International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Meeting 2010-11-23 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C (2010-11-23) 

ITU-T SG05

ICT and climate change

Study Period 2009

Meeting  from 2010-11-23 to 2010-12-01

held in Switzerland [Geneva]

Other Meetings : 2012-10-08  2012-04-11  2011-09-20  2011-04-27  2010-10-01  2010-04-12  2010-01-19  2009-10-12  2009-05-25  2008-11-24 

Results:63 total items.
Result page:  1 - 2  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 209 ]  
 
Compatibility of the ITU Methodology on Goods, Networks and Services with the International Reference Life Cycle Data System (ILCD)     European Union   Q18/5   2010-11-15
[ 208 ]  
 
Proposal for update of Clause 6, 7 of L.DC, "Best practices for green data centers"     ETRI   Q17/5   2010-11-15
[ 207 ]  
 
Comments on the Preliminary Draft New Recommendation K.monitor (COM 5 - C 152)     Argentina   Q3/5   2010-11-15
[ 206 ]  
 
Study on the broadband impulsive conducted disturbances test for DSL equipment     NTT   Q8/5   2010-11-12
[ 205 ]  
 
Proposed text and considered items in draft L.specDC     Korea Telecom   Q19/5   2010-11-12
[ 204 ]  
 
Proposed new question on ICTs to enable countries to adapt to climate change     France Telecom Orange   QALL/5   2010-11-12
[ 203 ]  
 
Proposed modifications to TD 512 - Draft Recommendation L.methodology_ICT goods and services     BT Plc   Q18/5   2010-11-12
[ 202 ]  
 
Contribution to the methodology L.methodology ICT in organisations     France Telecom Orange   Q18/5   2010-11-12
[ 201 ]  
 
Contribution to the methodology L.methodology ICT in organisations     France Telecom Orange   Q18/5   2010-11-12
[ 200 ]  
 
Contribution to the methodology L.methodology ICT in goods, networks and services and ICT in organisations     France Telecom Orange   Q18/5   2010-11-12
[ 199 ]  
 
Draft Recommendation L_methodology_ICT in Countries (Skeleton version)     France Telecom Orange   Q18/5   2010-11-12
[ 198 ]  
 
Information about surge tests on coaxial port     France Telecom Orange   Q4/5   2010-11-12
[ 197 ]  
 
Methodology framework of environmental impact assessment of ICT goods, networks, and services     ETRI   Q18/5   2010-11-12
[ 196 ]  
 
Proposal of revised text for L.rareMetals     ETRI   Q21/5   2010-11-12
[ 195 ]  
 
Selecting Measurement Points in Base Stations Evaluations     ANATEL, Brazil   Q3/5   2010-11-12
[ 194 ]  
 
Additional information for phase 2 of L.1000     CIP, United States   Q21/5   2010-11-12
[ 193 ]  
 
Proposal on future of draft Recommendation ITU-T K.deg     CIP, United States   Q16/5   2010-11-12
[ 192 ]  
 
 
Document withdrawn
 
N/A     2010-11-12
[ 191 ]  
 
 
Document withdrawn
 
N/A     2010-11-12
[ 190 ]  
 
Contribution to L.methodology: Evaluation of the environmental impacts of ICT in countries     Nokia Siemens Networks   Q18/5   2010-11-12
[ 189 ]  
 
Action items consideration to develop guidance for the assessment of GHG emission in the ICT sector     Korea (Republic of)   Q18/5   2010-11-12
[ 188 ]  
 
Observed characteristics of GHG inventories of ICT organizations     Korea (Republic of)   Q18/5   2010-11-12
[ 187 ]  
 
Clarification between L.methodology_ICT_projects and UNFCCC CDM methodologies     Korea (Republic of)   Q18/5   2010-11-12
[ 186 ]  
 
Modification of Working document toward draft new Recommendation K.guide     Korea (Republic of)   Q3/5   2010-11-12
[ 185 ]  
 
