International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  C 

ITU-T SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Results:303 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 153 ]  
 
Proposed text to clause 6.2 of the draft Recommendation Q.NGN interoperability     NEC Corp.   Q9/11, Q8/11, Q12/11, Q10/11   2010-04-14
[ 152 ]  
 
Proposed text to clause 5.3 of the draft Recommendation Q.NGN interoperability     NEC Corp.   Q9/11, Q8/11, Q12/11, Q10/11   2010-04-14
[ 151 ]  
 
Proposed text to clause 5.2 of the draft Recommendation Q.NGN interoperability     NEC Corp.   Q9/11, Q8/11, Q12/11, Q10/11   2010-04-14
[ 150 ]  
 
Proposed modifications to clause 5.1 and 6.1 of the draft Recommendation Q.NGN interoperability     NEC Corp.   Q9/11, Q8/11, Q12/11, Q10/11   2010-04-14
[ 149 ]  
 
Proposed modifications to Clause 6.16.1 in Q.3323.2 (Rw H.248 version 2)     CATR, Huawei   Q5/11   2010-04-14
[ 148 ]  
 
Proposed definition and service description in Q.centrexSig     CATR   Q3/11   2010-04-14
[ 147 ]  
 
Proposed call flow for Communication Pickup in Q.centrexSig     CATR   Q3/11   2010-04-14
[ 146 ]  
 
Proposed new parameters added into chapter 11 of the draft Recommendation Q.3910.     CATR   Q9/11   2010-04-14
[ 145 ]  
 
Q.Flowstatesig State Diagrams     Anagran Inc.   Q5/11   2010-04-14
[ 144 ]  
 
Q.Flowstatesig Response to Open Items     Anagran Inc.   Q5/11   2010-04-14
[ 143 ]  
 
Important Benefits of Q.Flowstatesig     Anagran Inc.   Q5/11   2010-04-14
[ 142 ]  
 
Q.Flowstatesig Proposed Changes     Anagran Inc.   Q5/11   2010-04-14
[ 141 ]  
 
Clarification to Aggregate resource profile over Q.3302.1-RCIP     ZTE Corp.   Q5/11   2010-04-14
[ 140 ]  
 
Draft Recommendation ITU-T Q.3906 "The scenarios, list and types of tests for fixed Broadband NUT testing on the Model networks. Part I."     Russian Federation   Q8/11   2010-04-07
[ 139 ]  
 
Draft Recommendation ITU-T Q.3904 " The scenarios, list and types of tests for TM local and NUT testing for IMS on the Model networks "     Russian Federation   Q8/11   2010-04-07
[ 138 ]  
 
Proposal for authorization free indication over Rs     Russian Federation   Q5/11   2010-04-07
[ 137 ]  
 
Proposed update for Q.3324.2     NTT Corp.   Q5/11   2010-04-07
[ 136 ]  
 
Q.1912.5F Interworking between Session Initiation Protocol (SIP) and Bearer Independent Call Control Protocol (BICC) or ISDN User Part (ISUP);Part 5: Abstract Test Suite (ATS) and partial Protocol Implementation eXtra Information for Testing (PIXIT) for Profile C     Telekom Austria   Q8/11   2010-04-07
[ 135 ]  
 
Invitation to Approve TRQ.ETS Overview out of the April 2010 Meeting     Industry Canada   Q13/11   2010-03-31
[ 134 ]  
 
Proposed Summary Clause for Draft Supplement TRQ.priority     AT&T & Telcordia   Q13/11   2010-03-30
[ 133 ]  
 
Proposed Edits for Draft Supplement TRQ.priority     AT&T & Telcordia   Q13/11   2010-03-30
[ 132 ]  
 
Proposed Modifications to Clause 6.3 on Diameter Protocol in Draft TRQ.priority     Telcordia Technologies   Q13/11   2010-03-30
[ 131 ]  
 
