Contributions
[ AI/Question: Q13/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1928 ]
|
Measurement Methods for Phase/Time Clocks
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1927 ]
|
PTP and SyncE over OTN-ODU0
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1926 ]
|
G.8271: Minor editorial improvements
|
Deutsche Telekom AG
|
Q13/15
|
2011-11-23 |
|
[ 1925 ]
|
G.8271 1pps interface performance specification
|
Deutsche Telekom AG
,
France Télécom Orange
|
Q13/15
|
2011-11-23 |
|
[ 1924 ]
|
Additional Simulation Results of Packet Slave Clock Frequency Based Upon 2nd Order PLL
|
Tellabs Oy
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1916 ]
(Rev.1) |
Parameter proposals for PTP time profile
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1915 ]
(Rev.1) |
Proposal to remove Class A/ Class B metric classification from G.8260
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1911 ]
(Rev.1) |
G.8263 holdover requirement/squelch
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1909 ]
(Rev.1-2) |
PDV tolerance masks for HRM-1 and HRM-2
|
Nokia Siemens Networks GmbH & Co. KG
|
Q13/15
|
2011-11-22 |
|
[ 1895 ]
|
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1894 ]
|
G.8271: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1893 ]
|
G.8263: Section 9 - PEC-S-F holdover
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1892 ]
|
G.8263: Section 6 - PEC-S-F slave clock noise generation
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1891 ]
|
G.8263: New Appendix discussing time constant values
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1890 ]
|
G.8261.1: Notes on network equipments producing excessive PDV
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1889 ]
|
G.8261.1: Editorial comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1888 ]
|
G.8260: Request for clarification about the MAFE corner point
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1887 ]
|
G.8260: Comments on latest draft
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1886 ]
|
Transport of CPRI interface over OTN
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1885 ]
|
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
|
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1884 ]
|
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
|
Calnex Solutions Limited
,
France Télécom Orange
|
Q13/15
|
2011-11-22 |
|
[ 1879 ]
|
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset
|
China Telecommunications Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1841 ]
|
Proposal of RS422 1PPS time/phase as a time measurement interface
|
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
|
Q13/15
|
2011-11-22 |
|
[ 1780 ]
(Rev.1) |
Consideration on PTP over OTN solution options
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-22 |
|
[ 1772 ]
(Rev.1) |
Development of PTP time transport HRMs that encompass OTN
|
Alcatel-Lucent Italia S.p.A.
,
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-22 |
|
[ 1752 ]
(Rev.1) |
JDSU Time Offset Measurement
|
JDSU Deutschland GmbH
|
Q13/15
|
2011-11-22 |
|
[ 1734 ]
|
Status of Jitter/Wander Requirements and Performance for the Transport of SDI Video Clients over OTN
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1733 ]
|
Rise time requirements of RS422 1PPS_OUT signal
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1730 ]
|
Maximum FFO of the Output of a Second-Order PLL due to a Sinusoidal and Triangular Wave Input
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1729 ]
|
Initial Simulation Results for Transport of Time over the HRM2b chain of Boundary Clocks
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co. Ltd.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1728 ]
|
Detection and removal of Delay Jumps using FWPR and minMATIE
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1727 ]
|
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands
|
Huawei Technologies Co. Ltd.
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1726 ]
|
Criterion for Minimum Detectable Floor Delay Step using minMATIE
|
Huawei Technologies Co. Ltd.
|
Q13/15
|
2011-11-21 |
|
[ 1725 ]
|
Initial Simulation Results for Transport of Time over the HRM3 chain of Boundary Clocks, with SyncE Reference Chain Rearrangements
|
France Télécom Orange
,
France Télécom Orange
,
Huawei Technologies Co.
,
Iometrix, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1723 ]
(Rev.1) |
Request for evaluation of OTN support for CPRI
|
AT&T, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1708 ]
(Rev.1) |
Security with Timing as a Managed Service
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1707 ]
(Rev.1) |
Considerations on Packet Rate for the PEC-S-F
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1703 ]
(Rev.1) |
PEC-S-F Output Timing Signals
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1702 ]
(Rev.1) |
Noise Tolerance for the Packet Slave Clock (PEC-S-F)
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1701 ]
|
Synchronization Requirement in OTN
|
China Mobile Communications Corporation
|
Q13/15, Q11/15
|
2011-11-21 |
|
[ 1700 ]
(Rev.1) |
Noise Generation for the Packet Slave Clock (PEC-S-F)
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1699 ]
|
The OAM structure and functions requirements for Packet-based synchronization network
|
China Mobile Communications Corporation
|
Q13/15
|
2011-11-21 |
|
[ 1696 ]
(Rev.1) |
Testing of Packet Slave Clocks
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1695 ]
(Rev.1) |
Measuring PRTC Accuracy
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1693 ]
(Rev.1) |
Cesium Clock Wander Contribution to Grandmaster Clock Characterization
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1691 ]
(Rev.1-2) |
Testing Packet Slave Clocks using Flicker Noise
|
SymmetriCom, Inc.
|
Q13/15
|
2011-11-21 |
|
[ 1690 ]
(Rev.1) |
Proposal to study the convergence of PON and transport network in the next study period
|
ZTE Corporation
|
Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-11-21 |
|
[ 1689 ]
(Rev.1) |
Proposal to study the convergence of optical and packet in the next study period
|
ZTE Corporation
|
Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15
|
2011-11-21 |
|
[ 1685 ]
(Rev.1) |
G.8273.2: Discussion on text for Sections 6 through 9.
|
Calnex Solutions Limited
|
Q13/15
|
2011-11-21 |
|
[ 1684 ]
(Rev.1) |
Comments on draft G.8260, Section I.5 'PDV Metrics studying minimum floor delay packet population.'
|
Calnex Solutions Limited
|
Q13/15
|
2011-11-21 |
Results:90 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):