International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-09-02 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-09-02) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-09-02 to 2009-09-12

held in Argentina [Mar del Plata]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-05-22  2009-01-12 

Results:256 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 433 ]  
 
Solving editors notes on manageable P2P functions in Y.iptv-netcontrol-fw     Huawei Technologies Co., Ltd.   Q3/13   2009-08-27
[ 432 ]  
 
Proposed modifications to clause 6 of draft Y.ipv6na     Huawei Technologies CO., LTD.   Q7/13   2009-08-27
[ 431 ]  
 
Proposed modifications to clause 6 of draft Y.ipv6migration     Huawei Technologies CO., LTD.   Q7/13   2009-08-27
[ 430 ]  
 
Proposed modification for sub-clause 6.3.2 and 6.4 of Y.PTDN     Huawei Technologies Co., Ltd   Q20/13   2009-08-27
[ 429 ]  
 
Proposed baseline text of draft recommendation for iSCP requirements     Huawei Technologies Co., Ltd   Q20/13   2009-08-27
[ 428 ]  
 
Proposed baseline text of draft recommendation for iSCP architecture     Huawei Technologies Co., Ltd   Q20/13   2009-08-27
[ 427 ]  
 
Proposed modification for sub-clause clause7.3 of Y.PTDN     Huawei Technologies Co., Ltd   Q20/13   2009-08-27
[ 426 ]  
 
Proposed editorial changes to Y.IPTV-TM     Huawei Technologies CO., Ltd.   Q4/13   2009-08-27
[ 425 ]  
 
Proposal for security considerations to Y.IPTV-TM     Huawei Technologies CO., Ltd.   Q4/13   2009-08-27
[ 424 ]  
 
Proposal for revise virtual connection use case in Y.MC-SCEN     Huawei Technologies CO., Ltd.   Q9/13   2009-08-27
[ 423 ]  
 
Proposal for requirement of separated authorization and accounting for multi-connection     Huawei Technologies CO., Ltd.   Q9/13   2009-08-27
[ 422 ]  
 
Proposal for remove media transfer use case in Y.MC-SCEN     Huawei Technologies CO., Ltd.   Q9/13   2009-08-27
[ 421 ]  
 
Proposal for QoS Routing to section 6 of Y.IPTV-TM     Huawei Technologies CO., Ltd.   Q4/13   2009-08-27
[ 420 ]  
 
Proposal for new sub-clause for use case in Y.MC-SCEN     Huawei Technologies CO., Ltd.   Q9/13   2009-08-27
[ 419 ]  
(Rev.1) 
Proposal for Interaction between different functions in section 7 of Y.IPTV-TM     Huawei Technologies CO., Ltd.   Q4/13   2009-08-27
[ 418 ]  
 
Proposal for detailed explanations of the 5th multi-connection generic scenario in Y.MC-SCEN     Huawei Technologies CO., Ltd.   Q9/13   2009-08-27
[ 417 ]  
 
Proposal for detailed explanations text of security consideration in Y.MC-REQ     Huawei Technologies CO., Ltd.   Q9/13   2009-08-27
[ 416 ]  
 
Proposed modification for Y.dsnscen about the "multimedia telephony service"     Huawei Technologies CO., Ltd.   Q19/13   2009-08-27
[ 415 ]  
 
Proposal to add requirement "Compatibility" to the chapter 6 of Y.dsnreq     Huawei Technologies CO., Ltd.   Q19/13   2009-08-27
[ 414 ]  
 
Some editor changes to Y.dsnreq     Huawei Technologies CO., Ltd.   Q19/13   2009-08-27
[ 413 ]  
 
Proposed modification of 6.1.3 load balance in Y.dsnreq     Huawei Technologies CO., Ltd.   Q19/13   2009-08-27
[ 412 ]  
 
Proposed modification of 6.2.6 distributed storage in Y.dsnreq     Huawei Technologies CO., Ltd.   Q19/13   2009-08-27
[ 411 ]  
 
Proposed modification for Y.dsnscen about the "service availability and reliability" and "load balance"     Huawei Technologies CO., Ltd.   Q19/13   2009-08-27
[ 410 ]  
 
Proposed modifications for Y. dsnscen about content sharing service     China Mobile   Q19/13   2009-08-26
[ 409 ]  
 
