Contributions
[ AI/Question: Q4/15 ]  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 747 ]
|
Analysis of Last Call Comments
|
Panasonic Corporation
|
Q4/15
|
2009-09-24 |
|
[ 746 ]
|
Proposal for 'black box recorder' functionality for VDSL
|
BT plc
|
Q4/15
|
2009-09-22 |
|
[ 739 ]
|
G.hn: The "additional channel estimation symbol" as an optional symbol
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 738 ]
|
G.hn: clarification to the text describing transmission of the "extended PHY frame header"
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 737 ]
|
G.hn: reserving some of the "Reserved by ITU-T" bits in the PHY frame header for vendor specific usage
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 736 ]
|
G.hn: PHY frame header - Size of the Duration field and frame-type specific fields re-ordering
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 735 ]
|
G.hn: Extended-detection STXOP indicator in the TXOP descriptor
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 734 ]
|
G.hn: Time-Slot Size for INUSE and PR signals
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 733 ]
|
G.hn: Support for G.hn related Recommendations
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 732 ]
|
CBTS closure cases without INUSE signal
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 731 ]
|
CBTS closure cases with INUSE signal
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 730 ]
|
Updates for the text describing media access in CBTS
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 729 ]
|
G.hn: Proposal for CYCLE_MIN and CYCLE_MAX in 09CC-R12R1, "G.hn: Draft text for G.hn"
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 728 ]
|
G.hn: Proposal for TX_ON and TS_DURATION in 09CC-R12R1, "G.hn: Draft text for G.hn"
|
CopperGate Communications
,
DS2
,
Gigle Semiconductor
|
Q4/15
|
2009-09-21 |
|
[ 727 ]
|
G.hn: Proposal for TIFG_MIN in 09CC-R12R1, "G.hn: Draft text for G.hn"
|
CopperGate Communications
,
DS2
,
Gigle Semiconductor
|
Q4/15
|
2009-09-21 |
|
[ 726 ]
|
TS grid synchronization loss detection and recovery
|
CopperGate Communications
|
Q4/15
|
2009-09-21 |
|
[ 712 ]
|
G.vector: Proposed way forward on the issue of FDM pilots
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 711 ]
|
G.vector: On Error Sample Quantization Format
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 710 ]
|
G.vector: Line Stability after a Disorderly Leaving Event
|
Huawei Technologies
,
MII
|
Q4/15
|
2009-09-20 |
|
[ 669 ]
|
France Telecom view on the approval of Recommendation G.9960
|
France Telecom Orange
|
Q4/15
|
2009-09-20 |
|
[ 661 ]
|
G.hn: Support of variable AIFG in G.hn
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 660 ]
|
G.hn: Proposed text modification for section 8.11 (Channel estimation protocol)
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 659 ]
|
G.hn: Update of the IFG-related text of 8.2, 8.3
|
Infineon Technologies AEG
|
Q4/15
|
2009-09-20 |
|
[ 658 ]
|
G.hn: Proposed text for TS grid synchronization recovery
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 657 ]
|
G.hn: Text updates for Acknowledgement Protocol operation
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 656 ]
|
G.hn: Transmission and reception window operation in Multicast traffic with Acks.
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 655 ]
|
G.hn: Flexible PHY-frame header extension
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 654 ]
|
G.hn: Updated proposal on topology discovery and routing calculation
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 653 ]
|
Proposal for RMAP Relaying
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 652 ]
|
Status of Support for Relays in G.hn
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 651 ]
|
Proposal for Registration via Relays
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 650 ]
|
Updated proposal for Neighbor Networks Support
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 649 ]
|
Adding FLOWID/PRIO field to ACK Frame Type
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 648 ]
|
Proposal for Authentication via Relays
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 647 ]
|
Bursting of ACK messages
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 646 ]
|
Extending DOMAIN_ID field to 6 bits
|
DS2
|
Q4/15
|
2009-09-20 |
|
[ 645 ]
|
G.hn: Proposal to update the text of section 8.9.2 (Multicast and broadcast transmission)
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 644 ]
|
Duplication in G.LT issues list
|
BT plc
|
Q4/15
|
2009-09-20 |
|
[ 643 ]
|
G.lt: New MELT-PMD Configuration Parameters
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 642 ]
|
G.inp: Example of transmit state machine for initialization
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 641 ]
|
G.inp: Modifications to section 9.6 of G.inp
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 640 ]
|
G.inp: Modifications to G.inp Annex A management plane commands
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 639 ]
|
G.inp: Topics missing in Retransmission Return Channel text of G.inp
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 638 ]
|
G.inp: Changes related to ReTX "Capability" and "Mode Select" in G.994.1 sections A.2.1-2,
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 637 ]
|
G.inp: On ETR and Retransmission Overhead
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 636 ]
|
G.inp: Test to estimate the MTBE for G.inp
|
Infineon Technologies
|
Q4/15
|
2009-09-20 |
|
[ 634 ]
|
G.gen: G.vector: G.vdsl: G.hs: Operation of a legacy G.993.2 VTU-R in a vectoring group
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2009-09-20 |
|
[ 633 ]
|
G.vector: VLAN identifier for L2 backchannel
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2009-09-20 |
|
[ 632 ]
|
G.inp: On defining the BER / MTBE working point in retransmission
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2009-09-20 |
|
[ 631 ]
|
G.vector: Periodicity for frequency dependent pilot sequences
|
Alcatel-Lucent Bell N.V.
|
Q4/15
|
2009-09-20 |
Results:117 total items. Result page:
1 -
2 -
3
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):