Proposal for update of the draft ITU-T Recommendation of L.methodology_ICT in organizations, "Methodology for environmental impact assessment of ICT in organizations"     Korea (Republic of) , Alcatel Lucent   Q18/5   2010-11-12
[ 184 ]  
 
Suggestion of heterogeneous induction source consideration by experimental example     Korea (Republic of)   Q9/5   2010-11-12
[ 183 ]  
 
Comparing the IEC MOV requirements with those from ITU-T K.77     Korea (Republic of)   Q11/5   2010-11-12
[ 182 ]  
 
Proposal for K.guide: EMF levels by various transmitters     Korea (Republic of)   Q3/5   2010-11-12
[ 181 ]  
 
Proposal for K.guide and K.61: Reduction of measurement time     Korea (Republic of)   Q3/5   2010-11-12
[ 180 ]  
 
Proposal for K.guide: Requirements for the measurement equipment     Korea (Republic of)   Q3/5   2010-11-12
[ 179 ]  
 
Proposal for K.guide: EMF levels around CDMA base stations     Korea (Republic of)   Q3/5   2010-11-12
[ 178 ]  
 
Draft Recommendation ITU-T L.methodology_ICT goods, networks and services : Text for paragraph 7.2.2.3 and 7.2.2.4     Alcatel Lucent   Q18/5   2010-11-11
[ 177 ]  
 
Proposed new study Question: Rural communications [Setting up a low cost sustainable telecommunication infrastructure in rural areas of developing nations]     Vihaan Networks Ltd.   QALL/5   2010-11-11
[ 176 ]  
 
Proposal of interface specifications for Recommendation L.spec HVDC     Japan   Q19/5   2010-11-11
[ 175 ]  
 
Proposal of Safety Standard Harmonization on DC Fuse issue and Connector     Japan   Q19/5   2010-11-11
[ 174 ]  
 
Proposal on the detailed discussion about system boundary and life cycle phases of ICT goods     Japan   Q18/5   2010-11-11
[ 173 ]  
 
Proposal of the case study on evaluated environmental impact of home office space in the United States of America     Japan   Q18/5   2010-11-11
[ 172 ]  
(Rev.1) 
Draft text of ITU-T Recommendation K.leakage "Test method and requirements against information leak through unintentional EM emission", for consent     NTT , NICT   Q15/5   2010-11-11
[ 171 ]  
 
Appendix IV for L.adapterPhase2 draft     China   Q21/5   2010-11-11
[ 170 ]  
 
EMC and Safety study and proposal for L.adapterPhase2 draft     China   Q21/5   2010-11-11
[ 169 ]  
 
Proposal on output power range classification for L.adapterPhase2 draft     China   Q21/5   2010-11-11
[ 168 ]  
 
Proposal to establish a new work item on Universal Li-ion battery solution for mobile phone and other ICT device     China   Q21/5   2010-11-11
[ 167 ]  
 
Proposed structure for recommendation L.metrics (energy efficiency metrics for telecommunication equipment)     China   Q17/5   2010-11-11
[ 166 ]  
 
Propose a new Recommendation on telecommunication terminal equipment EMC     China   Q16/5   2010-11-11
[ 165 ]  
 
Mutual-disturbance Test Requirements for Performance Degradation Evaluation of Converged Terminal Devices     China   Q16/5   2010-11-11
[ 164 ]  
 
Proposal for update of Clause 8.2.5 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2010-11-11
[ 163 ]  
 
Discussion and proposal for Clause 9, "ICT project validating," of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2010-11-11
[ 162 ]  
 
Proposal for update of Clause 8 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2010-11-11
[ 161 ]  
 
Draft skeleton of new Recommendation L.DC     Telecom Italia , Huawei   Q17/5   2010-11-11
[ 160 ]  
 
First Draft of new Recommendation L. metrics     Telecom Italia , Huawei   Q17/5   2010-11-11
Results:63 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26