Contributions
[ AI/Question: 2/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1518 ]
|
Structuring of MPLS-TP Recommendations
|
Telefónica Investigación y Desarrollo
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-11 |
|
[ 1496 ]
|
Multilayer SCN Issues
|
Ciena Corporation
|
Q14/15, Q12/15
|
2011-02-02 |
|
[ 1495 ]
|
G.8080 - SP10 - call routing
|
Ciena Corporation
|
Q14/15, Q12/15
|
2011-02-02 |
|
[ 1494 ]
|
G.8080 and multi-layer topology
|
Ciena Corporation
|
Q12/15
|
2011-02-02 |
|
[ 1491 ]
|
Editing of G.8010 V2
|
Ciena Corporation
|
Q12/15
|
2011-02-02 |
|
[ 1468 ]
|
Transitional Link attributes for optical transponders and 3R regenerators in the OTN
|
Alcatel-Lucent
|
Q14/15, Q12/15
|
2011-02-02 |
|
[ 1461 ]
|
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"
|
NSN
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1449 ]
|
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
|
NTT
,
Telecom Italia
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1448 ]
|
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
|
NTT
|
Q12/15, Q10/15
|
2011-02-02 |
|
[ 1445 ]
|
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions
|
ISOC
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1441 ]
|
Withdrawn: MPLS-TP Standards
|
BT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1439 ]
|
Comments on differentiation of MPLS-TP environments
|
NSN
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-02 |
|
[ 1406 ]
|
OMCI Tip-Ring Test Result for POTS UNI
|
A.T. Communication Channels
,
Ericsson
|
Q2/15
|
2011-02-01 |
|
[ 1405 ]
|
OMCI updates for Vendor-specific Test Parameters
|
A.T. Communication Channels
,
Ericsson
|
Q2/15
|
2011-02-01 |
|
[ 1404 ]
|
Enabling variable message length in extended message format
|
A.T. Communication Channels
,
Alcatel-Lucent
,
Ericsson
|
Q2/15
|
2011-02-01 |
|
[ 1396 ]
|
Relation between G.aon and G.872
|
Deutsche Telekom
|
Q12/15
|
2011-02-01 |
|
[ 1395 ]
|
WCh clients in draft G.aon
|
Deutsche Telekom
|
Q12/15
|
2011-02-01 |
|
[ 1394 ]
|
Properties of a Wavelength Channel in draft G.aon
|
Deutsche Telekom
|
Q12/15
|
2011-02-01 |
|
[ 1385 ]
|
Support for the consent of G.8110.1 and G.tpoam
|
Italy
|
Q12/15, Q10/15
|
2011-02-01 |
|
[ 1384 ]
|
Structure and content of the MPLS-TP Recommendations
|
Telecom Italia
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1372 ]
|
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks
|
Israel
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1370 ]
|
Comments on working assumption at Berlin meeting and TD377 (wd31r1)
|
NSN
,
BT
,
Cisco
,
Ericsson
,
Juniper
,
Qwest
,
Telenor
,
Verizon
|
Q9/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1362 ]
|
Support for the consent of G.8110.1 and G.tpoam
|
SK Telecom
,
ETRI
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1361 ]
|
Structure of the MPLS-TP Recommendations
|
SK Telecom
,
ETRI
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1346 ]
|
Nested Restoration Domains - Data-plane maintenance overhead signals
|
Tellabs Oy
|
Q9/15, Q12/15, Q11/15
|
2011-02-01 |
|
[ 1324 ]
|
