International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:25 total items.
Contributions  [ Source: ZTE ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1348 ]  
 
Proposal for an alternative method for SD detection     ZTE   Q9/15   2011-02-01
[ 1347 ]  
 
Comments on aTSF of ETHx in G.8021     ZTE   Q9/15   2011-02-01
[ 1281 ]  
 
Proposed texts for G.smp     ZTE   Q9/15   2011-01-31
[ 1280 ]  
 
Automatic Protection Switching (APS) protocol for Shared Mesh Protection     ZTE   Q9/15   2011-01-31
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1277 ]  
 
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO     ZTE   Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1257 ]  
 
Propose a latency measurement model of equipment     ZTE   Q9/15   2011-01-31
[ 1256 ]  
 
Requirement for communication latency as a traffic engineering performance metric in ASON     ZTE   Q14/15, Q12/15   2011-01-31
[ 1235 ]  
 
Proposal on maximum PTP clock number in the time reference model     CMCC , CATR , ZTE   Q13/15   2011-01-31
[ 1234 ]  
 
TOD specification     CMCC , CATR , Huawei , ZTE   Q13/15   2011-01-31
[ 1233 ]  
 
PTP frequency sync with partial timing support     ZTE   Q13/15   2011-01-31
[ 1232 ]  
 
Proposals on the BC simulation model in G.8273     ZTE   Q13/15   2011-01-31
[ 1211 ]  
 
IPv6 related MEs updation for G.988     ZTE , China MII   Q2/15   2011-01-31
[ 1208 ]  
(Rev.1) 
Non-ERP node in ring (G.8032)     ZTE , China   Q9/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1206 ]  
 
Updated description for multicast preview function in G.988     ZTE , Huawei   Q2/15   2011-01-31
[ 1205 ]  
 
Ignore value setting for attribute Dynamic filtering ageing time of ME MAC bridge service profile in G.988     ZTE   Q2/15   2011-01-31
[ 1151 ]  
 
Wavelength Proposal on TEE to HEE direction in G.sdapp     ZTE   Q6/15   2011-01-31
[ 1130 ]  
 
Add topoly usecase in G.8152     ZTE Corporation   Q14/15   2011-01-28
[ 1129 ]  
 
Add topoly support in G.8151     ZTE Corporation   Q14/15   2011-01-28
[ 1119 ]  
 
Standardization of modulation formats     ZTE Corporation   Q6/15   2011-01-27
[ 1118 ]  
 
Required information for non-linear effects estimation for Situation 2 of G.680     ZTE Corporation   Q6/15   2011-01-27
[ 1117 ]  
 
Considerations on Maximum spectral excursion and Maximum ripple in G.698.2     ZTE Corporation   Q6/15   2011-01-27
[ 1116 ]  
 
Proposals on granularity of the flexible grids in G.694.1     ZTE Corporation   Q6/15   2011-01-27
Results:25 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-26