Contributions
[ AI/Question: Q11/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2333 ]
(Rev.1) |
Frequency slot assignment of multicarrier OCh
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2332 ]
(Rev.1) |
Requirements on OTN interfaces beyond 100 Gbit/s
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2331 ]
(Rev.1) |
Proposal for future OTN interfaces
|
Deutsche Telekom AG
|
Q11/15
|
2012-08-28 |
|
[ 2327 ]
|
A proposal to modification of G.709 to add OTU0 frame
|
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2281 ]
|
The considerations about beyond 100G OTN requirements
|
China Telecommunications Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2254 ]
|
Consideration for ODU SMP supporting ODUflex signal resizing
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q9/15, Q11/15
|
2012-08-28 |
|
[ 2249 ]
|
A proposal of other alternative OTUkV frame structures for low latency transport
|
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2217 ]
|
Proposal for FEC overhead of OTU5
|
ZTE Corporation; China
|
Q6/15, Q11/15
|
2012-08-28 |
|
[ 2216 ]
|
Proposal to add OTU0 frame in G.709/Y.1331
|
Altera Corporation
,
Electronics and Telecommunications Research Institute (ETRI)
,
LG-Ericsson
,
SK Telecom
|
Q11/15
|
2012-08-28 |
|
[ 2215 ]
|
OTN Architecture Extensions
|
Infinera Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2180 ]
|
Multilayer protocol stack of OTN interface
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2012-08-27 |
|
[ 2179 ]
(Rev.1) |
Consideration on multiplex structure, timeslot granularity and client mapping in next ODU/OTU signals
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2012-08-27 |
|
[ 2178 ]
|
Considerations on flexible OTU frame structures
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2012-08-27 |
|
[ 2157 ]
(Rev.1) |
Considerations on next steps beyond 100 Gbit/s applications
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q6/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2142 ]
(Rev.1) |
Proposal to extend the index n of OPSn in the text of next revision of G.874.1
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2087 ]
|
Comments on the proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
PMC-Sierra, Inc.
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-25 |
|
[ 2086 ]
|
Proposed clarification for the CSF start time in G.7041
|
PMC-Sierra, Inc.
|
Q11/15
|
2012-08-25 |
|
[ 2085 ]
|
Proposal to allow a modified GFP frame alignment algorithm for high-speed interfaces
|
PMC-Sierra, Inc.
|
Q11/15
|
2012-08-25 |
|
[ 2062 ]
|
Mapping of 16G Fibre-Channel into OTN
|
Alcatel-Lucent USA Inc.
|
Q11/15
|
2012-08-24 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2045 ]
|
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes
|
AT&T, Inc.
,
Ciena Corporation
|
Q9/15, Q14/15, Q13/15, Q11/15
|
2012-08-24 |
|
[ 2035 ]
|
Alignment of APS specifications in G.873.1, G.798, and G.709
|
Tellabs Oy
|
Q9/15, Q11/15
|
2012-08-24 |
|
[ 2000 ]
|
Proposal to add a reference to HAO overhead in G.709
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2012-08-23 |
|
[ 1998 ]
|
Updating APS/PCC specifications in clause 15.8.2.4 of G.709, Table 7-1/G.873.1 and server to ODU (ODUkP to ODUj and OTUk[V] to ODUk) adaptation functions in G.798
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q11/15
|
2012-08-23 |
|
[ 1992 ]
(Rev.1) |
Inverse multiplexing for ODUS
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1991 ]
(Rev.1) |
Architecture Consideration for the extension of OTN Beyond 100G
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1990 ]
|
OTUk-AIS Clarifications
|
Altera Newfoundland Technology Centre (Altera NTC)
|
Q9/15, Q11/15
|
2012-08-22 |
|
[ 1970 ]
(Rev.1) |
Backward compatible precise delay measurement method for OTN
|
Alcatel-Lucent Deutschland AG
|
Q9/15, Q11/15
|
2012-08-22 |
|
[ 1963 ]
|
Consideration on OTL interface for OTU5
|
Fujitsu Limited
|
Q11/15
|
2012-08-17 |
|
[ 1962 ]
|
Flexible high speed interfaces
|
Ericsson UK
|
Q11/15
|
2012-08-16 |
|
[ 1912 ]
|
Maintaining the common OTN functional model in draft revised G.872
|
Huawei Technologies Co. Ltd.
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1869 ]
(Rev.1) |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
|
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
|
Q6/15, Q2/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1856 ]
|
Strong FEC for 40 Gbit/s Black Link applications
|
Deutsche Telekom AG
|
Q11/15
|
2011-11-22 |
|
[ 1855 ]
|
Rational for new low bit rate interfaces for the OTN
|
Deutsche Telekom AG
|
Q6/15, Q11/15
|
2011-11-22 |
|
[ 1818 ]
(Rev.1) |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
|
Huawei Technologies Co. Ltd.
|
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-22 |
|
[ 1810 ]
(Rev.1) |
Comments on the draft G.7044
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q11/15
|
2011-11-22 |
|
[ 1807 ]
(Rev.1) |
A proposal of the modification for the draft G.7044
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q11/15
|
2011-11-22 |
|
[ 1805 ]
(Rev.1) |
Introduction of the super timeslots for ODU5
|
Huawei Technologies Co. Ltd.
|
Q11/15
|
2011-11-22 |
|
[ 1780 ]
(Rev.1) |
Consideration on PTP over OTN solution options
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-22 |
|
[ 1757 ]
(Rev.1) |
Consideration on the adaptation of OTU5 over multichannel parallel interfaces
|
China Unicom
,
ZTE Corporation
|
Q11/15
|
2011-11-22 |
|
[ 1754 ]
(Rev.1) |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1753 ]
(Rev.1) |
Draft of multi layer converged network informative document
|
ZTE Corporation
|
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
|
2011-11-22 |
|
[ 1727 ]
|
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1705 ]
|
Enhanced delay measurement for OTN
|
Korea (Rep. of)
|
Q11/15
|
2011-11-21 |
|
[ 1701 ]
|
Synchronization Requirement in OTN
|
China Mobile Communications Corporation
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1688 ]
(Rev.1) |
Proposal for joint discussion about flexible grid network
|
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2011-11-21 |
|
[ 1679 ]
(Rev.1) |
Considerations for an OTU5/ODU5 definition
|
ITEK
|
Q11/15
|
2011-11-21 |
|
[ 1675 ]
(Rev.1) |
Consideration on client signal mapping for ODU5/OTU5
|
Fujitsu Limited
|
Q11/15
|
2011-11-21 |
Results:200 total items. Result page:
1 -
2 -
3 -
4
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):