International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:83 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1517 ]  
 
Specification of a Pulse per Second (1PPS) interface for Telecom     Huawei   Q13/15   2011-02-02
[ 1516 ]  
 
Translation of an IP Multicast address to an Ethernet MAC Multicast address     Huawei   Q13/15   2011-02-02
[ 1515 ]  
 
PTP link-local and internetwork IPv4 Multicast addresses for hop-by-hop time transfer     Huawei   Q13/15   2011-02-02
[ 1514 ]  
 
Effect of Pdelay or Delay Request/Response Turnaround Time, and Sojourn Time, on Boundary Clock Performance     Huawei   Q13/15   2011-02-02
[ 1513 ]  
 
G.8275.1 time-profile: ClockClass attribute discussion     Huawei   Q13/15   2011-02-02
[ 1512 ]  
 
Minimum 1PPS requirements and additional requirements     Huawei   Q13/15   2011-02-02
[ 1511 ]  
 
Mathematical Description of Boundary Clock Simulation Models for the Case of Frequency Distribution via syncE     Huawei   Q13/15   2011-02-02
[ 1510 ]  
 
Comparison of Boundary Clock Simulation Models     Huawei   Q13/15   2011-02-02
[ 1509 ]  
 
Additional external 1PPS interface point, and PTP / non-PTP interworking for GPON/DSL     Huawei   Q13/15   2011-02-02
[ 1497 ]  
 
Architectural constructs to describe phase/time distribution     Ciena Corporation   Q13/15   2011-02-02
[ 1459 ]  
 
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)     France Telecom , Tellabs   Q13/15   2011-02-02
[ 1458 ]  
 
Network PDV accumulation study with "end-to-end" data traffic model     France Telecom   Q13/15   2011-02-02
[ 1457 ]  
 
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented     France Telecom   Q13/15   2011-02-02
[ 1456 ]  
 
G.8272: comments on PRTC limits proposal     France Telecom   Q13/15   2011-02-02
[ 1455 ]  
 
G.8263: testing methodology for the PDV tolerance of a packet slave clock     France Telecom   Q13/15   2011-02-02
[ 1454 ]  
 
G.8261.1: Hypothetical Reference Models proposal     France Telecom   Q13/15   2011-02-02
[ 1453 ]  
 
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1     France Telecom   Q13/15   2011-02-02
[ 1452 ]  
 
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks     France Telecom   Q13/15   2011-02-02
[ 1451 ]  
 
Analysis of phase/time distribution over OTN networks     France Telecom   Q9/15, Q13/15, Q11/15   2011-02-02
[ 1450 ]  
 
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization     France Telecom   Q13/15   2011-02-02
[ 1446 ]  
 
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP     NTT   Q3/15, Q13/15   2011-02-02
[ 1436 ]  
 
Control elements for BMCA in telecom     NSN   Q13/15   2011-02-02
[ 1435 ]  
 
MATIE, MTIE, and MAFE graphs into metrics definitions     NSN   Q13/15   2011-02-02
[ 1424 ]  
 
Treatment of delay jumps in PDV data     NSN   Q13/15   2011-02-02
[ 1418 ]  
 
Dealing with multiple criteria of packet selection     Calnex Solutions   Q13/15   2011-02-01
[ 1400 ]  
 
Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network     Ericsson   Q13/15   2011-02-01
[ 1391 ]  
 
Synchronisation Budget     BT   Q13/15   2011-02-01
[ 1388 ]  
 
Multiple Independent Timing Domains     BT   Q13/15   2011-02-01
[ 1386 ]  
 
Comments on G.8260 latest draft and WDedi107     RAD Data Communications   Q13/15   2011-02-01
[ 1358 ]  
 
Mean Delay Offset measurement - A metric to evaluate delay floor stability for ACR systems     LSI   Q13/15   2011-02-01
[ 1357 ]  
 
IEEE 1588-2008( + synchronous Ethernet in a time-setting mode of operation     LSI   Q13/15   2011-02-01
[ 1356 ]  
 
Time Synchronizing using the selective synchronization method     LSI   Q13/15   2011-02-01
[ 1355 ]  
 
Time of Day Interface Performance     Symmetricom , Semtech   Q13/15   2011-02-01
[ 1354 ]  
 
Time of Day Interfaces for Equipment Connections     Symmetricom , Semtech   Q13/15   2011-02-01
[ 1353 ]  
 
Syntronization of Boundary Clocks     Symmetricom   Q13/15   2011-02-01
[ 1352 ]  
 
Discussion of Hypothetical Reference Model for Time Distribution     Symmetricom   Q13/15   2011-02-01
[ 1351 ]  
 
Wander Specification for Grand Master Clocks     Symmetricom   Q13/15   2011-02-01
[ 1350 ]  
 
Definition of Coherent Time and Frequency     Symmetricom   Q13/15   2011-02-01
[ 1349 ]  
 
Metrics Definitions and Usage for G.8260 Appendix     Symmetricon   Q13/15   2011-02-01
[ 1342 ]  
 
Transparent Clocks in a hop-by-hop time/phase distribution     Alcatel-Lucent France   Q13/15   2011-02-01
[ 1341 ]  
 
Considerations on the use of the IEEE1588 Transparent Clock in the Time Sync Architectures (G.8275)     Ericsson   Q13/15   2011-02-01
[ 1340 ]  
 
Time-of-Day distribution across Transport Provider Networks     Alcatel-Lucent France   Q13/15   2011-02-01
[ 1337 ]  
 
Discussion on Architecture and BMCA for the Time Sync Telecom Profile (G.8275 and G.8275.1)     Ericsson   Q13/15   2011-02-01
[ 1336 ]  
 
Time and Phase Sync Interfaces (G.8271)     Ericsson   Q13/15   2011-02-01
[ 1335 ]  
 
PTP Mapping in the first Time Sync Telecom Profile (G. 8275.1)     Ericsson   Q13/15   2011-02-01
[ 1287 ]  
 
G.987.3: Draft Text for Transparent Clock Mechanism     Adtran , Calix , PMC-Sierra   Q2/15, Q13/15   2011-01-31
[ 1286 ]  
 
G.987.1: Draft Text for IEEE 1588 Packet Timing Reference Model     Adtran , Calix , PMC-Sierra   Q2/15, Q13/15   2011-01-31
[ 1272 ]  
 
Relevant Clauses for J.211     Semtech   Q13/15   2011-01-31
[ 1267 ]  
 
G.8272 PRTC type approval process proposal     Deutsche Telekom   Q13/15   2011-01-31
[ 1266 ]  
 
G.8272 PRTC Options: Temperature     Deutsche Telekom   Q13/15   2011-01-31
Results:83 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-23