International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2011-04-27 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C (2011-04-27) 

ITU-T SG05

ICT and climate change

Study Period 2009

Meeting  from 2011-04-27 to 2011-05-05

held in Switzerland [Geneva]

Other Meetings : 2012-10-08  2012-04-11  2011-09-20  2010-11-23  2010-10-01  2010-04-12  2010-01-19  2009-10-12  2009-05-25  2008-11-24 

Results:7 total items.
Contributions  [ AI/Question: Q4/5 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 291 ]  
 
Proposal Resistibility tests (K20, K21 and K45) for Coaxial Ports     France Telecom Orange   Q4/5   2011-04-16
[ 248 ]  
 
Comments of the German NC concerning TD669 / Draft k.hnwr     Germany   Q8/5, Q6/5, Q5/5, Q4/5, Q13/5, Q10/5   2011-04-15
[ 247 ]  
 
Introduction of isolation transformer     NTT   Q4/5   2011-04-15
[ 246 ]  
 
Necessity of resistibility tests for internal ports and required test levels against lightning surges     NTT   Q4/5   2011-04-15
[ 245 ]  
 
Malfunction mechanisms of telecommunication equipment in customer premises     NTT   Q4/5   2011-04-15
[ 219 ]  
 
Aspects concerning the revision of Criterion A in ITU-T K.44     Deutsche Telekom , EPCOS   Q4/5   2011-04-11
[ 217 ]  
 
IEEE Std. 802.3 (2008) Ethernet Ports- Types and Isolation requirements     IEEE   Q4/5   2011-04-07
Results:7 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-24