Contributions
[ Source: ZTE ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1348 ]
|
Proposal for an alternative method for SD detection
|
ZTE
|
Q9/15
|
2011-02-01 |
|
[ 1347 ]
|
Comments on aTSF of ETHx in G.8021
|
ZTE
|
Q9/15
|
2011-02-01 |
|
[ 1281 ]
|
Proposed texts for G.smp
|
ZTE
|
Q9/15
|
2011-01-31 |
|
[ 1280 ]
|
Automatic Protection Switching (APS) protocol for Shared Mesh Protection
|
ZTE
|
Q9/15
|
2011-01-31 |
|
[ 1279 ]
|
Consideration on TS sequence in HAO
|
ZTE
|
Q14/15, Q12/15, Q11/15
|
2011-01-31 |
|
[ 1277 ]
|
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO
|
ZTE
|
Q11/15
|
2011-01-31 |
|
[ 1258 ]
|
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao
|
ZTE
|
Q14/15, Q12/15, Q11/15
|
2011-01-31 |
|
[ 1257 ]
|
Propose a latency measurement model of equipment
|
ZTE
|
Q9/15
|
2011-01-31 |
|
[ 1256 ]
|
Requirement for communication latency as a traffic engineering performance metric in ASON
|
ZTE
|
Q14/15, Q12/15
|
2011-01-31 |
|
[ 1235 ]
|
Proposal on maximum PTP clock number in the time reference model
|
CMCC
,
CATR
,
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1234 ]
|
TOD specification
|
CMCC
,
CATR
,
Huawei
,
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1233 ]
|
PTP frequency sync with partial timing support
|
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1232 ]
|
Proposals on the BC simulation model in G.8273
|
ZTE
|
Q13/15
|
2011-01-31 |
|
[ 1211 ]
|
IPv6 related MEs updation for G.988
|
ZTE
,
China MII
|
Q2/15
|
2011-01-31 |
|
[ 1208 ]
(Rev.1) |
Non-ERP node in ring (G.8032)
|
ZTE
,
China
|
Q9/15
|
2011-01-31 |
|
[ 1207 ]
|
Support for consent of G.tpoam
|
ZTE
,
Alcatel-Lucent Shanghai Bell
,
Fiberhome
,
Huawei
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-31 |
|
[ 1206 ]
|
Updated description for multicast preview function in G.988
|
ZTE
,
Huawei
|
Q2/15
|
2011-01-31 |
|
[ 1205 ]
|
Ignore value setting for attribute Dynamic filtering ageing time of ME MAC bridge service profile in G.988
|
ZTE
|
Q2/15
|
2011-01-31 |
|
[ 1151 ]
|
Wavelength Proposal on TEE to HEE direction in G.sdapp
|
ZTE
|
Q6/15
|
2011-01-31 |
|
[ 1130 ]
|
Add topoly usecase in G.8152
|
ZTE Corporation
|
Q14/15
|
2011-01-28 |
|
[ 1129 ]
|
Add topoly support in G.8151
|
ZTE Corporation
|
Q14/15
|
2011-01-28 |
|
[ 1119 ]
|
Standardization of modulation formats
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1118 ]
|
Required information for non-linear effects estimation for Situation 2 of G.680
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1117 ]
|
Considerations on Maximum spectral excursion and Maximum ripple in G.698.2
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
|
[ 1116 ]
|
Proposals on granularity of the flexible grids in G.694.1
|
ZTE Corporation
|
Q6/15
|
2011-01-27 |
Results:25 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):