Contributions
[ Source: France ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1925 ]
|
G.8271 1pps interface performance specification
|
Deutsche Telekom AG
,
France Télécom Orange
|
Q13/15
|
2011-11-23 |
|
[ 1924 ]
|
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL
|
Tellabs Oy
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1895 ]
|
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1894 ]
|
G.8271: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1893 ]
|
G.8263: Section 9 - PEC-S-F holdover
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1892 ]
|
G.8263: Section 6 - PEC-S-F slave clock noise generation
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1891 ]
|
G.8263: New Appendix discussing time constant values
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1890 ]
|
G.8261.1: Notes on network equipments producing excessive PDV
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1889 ]
|
G.8261.1: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1888 ]
|
G.8260: Request for clarification about the MAFE corner point
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1887 ]
|
G.8260: Comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1886 ]
|
Transport of CPRI interface over OTN
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1885 ]
|
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1884 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
Calnex Solutions Limited
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1806 ]
(Rev.1) |
G.fast: Requirements for a FTU-O transceiver operating in VDSL2 mode
|
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-22 |
|
[ 1804 ]
|
Avoiding an unsatisfactory outcome of the MPLS-TP OAM standardisation
|
France
|
QALL/15
|
2011-11-22 |
|
[ 1730 ]
|
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1729 ]
|
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1725 ]
|
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1724 ]
(Rev.1) |
Comments on TD 527
|
Cisco Systems, Inc.
,
France Télécom Orange
,
Juniper Networks
,
Nokia Siemens Networks GmbH & Co. KG
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1706 ]
(Rev.1) |
Lack of consensus on G.8113.1
|
Cisco Systems, Inc.
,
France Télécom Orange
,
Nokia Siemens Networks GmbH & Co. KG
,
Verizon Communication Corporation
|
QALL/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1697 ]
(Rev.1) |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-21 |
|
[ 1527 ]
(Rev.1-3) |
Standardization of optical switching (photonic sub-lambda switching)
|
France Télécom Orange
,
Portugal Telecom, SGPS, S.A.
,
Swisscom SA
,
Telecom Italia S.p.A.
,
Telefónica, S.A.
,
Telstra Corporation Ltd.
,
Verizon Communication Corporation
|
Q12/15
|
2011-11-15 |
|
[ 1522 ]
|
Template to describe a proposed new ITU-T Recommendation
|
France
|
QALL/15
|
2011-09-05 |
Results:24 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):