International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:22 total items.
Contributions  [ AI/Question: Q11/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1493 ]  
 
G.hao impact on G.7713     Ciena Corporation   Q14/15, Q11/15   2011-02-02
[ 1490 ]  
 
Considerations on ODUflex and ODUflex resizing     Ciena Corporation   Q11/15   2011-02-02
[ 1451 ]  
 
Analysis of phase/time distribution over OTN networks     France Telecom   Q9/15, Q13/15, Q11/15   2011-02-02
[ 1420 ]  
 
Functional model of HAO     Huawei   Q9/15, Q11/15   2011-02-01
[ 1414 ]  
 
Proposal for addition of HO OPU mapping types in G.709     ETRI   Q11/15   2011-02-01
[ 1413 ]  
 
Proposed modification of G.709 (12/2009) Appendix XII for inclusion in G.709 Amendment 2     ETRI   Q11/15   2011-02-01
[ 1412 ]  
 
Addition of new Appendix/G.7041 for ODUflex(GFP) packet data throughput     ETRI   Q11/15   2011-02-01
[ 1401 ]  
 
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)     NTT   Q9/15, Q11/15   2011-02-01
[ 1378 ]  
 
ODUflex(GFP) Recommended Bit Rates     Alcatel-Lucent   Q9/15, Q11/15   2011-02-01
[ 1346 ]  
 
Nested Restoration Domains - Data-plane maintenance overhead signals     Tellabs Oy   Q9/15, Q12/15, Q11/15   2011-02-01
[ 1319 ]  
 
PCSL error control block insertion and BIP8 transparency for 100GBASE-R/ODU4     Fujitsu , CIAJ , Hitachi , Mitsubishi , NEC   Q9/15, Q11/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1277 ]  
 
Proposals to clarify the definition and usage of RP bit and add a resizing state machine to G.HAO     ZTE   Q11/15   2011-01-31
[ 1260 ]  
 
Consideration on OTU5 (400G)     Huawei   Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1246 ]  
 
A proposal to fault scenario analysis of draft G.hao     ETRI   Q11/15   2011-01-31
[ 1245 ]  
 
A proposal to session timer for draft G.hao     ETRI   Q11/15   2011-01-31
[ 1210 ]  
 
The support of OSC transmition 1588V2 in OTN/G.798.1     Fiberhome Technologies Group , China Academy of Telecommunication Research   Q9/15, Q13/15, Q11/15   2011-01-31
[ 1184 ]  
 
Rate Change Considerations during BWR in G.hao     PMC-Sierra   Q11/15   2011-01-31
[ 1183 ]  
 
Clarifications to G.hao     PMC-Sierra   Q11/15   2011-01-31
[ 1175 ]  
 
Considerations on 100GE PCS BIP8 Transparency     Avalon Microelectronics   Q11/15   2011-01-31
Results:22 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26