Contributions
[ AI/Question: 2/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 2388 ]
|
Proposal of study items for multi-layer/multi-technology converged transport networks
|
NTT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2387 ]
|
Proposal of clarification of requirements for MPLS-TP p2mp transport path
|
NTT
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-29 |
|
[ 2373 ]
|
Proposal for G.epon specific managed entities
|
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2012-08-28 |
|
[ 2372 ]
|
Proposal for G.epon related managed entities
|
Mitsubishi Electric Corporation
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2012-08-28 |
|
[ 2368 ]
|
Low-complexity DWDM system with self-seeded optical transceivers
|
Futurewei Technologies US R&D Center
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2367 ]
|
Proposal of inter-OLT communication in G.multi
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2012-08-28 |
|
[ 2365 ]
|
Discussion on G.poc upstream transmission
|
Futurewei Technologies US R&D Center
|
Q4A/15, Q2/15, Q1/15
|
2012-08-28 |
|
[ 2364 ]
|
Comments on draft revised Recommendation G.872
|
Deutsche Telekom AG
|
Q12/15
|
2012-08-28 |
|
[ 2363 ]
|
2.5G upstream GPON discussion
|
Futurewei Technologies US R&D Center
|
Q2/15
|
2012-08-28 |
|
[ 2351 ]
|
Scope of Q2, as applies to access vs. OTN
|
British Telecommunications Public Ltd. Co. (BT Plc)
,
China Telecommunications Corporation
,
Futurewei Technologies US R&D Center
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q6/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2334 ]
(Rev.1) |
Proposal for inclusion of PtP WDM use cases in G.ngpon2.1
|
ADVA Optical Networking
,
Ericsson, Inc.
,
France Télécom Orange
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2322 ]
(Rev.1) |
Terminology for Sub-Lambda Photonically Switched Network (SLPSN)
|
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Q3/15, Q12/15
|
2012-08-28 |
|
[ 2314 ]
|
Proposal of Consent of Recommendation on APS based MPLS-TP Linear Protection
|
Japan
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
|
2012-08-28 |
|
[ 2308 ]
|
Proposal for inclusion of Performance Measurement Methods of Advanced Modulation Formats in G.ngpon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2305 ]
|
Proposal for inclusion of Advanced Modulation Formats in G.ngpon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2300 ]
|
Proposal to add fixed wavelength assignment in physical layer in G.multi
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q2/15
|
2012-08-28 |
|
[ 2298 ]
(Rev.1) |
Proposal to add some parameter definitions for G.ng-pon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
|
Q2/15
|
2012-08-28 |
|
[ 2296 ]
|
Proposal to add O-OFDM as another line code option in the Annex A of the G.ngpon2.2
|
Electronics and Telecommunications Research Institute (ETRI)
,
Nokia Siemens Networks GmbH & Co. KG
|
Q2/15
|
2012-08-28 |
|
[ 2281 ]
|
The considerations about beyond 100G OTN requirements
|
China Telecommunications Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2270 ]
(Rev.1) |
ITU-T study item discussion on transport network with backhaul traffic optimization
|
China Unicom
|
Q12/15
|
2012-08-28 |
|
[ 2263 ]
|
Propose a new equipment model of converged access and transport node
|
ZTE Corporation
|
Q9/15, Q2/15, Q12/15
|
2012-08-28 |
|
[ 2262 ]
(Rev.1) |
Proposal to study a converged access and transport network
|
ZTE Corporation
|
Q2/15, Q12/15
|
2012-08-28 |
|
[ 2248 ]
|
Proposal for G.multi architecture
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-28 |
|
[ 2247 ]
(Rev.1) |
Clarification to various types of MW-PON systems in G.multi Scope
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-28 |
|
[ 2246 ]
+Corr.1 |
Serial data acquisition by XGPON
|
FiberHome Technologies Group
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2234 ]
|
Clarification on Ethernet transport network architecture in G.8010
|
Hitachi, Ltd.
|
Q12/15
|
2012-08-28 |
|
[ 2227 ]
|
General discussion on wavelength tuning for G.multi
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2226 ]
|
General discussion on registration for G.multi
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2223 ]
|
Proposal for NG-PON2 TC layer standardization
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2221 ]
|
TC layer framing in TWDM PON
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2218 ]
|
Unified Power Management for PON systems
|
ZTE Corporation
|
Q2/15
|
2012-08-28 |
|
[ 2215 ]
|
OTN Architecture Extensions
|
Infinera Corporation
|
Q6/15, Q12/15, Q11/15
|
2012-08-28 |
|
[ 2176 ]
|
Living List of G.epon
Withdrawn: Reposted as TD817/WP1
|
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-27 |
|
[ 2173 ]
|
Draft document of G.epon
Withdrawn: Reposted as TD817/WP1
|
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
|
Q2/15
|
2012-08-27 |
|
[ 2157 ]
(Rev.1) |
Considerations on next steps beyond 100 Gbit/s applications
|
China Unicom
,
Huawei Technologies Co. Ltd.
|
Q6/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2142 ]
(Rev.1) |
Proposal to extend the index n of OPSn in the text of next revision of G.874.1
|
ZTE Corporation
|
Q14/15, Q12/15, Q11/15
|
2012-08-27 |
|
[ 2130 ]
|
Proposal for ONU registration and wavelength tuning functions required in MW-PONs with wavelength-splitter-based ODN
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-27 |
|
[ 2120 ]
|
Transport of wavelength information via new PLOAM message for enabling ONU transfer in MW-PON system
|
Alcatel-Lucent Shanghai Bell
|
Q2/15
|
2012-08-27 |
|
[ 2118 ]
(Rev.1) |
Strong Authentication and Key Management for XG-PON1
|
Alcatel-Lucent Shanghai Bell
,
China Mobile Communications Corporation
,
China Unicom
,
China
|
Q2/15
|
2012-08-27 |
|
[ 2111 ]
+Corr.1 |
Proposal to G.multi: wavelength management channel choice and announcement in Stacked-PON
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2110 ]
+Corr.1 |
Proposal to G.multi: the framework of transmission convergence layer function in CO
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2109 ]
+Corr.1 |
Proposal on supporting OTDR function for G.984.5
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2108 ]
+Corr.1 |
Proposal on an asymmetric wavelength number physical architechture for G.ngpon2.2
|
FiberHome Technologies Group
|
Q2/15
|
2012-08-27 |
|
[ 2058 ]
|
Misalignment among G.709, G.798 and G.872
|
Ciena Corporation
|
Q9/15, Q12/15, Q11/15
|
2012-08-24 |
|
[ 2013 ]
(Rev.1) |
OLT cooperation in PON
|
Nippon Telegraph and Telephone Corporation (NTT)
|
Q2/15
|
2012-08-24 |
|
[ 2012 ]
|
Not used
Duplicate of C-2263
|
N/A
|
Q2/15
|
2012-08-24 |
|
[ 2011 ]
|
No used
Duplicate of C-2262
|
N/A
|
Q2/15
|
2012-08-24 |
|
[ 1992 ]
(Rev.1) |
Inverse multiplexing for ODUS
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1991 ]
(Rev.1) |
Architecture Consideration for the extension of OTN Beyond 100G
|
China Telecommunications Corporation
,
ZTE Corporation
|
Q9/15, Q6/15, Q14/15, Q12/15, Q11/15
|
2012-08-23 |
|
[ 1980 ]
|
Proposed Liaison on Control Plane and Data Plane
|
Ciena Canada
|
Q12/15
|
2012-08-22 |
Results:52 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):