International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:23 total items.
Contributions  [ Source: BT ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1471 ]  
 
G.vdsl, G.hn: BT's FTTdp Vision     BT   Q4/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1423 ]  
 
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)     BT   Q4/15   2011-02-01
[ 1422 ]  
 
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes     BT   Q4/15   2011-02-01
[ 1421 ]  
 
G.VDSL: INM INPEQ Histogram     BT   Q4/15   2011-02-01
[ 1419 ]  
 
G.VDSL: INM IAT Histogram     BT   Q4/15   2011-02-01
[ 1417 ]  
 
G.LT: PSD Shaped SELT     BT   Q4/15   2011-02-01
[ 1403 ]  
 
G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information     BT   Q4/15   2011-02-01
[ 1402 ]  
 
G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information     BT   Q4/15   2011-02-01
[ 1393 ]  
 
G.INP: VDSL2 will require retransmission upstream     BT   Q4/15   2011-02-01
[ 1391 ]  
 
Synchronisation Budget     BT   Q13/15   2011-02-01
[ 1388 ]  
 
Multiple Independent Timing Domains     BT   Q13/15   2011-02-01
[ 1370 ]  
 
Comments on working assumption at Berlin meeting and TD377 (wd31r1)     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q9/15, Q12/15, Q10/15   2011-02-01
[ 1365 ]  
 
Status of IETF OAM tools for MPLS-TP     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q10/15   2011-02-01
[ 1339 ]  
 
Fulfilling the OAM Requirements for MPLS-TP     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q10/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1304 ]  
 
Proposed text for G.tpoam     Cisco , BT , Ericsson , Juniper , NSN , Qwest , Telenor , Verizon   Q10/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1302 ]  
 
Technical issues with an OAM protocol based on draft-bhh-mpls-tp-oam-y1731     Cisco , BT , Juniper , NSN , Qwest , Telenor , Telstra , Verizon   Q10/15   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1146 ]  
 
G.671 PON Splitter Amendment     BT   Q7/15   2011-01-28
[ 1145 ]  
 
G.652E - Telecommunications fibres with improved performance inheriting their specification from G.657a1     BT   Q5/15   2011-01-28
[ 1144 ]  
 
ITU-T G.652(E) & G.657 Telecommunications fibres - Enhanced Geometry Amendment     BT   Q5/15   2011-01-28
Results:23 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-23