International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2009-01-19 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  C (2009-01-19) 

ITU-T SG 11

Signalling requirements, protocols and test specifications

Study Period 2009

Meeting  from 2009-01-19 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-11  2012-02-17  2011-10-17  2011-05-20  2011-05-13  2011-01-24  2010-09-10  2010-04-26  2010-01-28  2009-09-02  2009-05-21 

Results:78 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 78 ]  
 
Proposed text for use cases in draft recommendation Q.nacp.Ng     ETRI   Q7/11   2009-01-09
[ 77 ]  
 
Update for Draft Q.3306     Telekomunikacja Polska (Poland)   Q5/11   2009-01-09
[ 76 ]  
 
Proposal for Definition of NGN Protocol Sets     ETRI   Q1/11   2009-01-09
[ 75 ]  
 
Discussion Paper: Introduction of circuit grouping in BICC and ISUP protocols     LM Ericsson   Q3/11   2009-01-09
[ 74 ]  
 
Proposed update for Q.3320     Telekomunikacja Polska (Poland)   Q5/11   2009-01-09
[ 73 ]  
 
Proposal to create new recommendation of the architectural framework for network attachment control signalling in NGN     ETRI   Q7/11   2009-01-09
[ 72 ]  
 
Proposed update of handbook appendix     Telekomunikacja Polska (Poland)   Q6/11   2009-01-09
[ 71 ]  
 
Proposed updates of handbook text     Telekomunikacja Polska (Poland)   Q6/11   2009-01-09
[ 70 ]  
 
Proposal of Amendment 2 of Recommendation ITU-T X.603.1 (2007)     ETRI   Q15/11   2009-01-09
[ 69 ]  
 
Proposal of technical corrigendum 1 to Recommendation ITU-T X.603.1 (2007)     ETRI   Q15/11   2009-01-09
[ 68 ]  
 
Proposal of new Clause 9. Parameters in X.mmc-3     ETRI   Q15/11   2009-01-09
[ 67 ]  
 
Proposed Modification of MMC-3 control messages in clause 8 of X.mmc-3     ETRI   Q15/11   2009-01-09
[ 66 ]  
 
Revised texts for draft recommendation Q.nacp.Ng     ETRI   Q7/11   2009-01-09
[ 65 ]  
 
Proposed Modification of MMC-3 control data in clause 8.4 of X.mmc-3     ETRI   Q15/11   2009-01-09
[ 64 ]  
 
Proposed Modification of X.rmcp-3(X.603.2 | ISO/IEC 16512-3) for second FCD     ETRI   Q15/11   2009-01-09
[ 63 ]  
 
Proposal for protocol messages in Q.nacp.Ru     ETRI   Q7/11   2009-01-09
[ 62 ]  
 
Proposal for Q.nacp.Ru recommendation     ETRI   Q7/11   2009-01-09
[ 61 ]  
 
Proposed baseline text for Q.3911 - "Monitoring parameters set for voice services in NGN"     China Telecom   Q9/11, Q8/11   2009-01-09
[ 60 ]  
 
Proposed baseline text for Q.3910 - "Monitoring parameters set for NGN protocols"     China Telecom   Q9/11, Q8/11   2009-01-09
[ 59 ]  
 
Proposal for add procedure description of original PD-PE in Ri interface     China Telecom   Q5/11   2009-01-09
[ 58 ]  
 
A proposal to delete bulk/collective reservation spec of Ri interface and add notes to Q.3307.1     China Telecom   Q5/11   2009-01-09
[ 57 ]  
 
Proposed signalling requirements for supporting the Incoming Communication service feature of IP Centrex     China Telecom   Q3/11   2009-01-09
[ 56 ]  
 
Proposed signaling requirements for supporting the Outgoing Communication service feature of IP Centrex     China Telecom   Q3/11   2009-01-09
[ 55 ]  
 
