International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2009-09-28 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2009-09-28) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Results:21 total items.
Contributions  [ AI/Question: Q6/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 715 ]  
 
Proposal to update the descriptions of non-linear fibre impairments at clause 9 of sup39     Alcatel-Lucent   Q6/15   2009-09-20
[ 714 ]  
 
Proposal to update Fig. I.1 of G.696.1 taking nonlinear effects into account on OSNR limitations versus number of spans     Alcatel-Lucent   Q6/15   2009-09-20
[ 713 ]  
 
Proposal to update G.691 application tables with dispersion values for G.653 fibres     Alcatel-Lucent   Q6/15   2009-09-20
[ 692 ]  
 
Proposal for OSNR parameter values at point RS for 10G/50GHz application codes in G.698.2     Huawei Technologies   Q6/15   2009-09-20
[ 691 ]  
 
Proposal for new sub-clauses into G.696.1 about mixed 10G/40G/100G transmission     Huawei Technologies   Q6/15   2009-09-20
[ 625 ]  
 
OTU4 FEC for metro distance     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 624 ]  
 
Naming of OTN interfaces in G.709     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 623 ]  
 
Network requirement of G.709 interfaces used for Black Link applications.     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 622 ]  
 
Experimental demonstration of black-link applications     Deutsche Telekom   Q6/15, Q11/15   2009-09-20
[ 613 ]  
 
G.680: modelling amplitude and phase in single and cascaded ONEs     Ericsson   Q6/15   2009-09-20
[ 590 ]  
 
Relativity Issue of Spectral Excursion & Maximum Ripple     ZTE Corporation   Q6/15   2009-09-18
[ 581 ]  
 
Proposal for adding some contents in appendix of G.696.1     ZTE Corporation   Q6/15   2009-09-18
[ 579 ]  
 
Consideration on maximum spectral excursion for 10G_50GHz in G.698.2     ZTE Corporation   Q6/15   2009-09-18
[ 563 ]  
 
Document withdrawn     MII   Q6/15   2009-09-18
[ 539 ]  
 
Proposal for a revision of Recommendation G.696.1 for 100G application code     NTT   Q6/15   2009-09-18
[ 507 ]  
 
Applicability of the Q-factor measurement method to non-OOK optical signals     Ericsson   Q6/15   2009-09-17
[ 500 ]  
 
Frequency grid for GPON wavelength converted Reach Extenders     Nortel Networks (Canada)   Q6/15, Q2/15   2009-09-17
[ 432 ]  
 
Optical Monitoring     AT&T   Q7/15, Q6/15   2009-09-16
[ 431 ]  
 
G.709 "Black Link" OTM-1r.m Interface as IrDI     AT&T   Q6/15, Q12/15, Q11/15   2009-09-16
[ 426 ]  
 
Eye Mask for 10G G.695     Nortel Networks (Canada)   Q6/15   2009-09-16
[ 415 ]  
 
Considerations about physical layer configurations for WSON     Ericsson   Q6/15   2009-09-15
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-20