International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2008-12-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2008-12-01) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2008-12-01 to 2008-12-12

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15 

Results:338 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 288 ]  
 
Proposals on optical attenuator parameters in G.671     ZTE Corporation, China   Q7/15   2008-11-23
[ 287 ]  
 
Proposal on PDL and PMD parameters in G.671     ZTE Corporation, China   Q7/15   2008-11-23
[ 286 ]  
 
Proposals to Add Coordination Between Source and Destination to section 6.2 of G.7713     ZTE Corporation   Q14/15   2008-11-23
[ 285 ]  
 
Comments to G.8152     ZTE Corporation   Q14/15   2008-11-23
[ 284 ]  
 
Comments to G.8052     ZTE Corporation   Q14/15   2008-11-23
[ 283 ]  
 
Add "central frequency deviation" parameter for transmitter in G.698.2     ZTE   Q6/15   2008-11-23
[ 282 ]  
 
G.lt: Time-varying interference measurement and characterisation     BT   Q4/15   2008-11-23
[ 281 ]  
 
G.hn: Proposal for maximum wideband transmit power     Infineon Technologies AG   Q4/15   2008-11-23
[ 280 ]  
 
G.hn: Proposal for text describing G.hn threat model     Infineon Technologies AG   Q4/15   2008-11-23
[ 279 ]  
 
G.8032 protection switching transient traffic performance requirement for next study period     ETRI (Republic of Korea)   Q9/15   2008-11-23
[ 278 ]  
 
FDB-delete scheme for fast protection switching in G.8032 Ethernet ring protection     ETRI (Korea, Republic of)   Q9/15   2008-11-23
[ 277 ]  
 
Creation of a new TLV in ESMC channel in order to transport frequency stability level information     France Télécom, Tellabs   Q13/15   2008-11-23
[ 276 ]  
 
Proposed text for drafting of PTPv2 telecom profile frequency-oriented     France Télécom, Tellabs   Q13/15   2008-11-23
[ 275 ]  
 
Discussion about the use of "Announce" and "Management" messages for PTPv2 telecom profile frequency-oriented     France Télécom, Tellabs   Q13/15   2008-11-23
[ 274 ]  
 
Standards for 112 Gbit/s serial transmission     Telecom Italia   Q6/15   2008-11-23
[ 273 ]  
 
Study items for Q6/15     Italy   Q6/15   2008-11-23
[ 272 ]  
 
Naming Considerations regarding T-MPLS and MPLS-TP within ITU-T     Alcatel-Lucent Italia, Alcatel Shanghai Bell, Ital   Q9/15, Q3/15, Q11/15   2008-11-23
[ 271 ]  
 
Restoration exercise     ZTE Corporation   Q14/15, Q12/15   2008-11-23
[ 270 ]  
 
Document withdrawn (See C89)     Italy   Q6/15   2008-11-23
[ 269 ]  
 
G.hn: Profiles     CopperGate Communications   Q4/15   2008-11-21
[ 268 ]  
 
G.hn: Proposal for fixed window setting     Infineon Technologies AG   Q4/15   2008-11-21
[ 267 ]  
 
G.hn: Proposal to associate EVM values with the transmit power levels     Infineon Technologies AG, DS2   Q4/15   2008-11-21
[ 266 ]  
 
Withdrawn     N/A     1753-01-01
[ 265 ]  
 
G.vector: Proposal for a frequency division multiplexing scheme for pilot sequences and sync-flags     Alcatel-Lucent Bell N.V.   Q4/15   2008-11-21
[ 264 ]  
 
G.lt: Update to SELT-P draft text     Alcatel-Lucent Bell N.V.   Q4/15   2008-11-21
[ 263 ]  
 
Ghn: PLC Passband OFDM Parameters Proposal     Gigle Semiconductor   Q4/15   2008-11-21
[ 262 ]  
 
G.INP: Further Details on Error Monitoring, OAM and Traffic Differentiation with the Unified Retransmission Method     Infineon Technologies AG   Q4/15   2008-11-21
[ 261 ]  
 
G.hn: Proposal to use a single indexing rule     Infineon Technologies AG   Q4/15   2008-11-21
[ 260 ]  
 
Proposal to specify Failure of Protocol defects for the R-APS protocol     Lucent Technologies, Inc - AimValley BV   Q9/15   2008-11-21
[ 259 ]  
 
G.hn: Proposal for a multi-mode FEC scheme     France Telecom, Spidcom Technologies, Gigle Semico   Q4/15   2008-11-21
[ 258 ]  
 
G.inp: Limitations of the PMS-TC Retransmisssion Scheme     Infineon Technologies AG   Q4/15   2008-11-21
[ 257 ]  
 
Proposed change in Draft Annex to G.709 for transcoding via 512B/513B     NTT   Q11/15   2008-11-21
[ 256 ]  
 
Notification of IPR statement submission     DS2   Q4/15   2008-11-21
[ 255 ]  
 
G.lt: Communications Channel Extension for Measurement Data Retrieval     BT   Q4/15   2008-11-21
[ 254 ]  
 
Solution of fast GPON switching in long-reach PON scenario     Huawei technologies   Q2/15   2008-11-21
[ 253 ]  
 
Proposal to support phase synchronization in GPON system     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 252 ]  
 
Proposal to support ONT survival time attribute in G.984.4     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 251 ]  
 
Proposal on Continuous Mode of LR-PON     Huawei Technologies Co., Ltd. RAD Data communicati   Q2/15   2008-11-21
[ 250 ]  
 
Proposed text for ODU3ye/OTU3ye in supplement     Japan   Q11/15   2008-11-21
[ 249 ]  
 
Corrigendum for G.709 correcting small mistake and inconsistency with G.798     Alcatel Lucent Germany   Q9/15, Q11/15   2008-11-21
[ 248 ]  
 
Ghn: EVM Requirements Proposal     Gigle Semiconductor   Q4/15   2008-11-21
[ 247 ]  
 
Proposal to include additional PMD-related parameters in the 40G and 100G modulation format comparison documents     Deutsche Telekom   Q7/15, Q6/15   2008-11-21
[ 246 ]  
 
G.lt: Proposal for modifications to the "Loop Topology with cable-type identification" table in SELT     Ericsson AB   Q4/15   2008-11-21
[ 245 ]  
 
Consideration of OTU4 FEC requirements     Alcatel Lucent   Q11/15   2008-11-21
[ 244 ]  
 
Proposal for adding timing transparency to GFP (G.7041) mapping and its variant as given in G.Sup43 Clause 7.3 for 10GBase-R     Alcatel - Lucent Germany   Q11/15   2008-11-21
[ 243 ]  
 
Considerations about Implementation friendly justification procressing of mapping of data into ODU4     Alcatel - Lucent Germany   Q11/15   2008-11-21
[ 242 ]  
 
G.hn: Compression formats for the Ack message     DS2   Q4/15   2008-11-21
[ 241 ]  
 
G.hn: Re-synchronization in STXOPs with CFTS     DS2   Q4/15   2008-11-21
[ 240 ]  
 
G.hn: Preamble windowing in PLC     DS2   Q4/15   2008-11-21
[ 239 ]  
 
Additional PM Objects for EoT NE Information Model G.8052     Deutsche Telekom and Alcatel-Lucent   Q14/15   2008-11-21
Results:338 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-9-24