Proposed modifications for Y.dsnreq "Recommendation on DSN requirements" about the security requirements     China Mobile   Q19/13   2009-08-26
[ 408 ]  
 
Proposed modifications for Y.dsnreq "Recommendation on DSN requirements" about the dynamic resource scheduling     China Mobile   Q19/13   2009-08-26
[ 407 ]  
 
Proposal to add "fault tolerance" to the chapter 6 "Requirements for DSN" to Y.dsnreq "Recommendation on DSN requirements"     China Mobile   Q19/13   2009-08-26
[ 406 ]  
 
Proposal for reorganizing the Y.MC-REQ     China Mobile   Q9/13   2009-08-26
[ 405 ]  
 
Proposal for modifying the figure of scenarios in Y.MC-SCEN     China Mobile   Q9/13   2009-08-26
[ 404 ]  
 
Proposal for modification of skeleton in the Y.MC-ARCH     China Mobile   Q9/13   2009-08-26
[ 403 ]  
 
Proposal for improving the requirement of multi-connection registration in the Y.MC-REQ     China Mobile   Q9/13   2009-08-26
[ 402 ]  
 
Proposal for improving the requirement of connection management in the Y.MC-REQ.doc     China Mobile   Q9/13   2009-08-26
[ 401 ]  
 
Proposal for improving the general principle of scenarios in Y.MC-SCEN     China Mobile   Q9/13   2009-08-26
[ 400 ]  
 
Proposal of an Annex of Y.2111 Revision2 relevant to the communication between RACF and MPM     KDDI Corporation (KDDI R&D Laboratories)   Q4/13   2009-08-26
[ 399 ]  
 
Proposal of an Appendix of Y.2111 Revision2 relevant to the use cases based on the RACF-MPM communications     KDDI Corporation (KDDI R&D Laboratories)   Q4/13   2009-08-26
[ 398 ]  
 
Proposal of an Appendix of Y.2111 Revision2 relevant to the comparison of specifications of the reference points between Rc and Rm in RACF     KDDI Corporation (KDDI R&D Laboratories)   Q4/13   2009-08-26
[ 397 ]  
 
Proposal of an Appendix of Y.2111 Revision2 relevant to the performance notification between RACF and MPM based on the communications of multiple MPM functions     KDDI Corporation (KDDI R & D Laboratories)   Q4/13   2009-08-26
[ 396 ]  
 
Proposal of the revision of the generic resource and admission control functional architecture in Y.2111 Revision2     KDDI Corporation (KDDI R&D Laboratories)   Q4/13   2009-08-26
[ 395 ]  
 
Proposed Modification to Y.SecMechanisms.     Telcordia Technologies , AT&T   Q16/13   2009-08-26
[ 394 ]  
 
Addition of information components exchanged over Rs, Rt and Rp reference points for multicast scenario in Y.RACF Revision 2     KDDI Corporation   Q4/13   2009-08-26
[ 393 ]  
 
Modification of description about resource control scenarios for multicast in Y.RACF Revision 2     KDDI Corporation   Q4/13   2009-08-26
[ 392 ]  
 
Proposed a comparative table for Y.OSE-arch     ETRI   Q5/13   2009-08-26
[ 391 ]  
 
Proposal for updating texts on clause 8 in Y.OSE-arch     ETRI   Q5/13   2009-08-26
[ 390 ]  
 
Proposal for updating texts on Y.OSE-arch     ETRI   Q5/13   2009-08-26
[ 389 ]  
 
Restructuring inter-operator end-to-end resource control scenarios     KDDI Corporation   Q4/13   2009-08-26
[ 388 ]  
 
Restructuring resource control scenarios for wholesale     KDDI Corporation   Q4/13   2009-08-26
[ 387 ]  
 
Restructuring resource control scenarios for nomadicity     KDDI Corporation   Q4/13   2009-08-26
[ 386 ]  
 
Proposal for design principle for ID/Loc separation architecture of Y.FAid-loc-split"     ETRI   Q5/13   2009-08-26
[ 385 ]  
 
Proposal for revised draft Recommendation on "Identification and configuration of resources for Multi-Connection (Y.MC-ID)"     ETRI   Q9/13   2009-08-26
[ 384 ]  
 
Suggestion of Text for Introduction in Draft Recommendation Y.MM-WAU     ETRI   Q8/13   2009-08-26
Results:256 total items.
Result page:  1 - 2 - 3 - 4 - 5 - 6  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19