International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1290 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1289 ]  
 
Draft of new ITU-T Recommendation "Disaster managements for outside plant facilities" L.dmosp     Korea   Q17/15   2011-02-01
[ 1288 ]  
 
Extension of Rec. G.694.1 by a new clause to address flexible frequency grids     Nokia Siemens Networks GmbH & Co. KG, Germany   Q6/15   2011-01-31
[ 1287 ]  
 
G.987.3: Draft Text for Transparent Clock Mechanism     Adtran , Calix , PMC-Sierra   Q2/15, Q13/15   2011-01-31
[ 1286 ]  
 
G.987.1: Draft Text for IEEE 1588 Packet Timing Reference Model     Adtran , Calix , PMC-Sierra   Q2/15, Q13/15   2011-01-31
[ 1285 ]  
 
Associated Channel Type for G.tpoam     WIND   Q12/15   2011-01-31
[ 1284 ]  
 
Proposal of subjects to be discussed regarding flexible grids     NTT   Q6/15   2011-01-31
[ 1283 ]  
 
G.657 Bend insensitive fibre splice compatibility     Draka Communications   Q5/15   2011-01-31
[ 1282 ]  
 
Multi Path Interference (MPI), background and experimental results     Draka Communications   Q5/15   2011-01-31
[ 1281 ]  
 
Proposed texts for G.smp     ZTE   Q9/15   2011-01-31
[ 1280 ]  
 
Automatic Protection Switching (APS) protocol for Shared Mesh Protection     ZTE   Q9/15   2011-01-31
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1278 ]  
 
G.vdsl: Support for text proposal for Attainable Net Data rate     Swisscom   Q4/15   2011-01-31
[ 1277 ]  
 
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO     ZTE   Q11/15   2011-01-31
[ 1276 ]  
 
G.vdsl: Support for text proposal for Short Interruption Monitoring     Swisscom   Q4/15   2011-01-31
[ 1275 ]  
 
Main characteristics of a Reconfigurable Multi-degree Optical Node     Telecom Italia   Q7/15   2011-01-31
[ 1274 ]  
 
G.vdsl: Support for Alternative Electrical Length Estimation Method     Swisscom   Q4/15   2011-01-31
[ 1273 ]  
 
Issues with TCM section monitoring and CA     Alcatel-Lucent Germany   Q9/15   2011-01-31
[ 1272 ]  
 
Relevant Clauses for J.211     Semtech   Q13/15   2011-01-31
[ 1271 ]  
 
Correction of mistakes in ODU connection function processes in G.798     Alcatel-Lucent Germany   Q9/15   2011-01-31
[ 1270 ]  
 
Proposal for OMCI in EPON     Mitsubishi , Ericsson , Hitachi , NTT   Q2/15   2011-01-31
[ 1269 ]  
 
Proposed text for inclusion in Y.1731 for Frame Loss Measurement     Huawei   Q9/15, Q10/15   2011-01-31
[ 1268 ]  
 
Jitter evaluation methods for burst signal at XG-PON interfaces     CIAJ   Q15/15   2011-01-31
[ 1267 ]  
 
G.8272 PRTC type approval process proposal     Deutsche Telekom   Q13/15   2011-01-31
[ 1266 ]  
 
G.8272 PRTC Options: Temperature     Deutsche Telekom   Q13/15   2011-01-31
[ 1265 ]  
 
LTE-Advanced Coordinated Multi-point (CoMP) Time/phase accuracy requirements for ITU-T Q13/15 (G.827x)     Deutsche Telekom   Q13/15   2011-01-31
[ 1264 ]  
 
Need for EEC chain hold-over management     Deutsche Telekom   Q13/15   2011-01-31
[ 1263 ]  
 
Proposed eID Tag and Its Applications in the Network     Huawei   Q17/15   2011-01-31
[ 1262 ]  
 
Proposal for work on NG-PON protection     Huawei , MIIT China   Q2/15   2011-01-31
[ 1261 ]  
 
MPI test method in the G.650.1 Appendix     Prysmian   Q5/15   2011-01-31
[ 1260 ]  
 
Consideration on OTU5 (400G)     Huawei   Q11/15   2011-01-31
[ 1259 ]  
 
Proposal for the scope of the Recommendation G.8272     IDT   Q13/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1257 ]  
 
Propose a latency measurement model of equipment     ZTE   Q9/15   2011-01-31
[ 1256 ]  
 
Requirement for communication latency as a traffic engineering performance metric in ASON     ZTE   Q14/15, Q12/15   2011-01-31
[ 1255 ]  
 
Some OTN related revision suggestions in G.696.1(MIIT-CATR)     MIIT China   Q6/15   2011-01-31
[ 1254 ]  
(Rev.1) 
Proposal of adding new attribute to PPTP POTS UNI ME     MIIT China   Q2/15   2011-01-31
[ 1253 ]  
 
Proposal of adding new MAC bridge port ICMPv6 process preassign table to G.988     MIIT China   Q2/15   2011-01-31
[ 1252 ]  
 
PMD parameters description method suggestion(MIIT-CATR)     MIIT China   Q6/15   2011-01-31
[ 1251 ]  
 
G.gen: New Recommendations for Next-Generation DSL Technologies     MIIT China , China Unicom   Q4/15   2011-01-31
[ 1250 ]  
 
MII China comments on future revision of Rec. G.657     MII China   Q5/15   2011-01-31
[ 1249 ]  
 
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile     CATR , China Mobile   Q10/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1246 ]  
 
A proposal to fault scenario analysis of draft G.hao     ETRI   Q11/15   2011-01-31
[ 1245 ]  
 
A proposal to session timer for draft G.hao     ETRI   Q11/15   2011-01-31
[ 1244 ]  
 
Support for the consent of G.8110.1     NEC , Fujitsu , Hitachi   Q12/15   2011-01-31
[ 1243 ]  
 
Comments on the extension of proactive loss measurement in Y.1731/G.8021     NEC , Hitatchi   Q9/15, Q10/15   2011-01-31
[ 1242 ]  
 
G.gen, G.vdsl: An Introduction to Advances in Multi-Wire Transmission Technologies     Huawei   Q4/15   2011-01-31
[ 1241 ]  
 
G.vdsl: Updated Working Text for Distribution of Time-of-Day over VDSL2 Links     Huawei , China MIIT   Q4/15   2011-01-31
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29