International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 12 : Meeting 2009-03-10 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 12  TD-WP3 (2009-03-10) 

ITU-T SG 12

Performance and quality of service

Study Period 2009

Meeting  from 2009-03-10 to 2009-03-19

held in Switzerland [Geneva]

Other Meetings : 2012-09-07  2012-05-29  2011-10-31  2011-01-18  2010-09-17  2010-05-18  2009-11-03  [ 2009-03-10 ] 

Results:14 total items.
Temporary Documents  (WP3)  [ AI/Question: Q17/12 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 30-WP3 ]  
 
Proposed Y.1540 Appendix VIII: IP-layer capacity framework     Editor   Q17/12   2009-03-12
[ 28-WP3 ]  
 
Packet/Frame Performance Objectives: Review and Proposals     Rapporteur Q17/12   Q17/12   2009-03-11
[ 27-WP3 ]  
(Rev.1-3) 
Report of Q17 Meeting and Status     Rapporteur Q17/12   Q17/12   2009-03-11
[ 23-WP3 ]  
 
Incoming LS: Liaison to ITU-T Q17/12, Q10/15 from the MEF Delivered throughput project     MEF   Q17/12   2009-03-09
[ 17-WP3 ]  
 
Incoming LS: Request for Consideration of Contribution T09-SG13-C-0011     ITU-T SG13   Q17/12   2009-02-13
[ 16-WP3 ]  
 
Incoming LS: Draft Recommendation Y.FAinX, "Requirements for Flow Aggregate Information Exchange in NGN"     ITU-T SG13   Q17/12, Q11/12   2009-02-13
[ 13-WP3 ]  
 
Incoming LS: Establishment of Focus Group on Future Networks (FG-FN)     Chairman of SG13   Q17/12, Q13/12, Q11/12   2009-02-13
[ 12-WP3 ]  
 
Report of Question 17 Interim Meeting and Status     Rapporteur Q17/12   Q17/12   2009-02-09
[ 11-WP3 ]  
 
Incoming LS: Objectives for Quality related Parameters at VoIP Interconnection Points     ITU-T Study Group 11   Q17/12   2009-02-03
[ 9-WP3 ]  
 
Incoming LS: Response to liaison from Q17/12 (TD-329 (WP1/15))     ITU-T SG15   Q17/12   2009-01-22
[ 5-WP3 ]  
 
Incoming LS: Liaison statement on "Performance and availability requirements and objectives for wireless access systems"     ITU-R WP5A   Q11/12, Q17/12   2008-12-16
[ 4-WP3 ]  
 
Incoming LS: Response to LS on requirements for flow aggregate information exchange     Q4/12 Rapporteur Group   Q17/12   2008-12-16
[ 3-WP3 ]  
 
Incoming LS: Draft Recommendation E.841 (formerly E.IPQoS)     ITU-T SG2   Q17/12, Q12/12, Q11/12   2008-12-16
[ 1-WP3 ]  
 
Draft agenda for Working Party 3/12 meeting     Chairman of Working Party 3/12   Q17/12, Q13/12, Q12/12, Q11/12, Q2/12   2008-12-16
Results:14 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2025-10-10