International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2009-09-28 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2009-09-28) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2009-09-28 to 2009-10-09

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-05-15  2008-12-01 

Results:117 total items.
Result page:  1 - 2 - 3  - Next Next
Contributions  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 747 ]  
 
Analysis of Last Call Comments     Panasonic Corporation   Q4/15   2009-09-24
[ 746 ]  
 
Proposal for 'black box recorder' functionality for VDSL     BT plc   Q4/15   2009-09-22
[ 739 ]  
 
G.hn: The "additional channel estimation symbol" as an optional symbol     CopperGate Communications   Q4/15   2009-09-21
[ 738 ]  
 
G.hn: clarification to the text describing transmission of the "extended PHY frame header"     CopperGate Communications   Q4/15   2009-09-21
[ 737 ]  
 
G.hn: reserving some of the "Reserved by ITU-T" bits in the PHY frame header for vendor specific usage     CopperGate Communications   Q4/15   2009-09-21
[ 736 ]  
 
G.hn: PHY frame header - Size of the Duration field and frame-type specific fields re-ordering     CopperGate Communications   Q4/15   2009-09-21
[ 735 ]  
 
G.hn: Extended-detection STXOP indicator in the TXOP descriptor     CopperGate Communications   Q4/15   2009-09-21
[ 734 ]  
 
G.hn: Time-Slot Size for INUSE and PR signals     CopperGate Communications   Q4/15   2009-09-21
[ 733 ]  
 
G.hn: Support for G.hn related Recommendations     CopperGate Communications   Q4/15   2009-09-21
[ 732 ]  
 
CBTS closure cases without INUSE signal     CopperGate Communications   Q4/15   2009-09-21
[ 731 ]  
 
CBTS closure cases with INUSE signal     CopperGate Communications   Q4/15   2009-09-21
[ 730 ]  
 
Updates for the text describing media access in CBTS     CopperGate Communications   Q4/15   2009-09-21
[ 729 ]  
 
G.hn: Proposal for CYCLE_MIN and CYCLE_MAX in 09CC-R12R1, "G.hn: Draft text for G.hn"     CopperGate Communications   Q4/15   2009-09-21
[ 728 ]  
 
G.hn: Proposal for TX_ON and TS_DURATION in 09CC-R12R1, "G.hn: Draft text for G.hn"     CopperGate Communications , DS2 , Gigle Semiconductor   Q4/15   2009-09-21
[ 727 ]  
 
G.hn: Proposal for TIFG_MIN in 09CC-R12R1, "G.hn: Draft text for G.hn"     CopperGate Communications , DS2 , Gigle Semiconductor   Q4/15   2009-09-21
[ 726 ]  
 
TS grid synchronization loss detection and recovery     CopperGate Communications   Q4/15   2009-09-21
[ 712 ]  
 
G.vector: Proposed way forward on the issue of FDM pilots     Huawei Technologies , MII   Q4/15   2009-09-20
[ 711 ]  
 
G.vector: On Error Sample Quantization Format     Huawei Technologies , MII   Q4/15   2009-09-20
[ 710 ]  
 
G.vector: Line Stability after a Disorderly Leaving Event     Huawei Technologies , MII   Q4/15   2009-09-20
[ 669 ]  
 
France Telecom view on the approval of Recommendation G.9960     France Telecom Orange   Q4/15   2009-09-20
[ 661 ]  
 
G.hn: Support of variable AIFG in G.hn     DS2   Q4/15   2009-09-20
[ 660 ]  
 
G.hn: Proposed text modification for section 8.11 (Channel estimation protocol)     DS2   Q4/15   2009-09-20
[ 659 ]  
 
G.hn: Update of the IFG-related text of 8.2, 8.3     Infineon Technologies AEG   Q4/15   2009-09-20
[ 658 ]  
 
G.hn: Proposed text for TS grid synchronization recovery     DS2   Q4/15   2009-09-20
[ 657 ]  
 
G.hn: Text updates for Acknowledgement Protocol operation     DS2   Q4/15   2009-09-20
[ 656 ]  
 
G.hn: Transmission and reception window operation in Multicast traffic with Acks.     DS2   Q4/15   2009-09-20
[ 655 ]  
 
G.hn: Flexible PHY-frame header extension     DS2   Q4/15   2009-09-20
[ 654 ]  
 
G.hn: Updated proposal on topology discovery and routing calculation     DS2   Q4/15   2009-09-20
[ 653 ]  
 
Proposal for RMAP Relaying     DS2   Q4/15   2009-09-20
[ 652 ]  
 
Status of Support for Relays in G.hn     DS2   Q4/15   2009-09-20
[ 651 ]  
 
Proposal for Registration via Relays     DS2   Q4/15   2009-09-20
[ 650 ]  
 
Updated proposal for Neighbor Networks Support     DS2   Q4/15   2009-09-20
[ 649 ]  
 
Adding FLOWID/PRIO field to ACK Frame Type     DS2   Q4/15   2009-09-20
[ 648 ]  
 
Proposal for Authentication via Relays     DS2   Q4/15   2009-09-20
[ 647 ]  
 
Bursting of ACK messages     DS2   Q4/15   2009-09-20
[ 646 ]  
 
Extending DOMAIN_ID field to 6 bits     DS2   Q4/15   2009-09-20
[ 645 ]  
 
G.hn: Proposal to update the text of section 8.9.2 (Multicast and broadcast transmission)     Infineon Technologies   Q4/15   2009-09-20
[ 644 ]  
 
Duplication in G.LT issues list     BT plc   Q4/15   2009-09-20
[ 643 ]  
 
G.lt: New MELT-PMD Configuration Parameters     Infineon Technologies   Q4/15   2009-09-20
[ 642 ]  
 
G.inp: Example of transmit state machine for initialization     Infineon Technologies   Q4/15   2009-09-20
[ 641 ]  
 
G.inp: Modifications to section 9.6 of G.inp     Infineon Technologies   Q4/15   2009-09-20
[ 640 ]  
 
G.inp: Modifications to G.inp Annex A management plane commands     Infineon Technologies   Q4/15   2009-09-20
[ 639 ]  
 
G.inp: Topics missing in Retransmission Return Channel text of G.inp     Infineon Technologies   Q4/15   2009-09-20
[ 638 ]  
 
G.inp: Changes related to ReTX "Capability" and "Mode Select" in G.994.1 sections A.2.1-2,     Infineon Technologies   Q4/15   2009-09-20
[ 637 ]  
 
G.inp: On ETR and Retransmission Overhead     Infineon Technologies   Q4/15   2009-09-20
[ 636 ]  
 
G.inp: Test to estimate the MTBE for G.inp     Infineon Technologies   Q4/15   2009-09-20
[ 634 ]  
 
G.gen: G.vector: G.vdsl: G.hs: Operation of a legacy G.993.2 VTU-R in a vectoring group     Alcatel-Lucent Bell N.V.   Q4/15   2009-09-20
[ 633 ]  
 
G.vector: VLAN identifier for L2 backchannel     Alcatel-Lucent Bell N.V.   Q4/15   2009-09-20
[ 632 ]  
 
G.inp: On defining the BER / MTBE working point in retransmission     Alcatel-Lucent Bell N.V.   Q4/15   2009-09-20
[ 631 ]  
 
G.vector: Periodicity for frequency dependent pilot sequences     Alcatel-Lucent Bell N.V.   Q4/15   2009-09-20
Results:117 total items.
Result page:  1 - 2 - 3  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-6-16