Proposed additions to Q.flowstatesig, relating to Keywords, Sections 2,3 and 4, and Bibliography     Razoom Inc.   Q5/11   2009-08-27
[ 130 ]  
 
Proposed additions to Q.flowstatesig     Razoom Inc.   Q5/11   2009-08-27
[ 129 ]  
 
Proposed modified figures for Q.flowstatesig     Razoom Inc.   Q5/11   2009-08-27
[ 128 ]  
 
Proposal to add IWK definition in Q.ANCP     ZTE Corp.   Q5/11   2009-08-25
[ 127 ]  
 
Proposal to add bandwidth report message in Q.ANCP     ZTE Corp.   Q5/11   2009-08-25
[ 126 ]  
 
Proposal to add Aggregate resource profile over Q.3302.1-RCIP     ZTE Corp.   Q5/11   2009-08-25
[ 125 ]  
 
Rich Media Clarification (clause 5.1.4)     ZTE Corp.   Q3/11, Q2/11   2009-08-25
[ 124 ]  
 
Proposal of new clause data delivery mechanism to X.mmc-3     ETRI   Q15/11   2009-08-24
[ 123 ]  
 
Proposal of procedure flow for normal MMC-3 operation to be included in appendix of X.mmc-3     ETRI   Q15/11   2009-08-24
[ 122 ]  
 
NID architecture cases for development of the NID testing architecture     ETRI   Q12/11   2009-08-24
[ 121 ]  
 
Proposed text about Clause 9.3 and 9.4 on Q.nacp.Ng     ETRI   Q7/11   2009-08-24
[ 120 ]  
 
Proposed Text for New Clause 6.4 on Diameter Protocol for Draft ITU-T Supplement TRQ.priority     Telecordia Technologies   Q13/11   2009-08-24
[ 119 ]  
 
Proposed New Text for Section 8.7 of TRQ.ETS-Overview     Telecordia Technologies   Q13/11   2009-08-24
[ 118 ]  
 
Proposed New Text for Section 8.3.2 of TRQ.ETS-Overview     AT&T   Q13/11   2009-08-24
[ 117 ]  
 
Proposed editorial modifications for Q.iptvsa     China Telecom   Q1/11   2009-08-24
[ 116 ]  
 
Proposals for removing the description of some reference points in Q.iptvsa     China Telecom   Q1/11   2009-08-24
[ 115 ]  
 
Proposed signalling requirements for supporting the Communication Hold service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 114 ]  
 
Proposed signalling requirements for supporting the Communication Forwarding service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 113 ]  
 
Proposed signalling requirements for supporting the Communication Transfer service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 112 ]  
 
Proposed signalling requirements for supporting the Originating identification presentation service feature in Q.centrexSig     China Telecom   Q3/11, Q2/11   2009-08-24
[ 111 ]  
 
Proposed text added into the clause 6.5 of the draft Recommendation Q.3911     China Telecom   Q9/11   2009-08-24
[ 110 ]  
 
Proposed text added into the clause 6.4 of the draft Recommendation Q.3911     China Telecom   Q9/11   2009-08-24
[ 109 ]  
 
Proposed text added into the clause 6.3 of the draft Recommendation Q.3911     China Telecom   Q9/11   2009-08-24
[ 108 ]  
 
Proposed text added into the clause 6.2 of the draft Recommendation Q.3911     China Telecom   Q9/11   2009-08-24
[ 107 ]  
 
Proposed text added into the clause 10 of the draft Recommendation Q.3910     China Telecom   Q9/11   2009-08-24
[ 106 ]  
 
Proposed editorial modification to the draft Recommendation Q.3910     China Telecom   Q9/11   2009-08-24
[ 105 ]  
 
Required changes in the section 6 of Q.nacf.mob2     ETRI   Q7/11   2009-08-24
[ 104 ]  
 
Proposed interfaces of NACF for IP mobility     ETRI   Q7/11   2009-08-24
Results:303 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-06-12