Contributions
[ AI/Question: Q9/15 ] |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1168 ]
|
G.ptneq consent
|
Canada
|
Q9/15
|
2011-01-31 |
|
[ 1167 ]
|
PBB model for G.8021 & G.8010
|
Ericsson Canada
|
Q9/15, Q14/15, Q12/15
|
2011-01-31 |
|
[ 1164 ]
|
MAC Operations using Y.1731
|
Alcatel-Lucent USA
,
Verizon
|
Q9/15, Q14/15, Q10/15
|
2011-01-31 |
|
[ 1161 ]
|
MAC Operations using Y.1731 Motivation and Rationale
|
Alcatel-Lucent USA
,
Verizon
|
Q9/15, Q14/15, Q10/15
|
2011-01-31 |
|
[ 1160 ]
|
Roles and Layers for G.ptneq
|
NSN
|
Q9/15
|
2011-01-31 |
|
[ 1143 ]
(Rev.1) |
MPLS-TP Standards
|
United Kingdom
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1124 ]
|
Structure and content of the MPLS-TP Recommendations
|
CMCC,CT , CATR
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1123 ]
|
Associated Channel Type for G.tpoam
|
CMCC, CT,CATR
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-28 |
|
[ 1122 ]
|
Protection of blinking failures
|
Ericsson
|
Q9/15
|
2011-01-27 |
|
[ 1113 ]
(Rev.1) |
Comments on content of clauses 8 and 9 of G.tpoam
|
Ericsson
|
Q9/15
|
2011-01-26 |
|
[ 1112 ]
|
Automatic election of RPL and RPL Owner in G.8032
|
Korea (Republic of)
|
Q9/15
|
2011-01-26 |
|
[ 1111 ]
|
Event message timer for G.8032 interconnected ring
|
Korea (Republic of)
|
Q9/15
|
2011-01-26 |
|
[ 1110 ]
|
Proposed text for end-to-end service resilience between Ethernet ring and MPLS-TP ring
|
Korea (Republic of)
|
Q9/15
|
2011-01-26 |
|
[ 1109 ]
|
Proposed modification to G.8031/Y.1342 state transition tables for received far-end request
|
Korea (Republic of)
|
Q9/15
|
2011-01-26 |
|
[ 1108 ]
|
Hold-off timer operation in G.808.1
|
Korea (Republic of)
|
Q9/15
|
2011-01-26 |
|
[ 1107 ]
|
Proposed modification to G.8031/Y.1342 state transition tables for SD-triggered protection
|
Korea (Republic of)
|
Q9/15
|
2011-01-26 |
|
[ 1106 ]
|
40GE&100GE PCS BIP8 monitoring handling requirements in G.798
|
China Telecom, Huawei Technologies
|
Q9/15
|
2011-01-25 |
|
[ 1105 ]
|
Proposal about SD triggered protection switching for packet transport technologies
|
China Telecom
|
Q9/15
|
2011-01-25 |
|
[ 1104 ]
|
Further consideration of the adaptive Bandwidth Adjustment scheme
|
Ericsson
|
Q9/15, Q10/15
|
2011-01-25 |
Results:119 total items. Result page:
Previous -
1 -
2 -
3
|
Multiple Document Download: Formats and Languages to be included (when available):