Proposal to re-define the architectures for MPLS-TP linear protection
|
Fujitsu
|
Q9/15, Q12/15
|
2011-02-01 |
|
[ 1316 ]
|
Proposal for G.epon
|
NTT
,
Mitsubishi
|
Q2/15
|
2011-02-01 |
|
[ 1307 ]
|
Associated Channel Type for G.tpoam
|
Portugal Telecom
|
Q12/15
|
2011-02-01 |
|
[ 1306 ]
|
Support for the consent of G.8110.1 and G.tpoam
|
Portugal Telecom
|
Q12/15, Q10/15
|
2011-02-01 |
|
[ 1305 ]
|
Procedural issues on MPLS-TP
|
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15
|
2011-02-01 |
|
[ 1303 ]
|
Inter SDO Cooperation on MPLS-TP
|
Cisco
,
AT&T
,
BT
,
Juniper
,
Qwest
,
Telenor
,
Telstra
,
Verizon
|
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5
|
2011-02-01 |
|
[ 1301 ]
|
Operator Requirements for MPLS-TP OAM
|
Verizon
,
BT
,
France Telecom Orange
,
Qwest
,
Telenor
,
Telstra
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1298 ]
|
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution
|
Juniper Networks
,
Cisco
,
NSN
,
Verizon
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-02-01 |
|
[ 1297 ]
|
Considerations on G.800 style ETH transport processing functions in draft revised G.8010
|
Huawei
,
Deutsche Telekom
|
Q12/15
|
2011-02-01 |
|
[ 1296 ]
|
G.800 server subnetwork and ETH server subnetwork definitions
|
Huawei
,
Deutsche Telekom
|
Q12/15
|
2011-02-01 |
|
[ 1295 ]
|
Models in G.8010
|
Huawei
,
Deutsche Telekom
|
Q9/15, Q14/15, Q12/15
|
2011-02-01 |
|
[ 1287 ]
|
G.987.3: Draft Text for Transparent Clock Mechanism
|
Adtran
,
Calix
,
PMC-Sierra
|
Q2/15, Q13/15
|
2011-01-31 |
|
[ 1286 ]
|
G.987.1: Draft Text for IEEE 1588 Packet Timing Reference Model
|
Adtran
,
Calix
,
PMC-Sierra
|
Q2/15, Q13/15
|
2011-01-31 |
|
[ 1285 ]
|
Associated Channel Type for G.tpoam
|
WIND
|
Q12/15
|
2011-01-31 |
|
[ 1279 ]
|
Consideration on TS sequence in HAO
|
ZTE
|
Q14/15, Q12/15, Q11/15
|
2011-01-31 |
|
[ 1270 ]
|
Proposal for OMCI in EPON
|
Mitsubishi
,
Ericsson
,
Hitachi
,
NTT
|
Q2/15
|
2011-01-31 |
|
[ 1262 ]
|
Proposal for work on NG-PON protection
|
Huawei
,
MIIT China
|
Q2/15
|
2011-01-31 |
|
[ 1258 ]
|
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao
|
ZTE
|
Q14/15, Q12/15, Q11/15
|
2011-01-31 |
|
[ 1256 ]
|
Requirement for communication latency as a traffic engineering performance metric in ASON
|
ZTE
|
Q14/15, Q12/15
|
2011-01-31 |
|
[ 1254 ]
(Rev.1) |
Proposal of adding new attribute to PPTP POTS UNI ME
|
MIIT China
|
Q2/15
|
2011-01-31 |
|
[ 1253 ]
|
Proposal of adding new MAC bridge port ICMPv6 process preassign table to G.988
|
MIIT China
|
Q2/15
|
2011-01-31 |
|
[ 1248 ]
|
PTN GACh+Y.1731 OAM interoperability test activities and result
|
CATR
,
China Mobile
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-31 |
|
[ 1247 ]
|
Support for the consent of G.8110.1 and G.tpoam
|
China MIIT
|
Q9/15, Q14/15, Q12/15, Q10/15
|
2011-01-31 |
|
[ 1244 ]
|
Support for the consent of G.8110.1
|
NEC
,
Fujitsu
,
Hitachi
|
Q12/15
|
2011-01-31 |
|
[ 1221 ]
|
Comments on draft G.aon
|
Huawei
|
Q12/15
|
2011-01-31 |
Results:67 total items. Result page:
1 -
2
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):