International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2010-05-31 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2010-05-31) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2010-05-31 to 2010-06-11

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:20 total items.
Contributions  [ Source: CATR ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1090 ]  
 
SD triggered protection switching in G.8031     CATR , Huawei   Q9/15   2010-05-21
[ 1070 ]  
 
1588v2 transmission by OSC over OTN     FiberHome , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1067 ]  
 
GPS timing receiver characterization     Symmetricom , CATR , CMCC   Q13/15, Q11/15   2010-05-21
[ 1066 ]  
 
Analysis of time synchronization performance using PTP in hybrid transport network     CMCC , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1065 ]  
 
Proposal of accelerating MTIE and TDEV mask study for time synchronization     CMCC , CATR , Huawei , ZTE   Q13/15   2010-05-21
[ 1064 ]  
 
Proposal of research on link asymmetry compensation for PTP     CMCC, ZTE, CATR   Q13/15   2010-05-21
[ 1062 ]  
 
Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth     CATR   Q15/15   2010-05-21
[ 1061 ]  
 
Proposal of revising for SSM message delay description in G.8264     CATR   Q13/15   2010-05-21
[ 1060 ]  
 
Objectives and Requirements for G.827x Recommendations     CATR , Huawei   Q13/15   2010-05-21
[ 1059 ]  
 
Functionality proposals about MPLS-TP OAM toolsets in G.tpoam     CATR   Q10/15   2010-05-21
[ 1057 ]  
 
Some consideration with 40G intra-office interface parameters     CATR   Q6/15   2010-05-21
[ 1056 ]  
 
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     CATR , Huawei   Q6/15   2010-05-21
[ 1055 ]  
 
40G application code for G.698.2     CATR   Q6/15   2010-05-21
[ 1048 ]  
 
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     CATR   Q6/15   2010-05-22
[ 1041 ]  
 
Issues about metrics of network limits for time synchronization     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1040 ]  
 
Field test of 1588v2 time sync based on physical layer frequency sync support     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1037 ]  
 
1588v2 test results with different clock mode and field network     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 904 ]  
 
G.827x Recommendations - High-Level Objectives     Huawei , CATR , MII   Q13/15   2010-05-18
[ 903 ]  
 
Pulse-Per-Second Interface     Huawei , CATR , China Mobile Communications Corporation , MII   Q13/15   2010-05-18
[ 823 ]  
 
Propose to add an appendix to describe EVPRM solution to G.8011.4     Alcatel Lucent Shanghai Bell , CATR , Ministry of Information Industry of P.R. of China   Q10/15   2010-05-17
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-5