International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-01-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-01-12) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-01-12 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Results:176 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 176 ]  
 
Revised Text of Y.ngn-vpn     ETRI   Q3/13   2009-01-08
[ 175 ]  
 
Proposed modifications to clauses 7.2.2 and 7.2.3 of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-08
[ 174 ]  
 
Proposal on Service Overlay Networking Architecture for Distributed Service Control     ETRI   Q19/13   2009-01-07
[ 173 ]  
 
Proposed A Revised Input Text for Y.ngn-account-R2     ETRI   Q3/13   2009-01-07
[ 172 ]  
 
Proposed Revised and Additional Requirements in Y.ngn-account-R2     ETRI   Q3/13   2009-01-07
[ 171 ]  
 
Revised draft Recommendation on "Framework of ID/LOC separation in IPv6-based NGN(Y.ipv6split)     ETRI (Republic of Korea)   Q7/13   2009-01-07
[ 170 ]  
 
Proposal for update texts to deployment Scenarios for ID/LOC separation in IPv6-based NGN of Y.ipv6split     ETRI(Republic of Korea)   Q7/13   2009-01-07
[ 169 ]  
 
Output of Draft Recommendation Y.NGN-MCC, NGN Service Requirements to Support MCC services     ZTE corporation   Q3/13   2009-01-07
[ 168 ]  
 
Enhancement for clause 9.4 of FRA r2     ZTE Corporation   Q5/13   2009-01-07
[ 167 ]  
 
Proposal for the common field of PTDN network packet format in connectionless mode     ZTE Corporation   Q20/13   2009-01-07
[ 166 ]  
 
Distributed Technology and Telecommunication Network     ZTE Corporation, China   Q19/13   2009-01-07
[ 165 ]  
 
Modification in CMR Converged Functional Models     ZTE Corporation   Q5/13, Q3/13, Q14/13   2009-01-07
[ 164 ]  
 
The editorial modification for the Y.racf     ZTE Corporation   Q4/13   2009-01-07
[ 163 ]  
 
Modification in CMR functional models in call server and IMS based environment     ZTE Corporation   Q5/13, Q3/13, Q14/13   2009-01-07
[ 162 ]  
 
Modification in CMR clause 7     ZTE Corporation   Q5/13, Q3/13, Q14/13   2009-01-07
[ 161 ]  
 
Proposal for Architecture model of mobility security framework in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 160 ]  
 
Proposal for full authentication in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 159 ]  
 
Proposal for security countermeasure between HDF and UE     ZTE Corporation   Q5/13   2009-01-07
[ 158 ]  
 
Proposal for security between UE and HDF in Y.mobsec     ZTE Corporation   Q16/13   2009-01-07
[ 157 ]  
 
Proposal for re-authentication in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 156 ]  
 
Proposal for new work item of Mobility Security Framework in NGN     ZTE Corporation   Q16/13   2009-01-07
[ 155 ]  
 
Proposal for IP mobility security in Y.mobSec     ZTE Corporation   Q16/13   2009-01-07
[ 154 ]  
 
Proposed to add the wholesale scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 153 ]  
 
Proposed to add the nomadicity scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 152 ]  
 
Proposed to add the CPN control for the wholesale scenario in Y.RACF     ZTE Corporation   Q4/13   2009-01-07
[ 151 ]  
 
Proposed to add an information component in Rh reference point     China Telecom, ZTE Corporation   Q4/13   2009-01-07
[ 150 ]  
 
Proposal to do add new definition, References and Abbreviations and acronyms of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 149 ]  
 
Proposal for the information flow of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 148 ]  
 
Proposal for the id-loc-split-based multihoming of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 147 ]  
 
Proposal for the id-loc-split-based mobility of the Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 146 ]  
 
Proposal for the architecture model of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 145 ]  
 
Proposal for add the contents of the appendix to the body of Y.FAid-loc-split     ZTE Corporation   Q5/13   2009-01-07
[ 144 ]  
 
Proposed Initial Text for ITU-T Supplement "Evaluation of Existing Signaling Protocol Extensions to Support Y.2171 Admission Control Priority Levels"     AT&T and Telcordia   Q4/13   2009-01-07
[ 143 ]  
 
Proposed changes to sub-clause 9.3.2 of Y.iptv-control-fw     Huawei Technologies Co., Ltd.   Q3/13   2009-01-07
[ 142 ]  
 
Proposal to initiate a work item to study DSN requirements     Huawei Technologies Co., Ltd.   Q19/13   2009-01-07
[ 141 ]  
 
Proposed replacement for sub-clauses 7.2.1 and 7.2.2 of draft Y.PTDN     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 140 ]  
 
Proposed text of draft recommendation for iSCP scenarios     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 139 ]  
 
Proposed baseline text of draft recommendation for iSCP requirements     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 138 ]  
 
Proposal for additional text on routing optimization consideration for handover     China Mobile, Huawei Technologies Co. Ltd   Q5/13   2009-01-07
[ 137 ]  
 
Proposal for adding VPN identifier and VPN numbering fields in the header of the network layer user packet     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 136 ]  
 
Proposal to extend fields of the network layer data packet header.     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 135 ]  
 
Proposal for adding multicast identifier field in the header of the network layer data packet     Huawei Technologies Co., Ltd   Q20/13   2009-01-07
[ 134 ]  
 
The authentication architecture and requirements to provide mobility in NGN     Korea (Republic of)   Q16/13   2009-01-07
[ 133 ]  
 
Some modifications to the scenarios and flows of Y.MMCF     China Mobile, Huawei Technologies Co., Ltd.   Q5/13   2009-01-07
[ 132 ]  
 
Proposed text for Draft Recommendation on IPv6 Evolvement in NGN     Huawei Technologies CO., LTD.   Q7/13   2009-01-07
[ 131 ]  
 
Proposed Draft Recommendation on prefix and address management for network access in IPv6-based NGN     Huawei Technologies Co., LTD.   Q7/13   2009-01-07
[ 130 ]  
 
Proposal to initiate a work item for IPv6 evolvement in NGN     Huawei Technologies Co., LTD.   Q7/13   2009-01-07
[ 129 ]  
 
Proposed text for sub-clauses 8.4.1 and 8.4.2 of draft Recommendation Y.ngnIdMreq     Huawei Technologies Co., Ltd.   Q16/13   2009-01-07
[ 128 ]  
 
Proposed text for Authentication and Pseudonym Management clauses of draft Y.idmMechanisms     Huawei Technologies Co.,Ltd.   Q16/13   2009-01-07
[ 127 ]  
 
Proposed draft text for DSN requirements     Huawei Technologies Co., Ltd.   Q19/13   2009-01-07
Results:176 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-19