Proposed signalling requirements for supporting the Internal Communication service feature of IP Centrex     China Telecom   Q3/11   2009-01-09
[ 54 ]  
 
Proposed text for section 5.3 of 'The Signalling Requirements for IP Centrex service'     China Telecom   Q3/11   2009-01-09
[ 53 ]  
 
Proposed modifications for 'The Signalling Requirements for IP Centrex service'     China Telecom   Q3/11   2009-01-09
[ 52 ]  
 
Editorial changes on Q.CRBT     KT, ETRI   Q3/11, Q2/11   2009-01-09
[ 51 ]  
 
Proposed signalling architecture of mobility     China Mobile, Huawei Technologies Co., Ltd.   Q5/11   2009-01-09
[ 50 ]  
 
Proposed outline of a draft Recommendation for signalling architecture and signalling flows for mobility     China Mobile, Huawei Technologies Co., Ltd.   Q5/11   2009-01-09
[ 49 ]  
 
Proposed modifications to draft Q.PCNApp     Huawei Technologies Co., Ltd.   Q5/11   2009-01-09
[ 48 ]  
 
Modifications to the admission control coordination models     British Telecom, Huawei Technologies Co., Ltd.   Q5/11   2009-01-09
[ 47 ]  
 
Proposed modifications to draft Q.CRT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2009-01-09
[ 46 ]  
 
Proposed modifications to draft Q.CRBT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2009-01-09
[ 45 ]  
 
Proposed modification to Interaction between networks of draft Q.CRBT     Huawei Technologies Co., Ltd.   Q3/11, Q2/11   2009-01-09
[ 44 ]  
 
Proposed additions to draft Recommendation Q.CRT     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2009-01-09
[ 43 ]  
 
Proposed additions to draft Recommendation Q.CRBT     Huawei Technologies Co.,Ltd.   Q3/11, Q2/11   2009-01-09
[ 42 ]  
 
Definition of Multimedia CAT Capability Indicator to BICC/ISUP protocols     Huawei Technologies Co. Ltd.   Q3/11   2009-01-09
[ 41 ]  
 
Signalling flows for centralized admission control of unicast combined with decentralized admission control of multicast flows     Huawei Technologies Co., Ltd., CATR   Q5/11   2009-01-09
[ 40 ]  
 
Revised draft of Supp.CRBT-CRT     ETRI, KT   Q3/11, Q2/11   2009-01-09
[ 39 ]  
 
Document withdrawn     N/A     2009-01-09
[ 38 ]  
 
Proposal for change of the question title of Q.12/11     ETRI   Q12/11   2009-01-09
[ 37 ]  
 
NID/USN standardization status of ITU-T     ETRI   Q12/11   2009-01-09
[ 36 ]  
 
Revised texts of Draft Recommendation Q.3308     ETRI   Q5/11   2009-01-09
[ 35 ]  
 
IMS/NGN Performance Benchmark Part 3: Traffic Sets and Traffic Profiles     Telekom Austria AG   Q8/11, Q11/11   2009-01-09
[ 34 ]  
 
IMS/NGN Performance Benchmark Part 2: Subsystem Configurations and Benchmarks  
Reposted with correct attachment
 
Telekom Austria AG   Q8/11, Q11/11   2009-01-09
[ 33 ]  
 
IMS/NGN Performance Benchmark Part 1: Core Concepts     Telekom Austria AG   Q8/11, Q11/11   2009-01-09
[ 32 ]  
 
Network performance objectives Tests for IP-based Voice services     Telekom Austria AG   Q11/11   2009-01-09
[ 31 ]  
 
Comparisons of ITU-T CRBT and 3GPP CAT     Korea (Republic of)   Q3/11, Q2/11   2009-01-09
[ 30 ]  
 
Document withdrawn     N/A     2009-01-09
[ 29 ]  
 
Proposed method of marking signalling packets suitable for IPv6     Razoom Inc.   Q5/11   2009-01-09
Results:78 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25