Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 615 ]
|
Transport of SSM over GPON
|
BT
|
Q13/15
|
2009-09-20 |
|
[ 614 ]
|
Correction to Test Case ITU-T G.8261 Test Case 17
|
BT
|
Q13/15
|
2009-09-20 |
|
[ 613 ]
|
G.680: modelling amplitude and phase in single and cascaded ONEs
|
Ericsson
|
Q6/15
|
2009-09-20 |
|
[ 612 ]
|
GEN: VDSL: ADSL: 09XC-065 - New Generalised Transmitter Referred Virtual noise
|
BT plc
|
Q4/15
|
2009-09-19 |
|
[ 611 ]
|
G.hs: G.vdsl: Handshake tones for HPE band plans.
|
BT plc
|
Q4/15
|
2009-09-19 |
|
[ 610 ]
|
Aspects of INP management
|
BT plc
|
Q4/15
|
2009-09-19 |
|
[ 609 ]
|
ADSL: VDSL: Proposal for development of 'black box' recorder functionality for VDSL2 and ADSL2/ADSL2plus transceivers.
|
BT plc
|
Q4/15
|
2009-09-19 |
|
[ 608 ]
|
G.gen: VDSL2: ADSL: Mitigating multiple noise sources with one VN profile
|
BT plc
|
Q4/15
|
2009-09-19 |
|
[ 607 ]
|
GEN: VDSL: ADSL: 09XC-065 - New receiver referred virtual noise
|
BT plc
|
Q4/15
|
2009-09-19 |
|
[ 606 ]
|
Problems with the VN agreements of Xian
|
BT
|
Q4/15
|
2009-09-18 |
|
[ 605 ]
|
VDSL2: Improvements to KL0 estimation
|
BT
|
Q4/15
|
2009-09-18 |
|
[ 604 ]
|
Comment on Traffic Models in G.8261
|
Ericsson
|
Q13/15
|
2009-09-18 |
|
[ 603 ]
|
G.hn: CISPR Compliant Annex - Alignment of key parameters to ensure compliance with EMC requirements and CISPR update.
|
BT
|
Q4/15
|
2009-09-18 |
|
[ 602 ]
|
G.vdsl: Reverse Powering for VDSL2
|
BT
|
Q4/15
|
2009-09-18 |
|
[ 601 ]
|
Time distribution model using 1588v2 for performance indication
|
CMCC
,
ZTE Corporation
|
Q13/15
|
2009-09-18 |
|
[ 600 ]
|
Proposal on time interface specification
|
CMCC
,
ZTE Corporation
|
Q13/15
|
2009-09-18 |
|
[ 599 ]
|
Test and analysis of time synchronization using 1588v2 for transport network
|
CMCC
,
ZTE Corporation
|
Q13/15
|
2009-09-18 |
|
[ 598 ]
|
Document withdrawn
|
N/A
|
Q5/15
|
2009-09-18 |
|
[ 597 ]
|
G.hn: CBTXOP with same attributes
|
SPiDCOM Technologies
|
Q4/15
|
2009-09-18 |
|
[ 596 ]
|
FDB flush scheme for G.8032 Ethernet ring protection
|
ETRI
|
Q9/15
|
2009-09-18 |
|
[ 595 ]
|
Proposed update of OTNT work plan
|
NTT
|
Q3/15
|
2009-09-18 |
|
[ 594 ]
|
Proposal of modification of MPLS-TP OAM requirements
|
NTT
|
Q10/15
|
2009-09-18 |
|
[ 593 ]
|
Proposal of additional MPLS-TP OAM requirements
|
NTT
|
Q10/15
|
2009-09-18 |
|
[ 592 ]
|
Proposal of definition of maintenance points (MEP and MIP)
|
NTT
|
Q12/15, Q10/15
|
2009-09-18 |
|
[ 591 ]
|
G.VDSL: VDSL2 resynchronisation stability needs to be improved
|
TNO
,
Swisscom
|
Q4/15
|
2009-09-18 |
|
[ 590 ]
|
Relativity Issue of Spectral Excursion & Maximum Ripple
|
ZTE Corporation
|
Q6/15
|
2009-09-18 |
|
[ 589 ]
|
Proposal of Additional PT
|
ZTE Corporation
|
Q11/15
|
2009-09-18 |
|
[ 588 ]
|
Proposal for avoiding re-flushing (G.8032)
