Contributions
[ AI/Question: Q4/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1938 ]
|
G.fast: Multi-layer TCAM
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-24 |
|
[ 1936 ]
|
G.hnem: Proposal for subcarrier spacing of coexistence preamble symbols
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-23 |
|
[ 1935 ]
|
G.vector: Editorial fix in G.993.5 Figure 7-4 and 7-5.
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1934 ]
|
G.gen: G.vdsl: G.vector: VDSL2 Dynamic Virtual Noise
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1933 ]
|
G.ploam: MIB parameters to support the ATTNDR improved calculation method
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1932 ]
|
G.vdsl: ATTNDR improved calculation method: proposed text changes
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1931 ]
|
G.fast: TDMA performance in practical topologies
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1930 ]
|
G.fast: TCAM: regain the capacity lost in the noise margin
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2011-11-23 |
|
[ 1923 ]
(Rev.1) |
G.hnem: Proposal for text fixes in G.9956
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1922 ]
(Rev.1) |
G.hnem: Number of PFH symbols for regions other than Europe and North America
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1921 ]
|
[G.ADSL] Low Power ADSL2 (and ADSL2plus)
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1920 ]
(Rev.1) |
G.hnem: On the maximum number of payload repetitions in G.9955
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1919 ]
(Rev.1) |
G.hnem: Proposal to update the text describing the interleaver
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1918 ]
(Rev.1) |
G.hnem: Text changes to accommodate 1-bit BAT
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1917 ]
(Rev.1) |
G.hnem: Proposal to update the text for Annex E of G.9955
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1913 ]
(Rev.1) |
[G.vdsl] Proposal to develop a VDSL2bis recommendation
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1910 ]
(Rev.1) |
G.VDSL2: Accuracy Requirements for KL0
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1907 ]
(Rev.1) |
G.wnb: proposed updates to the G.wnb Recommendation
|
CopperGate Communications
|
Q4/15
|
2011-11-22 |
|
[ 1899 ]
(Rev.1) |
[G.fast] BT requirements for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1898 ]
(Rev.1) |
G.fast: Mechanism for managing TDD and S-TDMA framing parameters
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1896 ]
(Rev.1) |
G.hn: Update proposal for G.hn management parameters
|
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-22 |
|
[ 1875 ]
|
G.fast: On the Synchronous TDMA framing structure
|
ADTRAN
|
Q4/15
|
2011-11-22 |
|
[ 1874 ]
(Rev.1) |
G.vector: Initialization for Simultaneous Joining Lines
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1873 ]
(Rev.1) |
G.fast: Proposal to create an annex for mobile backhaul application
|
Telefon AB - LM Ericsson
|
Q4/15
|
2011-11-22 |
|
[ 1872 ]
(Rev.1) |
G.fast: TDD Frame Structure and Timing Overhead
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1870 ]
|
Hazard influence in telecommunications by VDSL2 technology
|
Brazil
|
Q4/15
|
2011-11-22 |
|
[ 1868 ]
(Rev.1) |
G.fast: Point-to-Point Distribution is the Right Choice for G.fast
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1866 ]
(Rev.1) |
G.hnem: proposal of transmission parameters for extremely robust mode (ERM)
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1865 ]
(Rev.1) |
[G.fast] Clarification of BT requirement for SELT
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1864 ]
(Rev.1) |
G.fast: Equal-Length FEXT Measurements on PE05 Cable
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1863 ]
(Rev.1) |
G.hnem Proposal to update the PRBS seed values from which the preamble is generated
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1862 ]
(Rev.1) |
G.fast: Target Bit Error Rate of G.fast at Gamma Interface
|
Huawei Technologies Co. Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1860 ]
|
Withdrawn, duplicate of C-1863
Withdrawn
|
Yitran Communications Ltd.
|
Q4/15
|
2011-11-22 |
|
[ 1859 ]
(Rev.1) |
[G.fast] G.fast start-up using G.994.1
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1811 ]
(Rev.1) |
[G.fast] TDD Framing Parameters for G.fast
|
British Telecommunications Public Ltd. Co. (BT Plc)
|
Q4/15
|
2011-11-22 |
|
[ 1806 ]
(Rev.1) |
G.fast: Requirements for a FTU-O transceiver operating in VDSL2 mode
|
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-22 |
|
[ 1777 ]
(Rev.1) |
Suggestion to improve existing CBTS back-off rules
|
ZTE Corporation
|
Q4/15
|
2011-11-22 |
|
[ 1765 ]
(Rev.1) |
G.fast: Reverse powering over twisted pair
|
ZTE Corporation
|
Q4/15
|
2011-11-22 |
|
[ 1697 ]
(Rev.1) |
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits
|
Adaptive Spectrum and Signal Alignment (ASSIA) Inc.
,
AT&T, Inc.
,
France Télécom Orange
,
Telecom Italia S.p.A.
|
Q4/15
|
2011-11-21 |
|
[ 1658 ]
(Rev.1) |
G.inp: Proposed text for intra-DTU interleaver
|
Broadcom Corporation
,
Metanoia Technologies, Inc.
|
Q4/15
|
2011-11-21 |
|
[ 1656 ]
(Rev.1) |
G.fast: Vectoring complexity assessment
|
Broadcom Corporation
|
Q4/15
|
2011-11-21 |
|
[ 1634 ]
(Rev.1) |
G.fast: Review of G.fast Simulation Data Relative to Shared Access
|
Ikanos Communications
|
Q4/15
|
2011-11-21 |
|
[ 1631 ]
(Rev.1) |
G.inp, G.vector, VDSL2: Proposed Updated Framework for Extended Memory Operation
|
Broadcom Corporation
,
Ikanos Communications
,
Lantiq Beteiligungs-GmbH & Co. KG
|
Q4/15
|
2011-11-21 |
|
[ 1572 ]
(Rev.1) |
G.inp: Crosstalk management in PET mode
|
Metanoia Technologies, Inc.
|
Q4/15
|
2011-11-18 |
|
[ 1531 ]
(Rev.1) |
Support for the consent and approval of G.hn draft Recommendations
|
Israel
|
Q4/15
|
2011-11-17 |
|
[ 1530 ]
(Rev.1) |
G.vector: Vectoring in the Presence of UPBO
|
Israel
|
Q4/15
|
2011-11-17 |
|
[ 1521 ]
(Rev.1) |
Submission to update the G3 DLL specs in Recommendation ITU-T G.9956
|
ERDF
|
Q4/15
|
2011-08-23 |
Results:47 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):