International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2008-12-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2008-12-01) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2008-12-01 to 2008-12-12

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15 

Results:20 total items.
Contributions  [ AI/Question: Q2/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 336 ]  
 
G.984.4 Implementer's Guide     Huawei Technologies Co.,Ltd.   Q2/15   2008-11-26
[ 298 ]  
 
Clarifications on Key Management in GPON System     ZTE Corporation   Q2/15   2008-11-23
[ 254 ]  
 
Solution of fast GPON switching in long-reach PON scenario     Huawei technologies   Q2/15   2008-11-21
[ 253 ]  
 
Proposal to support phase synchronization in GPON system     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 252 ]  
 
Proposal to support ONT survival time attribute in G.984.4     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 251 ]  
 
Proposal on Continuous Mode of LR-PON     Huawei Technologies Co., Ltd. RAD Data communicati   Q2/15   2008-11-21
[ 225 ]  
 
Proposal of control plane protocol stack in G.984.1     MII China   Q2/15   2008-11-21
[ 173 ]  
 
On the need to distribute accurate phase/Time-of-Day over xPON networks     RAD Data Communications, Huawei   Q2/15, Q13/15   2008-11-21
[ 134 ]  
 
Solution of fast GPON switching in long-reach PON scenario     Huawei technologies   Q2/15   2008-11-20
[ 133 ]  
 
Proposal to support phase synchronization in GPON system     Huawei technologies Co., LTD   Q2/15   2008-11-20
[ 132 ]  
 
Proposal to support ONT survival time attribute in G.984.4     Huawei technologies Co., LTD   Q2/15   2008-11-20
[ 131 ]  
 
Proposal on Continuous Mode of LR-PON     Huawei Technologies Co., Ltd. RAD Data communication Ltd.   Q2/15   2008-11-20
[ 129 ]  
 
Proposal for PON splitter specifications in G.671 revision     NTT   Q7/15, Q2/15   2008-11-20
[ 77 ]  
 
Proposal for clarifying downstream priority queues     ADTRAN   Q2/15   2008-11-19
[ 68 ]  
 
Specifications proposal to G.gbe     NEC, Fujitsu, NTT   Q2/15   2008-11-19
[ 67 ]  
 
Liaison statement proposal on G.gbe     NEC, Fujitsu   Q2/15   2008-11-19
[ 66 ]  
 
Comments on the Software image download in G.984.4 Revised 2008-Am2     Hitachi   Q2/15   2008-11-19
[ 47 ]  
 
PON splitter values     Corning Incorporated   Q7/15, Q2/15   2008-11-18
[ 46 ]  
 
PON splitter values - Change to wavelength range     Corning Incorporated   Q7/15, Q2/15   2008-11-18
[ 19 ]  
 
Editorial Comments for Draft 1.0 for G.gbe     Nortel Networks (Canada)   Q2/15   2008-11-17
Results:20 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-25