|
ZTE Corporation
|
Q9/15
|
2009-09-18 |
|
[ 587 ]
|
Further consideration about subnetwork blocking resource management in G.8080
|
ZTE Corporation
|
Q12/15
|
2009-09-18 |
|
[ 586 ]
|
Consideration on ODUflex resizing
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2009-09-18 |
|
[ 585 ]
|
Consideration on fast OPUk Client Signal Fail (CSF)
|
ZTE Corporation
,
CMCC
,
NSN
|
Q11/15
|
2009-09-18 |
|
[ 584 ]
|
Solution to backward compatibility logic problem in G.8032v2 (G.8032)
|
ZTE Corporation
|
Q9/15
|
2009-09-18 |
|
[ 583 ]
|
Proposals to consider resource sharing in G.8080
|
ZTE Corporation
|
Q12/15
|
2009-09-18 |
|
[ 582 ]
|
Proposal for ring protection information discovering in ASTN
|
ZTE Corporation
|
Q14/15
|
2009-09-18 |
|
[ 581 ]
|
Proposal for adding some contents in appendix of G.696.1
|
ZTE Corporation
|
Q6/15
|
2009-09-18 |
|
[ 580 ]
|
Considerations on use of P2P TC in 1588v2 telecom profile for phase/time sync
|
ZTE Corporation
,
Nokia Siemens Networks
|
Q13/15
|
2009-09-18 |
|
[ 579 ]
|
Consideration on maximum spectral excursion for 10G_50GHz in G.698.2
|
ZTE Corporation
|
Q6/15
|
2009-09-18 |
|
[ 578 ]
|
Comments on blocking the both ends of RPL (G.8032)
|
ZTE Corporation
|
Q9/15
|
2009-09-18 |
|
[ 577 ]
|
OTUk (k=3, 4) multi-channel parallel transport considering FEC
|
NTT
|
Q11/15
|
2009-09-18 |
|
[ 576 ]
|
Proposal for behaviour of RPL owner receiving an NR message with higher NODE_ID in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 575 ]
|
A set of methods for flushing FDB in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 574 ]
|
Support of protection mechanism in case of multi-ring network with double failures in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 573 ]
|
Clarification of state machine in case of Clear to remote MS/FS node in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 572 ]
|
ODUflex hitless resizing method
|
Huawei Technologies
,
China Mobile Communications Corp
|
Q9/15, Q11/15
|
2009-09-18 |
|
[ 571 ]
|
Proposal for enhancements to Interconnection Flush logic in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 570 ]
|
Guidelines for configuration of VIDs and Ring-IDs of R-APS channels in G.8032v2
|
NTT
|
Q9/15
|
2009-09-18 |
|
[ 569 ]
|
Proposal of re-using equipment protection profile for supporting N:1 protection in G.984.4
|
Huawei Technologies
|
Q2/15
|
2009-09-18 |
|
[ 568 ]
|
Proposal for supporting related BM-CM RE and WC-enabled RE configuration in G.984.4
|
Huawei Technologies
|
Q2/15
|
2009-09-18 |
|
[ 567 ]
|
Proposed modification for draft G.9960 Amendment 1
|
Japan
|
Q4/15
|
2009-09-18 |
|
[ 566 ]
|
Considerations on the coexistence of Forced Switch and Signal Fail in G.8032 v2
|
ETRI
|
Q9/15
|
2009-09-18 |
Results:2390 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):