International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2010-05-31 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2010-05-31) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:25 total items.
Contributions  [ Source: ZTE ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1070 ]  
 
1588v2 transmission by OSC over OTN     FiberHome , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1066 ]  
 
Analysis of time synchronization performance using PTP in hybrid transport network     CMCC , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1065 ]  
 
Proposal of accelerating MTIE and TDEV mask study for time synchronization     CMCC , CATR , Huawei , ZTE   Q13/15   2010-05-21
[ 1064 ]  
 
Proposal of research on link asymmetry compensation for PTP     CMCC, ZTE, CATR   Q13/15   2010-05-21
[ 1063 ]  
 
Network limits reference model for time sync accuracy     CMCC , ZTE   Q13/15   2010-05-21
[ 1044 ]  
 
Proposal for ring topology discovery     ZTE   Q14/15   2010-05-20
[ 1043 ]  
 
Scenarios of mpls-tp discovery     ZTE   Q14/15   2010-05-20
[ 1042 ]  
 
Architecture of time synchronization using packet based method in G.8275     ZTE , CMCC   Q13/15   2010-05-20
[ 1041 ]  
 
Issues about metrics of network limits for time synchronization     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1040 ]  
 
Field test of 1588v2 time sync based on physical layer frequency sync support     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1039 ]  
 
Definition related to time/phase sync in G.8260     ZTE , CMCC   Q13/15   2010-05-20
[ 1038 ]  
 
Performance analysis of 1588v2 time/sync in field test     ZTE , CMCC   Q13/15   2010-05-20
[ 1037 ]  
 
1588v2 test results with different clock mode and field network     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1036 ]  
(Rev.1) 
Consideration on Phase/Time synchronization over OTN     ZTE   Q13/15, Q11/15   2010-05-20
[ 1035 ]  
 
Proposal of Misconnection in Ring Protection     ZTE   Q9/15   2010-05-20
[ 1034 ]  
 
Consideration on LO ODUk Ring Protection     ZTE   Q9/15   2010-05-20
[ 1033 ]  
 
Comments on draft of G.ptneq generics     ZTE   Q9/15   2010-05-20
[ 1032 ]  
 
DNF at NR messages (G.8032)     ZTE   Q9/15   2010-05-20
[ 1031 ]  
 
SD scenarios (G.8031)     ZTE   Q9/15   2010-05-20
[ 1030 ]  
 
SD detection in G.8031     ZTE   Q9/15   2010-05-20
[ 1029 ]  
 
Rough estimation of system non-linear effects using non-linear phase in G.SUP 39     ZTE   Q6/15   2010-05-20
[ 1028 ]  
 
Filter phase ripple discussion for G.680     ZTE   Q6/15   2010-05-20
[ 1027 ]  
 
IPv6 Multicast filter     ZTE   Q2/15   2010-05-20
[ 1026 ]  
 
Proposal for Combo Reach Extender (CRE) device for G.987.re     ZTE   Q2/15   2010-05-20
[ 825 ]  
 
Requirement for multi stages multiplex/demultiplex configuration     China Telecom , China Mobile , China Unicom , ZTE   Q9/15, Q14/15, Q12/15   2010-05-17
Results:25 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19