Français
Español
Home
:
ITU-T
:
SG 11
:
Reports
Recently posted
-
Search Meeting Documents
ITU-T SG 11 R
ITU-T SG 11
Max # of documents displayed/page:
Signalling requirements, protocols and test specifications
Study Period 2009
Results:
6
total items.
Reports
[ AI/Question: QALL/11 ]
Number
Title
Source
AI/Question
Filter...
Clear filter
Date
[ 43 ]
Report of the meeting of Study Group 11 (Geneva, 11-15 June 2012)
SG 11
QALL/11
2012-11-13
[ 38 ]
Report of the meeting of Study Group 11 (Geneva 17-21 October 2011)
SG 11
QALL/11
2012-02-08
[ 26 ]
Report of the meeting of SG 11 (Geneva, 24-28 January 2011)
SG 11
QALL/11
2011-02-23
[ 18 ]
Report of the meeting of Study Group 11 (Geneva, 26-30 April 2010)
SG 11
QALL/11
2010-05-27
[ 9 ]
Report of the Meeting of Study Group 11 (Mar del Plata, 2-10 September 2009)
SG 11
QALL/11
2009-10-22
[ 1 ]
Report of the Meeting of Study Group 11 (Geneva, 19-23 January 2009)
SG 11
QALL/11
2009-03-02
Results:
6
total items.
Multiple Document Download:
Check the boxes of the selected documents, then click "Zip and download"
User preferences:
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages
Yes
Formats
doc
pdf
zip
+ Other formats
Languages (maximum 2)
E
F
S
A
C
R
+ Multilingual
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Test ITU Translate for automated document translation
Top
-
Feedback
-
Contact Us
-
Copyright © ITU
2008 All Rights Reserved
Contact for this page :
TSB EDH
Updated : 2025-5-10