLS-TP OAM, Equipment, and Management Recommendations
|
Alcatel-Lucent USA Inc.
|
Q9/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1694 ]
|
Withdrawn, duplicate of C-1843 - G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
Withdrawn
|
China
,
China Mobile Communications Corporation
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-11-21 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1688 ]
(Rev.1) |
Proposal for joint discussion about flexible grid network
|
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-21 |
|
[ 1623 ]
|
Elaboration on G.8110.1 AAP Comment Regarding Uniform Model Text
|
Cisco Systems, Inc.
,
Ericsson, Inc.
,
Extreme Networks
|
Q9/15, Q12/15
|
2011-11-20 |
Results:170 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):