Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 145 ]
|
Contribution sur l'Environnement et le changement climatique
|
Ministère des PTT Rép Dém Congo
|
Q17/5
|
2010-04-01 |
|
[ 144 ]
|
Proposal of nominal voltage and voltage range of the Power feeding systems
|
NTT
|
Q19/5
|
2010-03-30 |
|
[ 143 ]
|
Developing the contents of a ICT-GSCR document
|
ETRI
|
Q18/5
|
2010-03-30 |
|
[ 142 ]
|
Proposed skeleton for L_methodology_general umbrella - Proposed skeleton with some proposed text inputs
|
France Telecom Orange
|
Q18/5
|
2010-03-30 |
|
[ 141 ]
|
Resistibility Guide
|
France Telecom Orange
,
Technicolor
|
Q4/5
|
2010-03-30 |
|
[ 140 ]
|
Some remarks regarding K.guide
|
ANATEL
|
Q3/5
|
2010-03-30 |
|
[ 139 ]
|
Proposal on Reporting Format for L_Methodology ICT Goods and Services
|
Telefon AB - LM Ericsson
|
Q18/5
|
2010-03-30 |
|
[ 138 ]
|
Proposal on Product System Categories to be Reflected in Structure of L_Methodology ICT Goods and Services
|
Telefon AB - LM Ericsson
|
Q18/5
|
2010-03-30 |
|
[ 137 ]
|
Proposal on Modified Ways of Working for L_methodology ICT Goods and Services
|
Telefon AB - LM Ericsson
|
Q18/5
|
2010-03-30 |
|
[ 136 ]
|
Proposal on Definitions of High Level Life Cycle Phases
|
Telefon AB - LM Ericsson
|
Q18/5
|
2010-03-30 |
|
[ 135 ]
|
Proposal for the ICT sector definition
|
ETRI
|
Q18/5
|
2010-03-30 |
|
[ 134 ]
|
Proposal for clarification of main issues to be included and discussed in the guidance of L.methodology_ICT_in_organizations
|
Korea (Republic of)
|
Q18/5
|
2010-03-30 |
|
[ 133 ]
|
Proposal of text structure for L.rareMetals
|
Korea (Republic of)
|
Q21/5
|
2010-03-30 |
|
[ 132 ]
|
International activities related to recycling of rare metals
|
Korea (Republic of)
|
Q21/5
|
2010-03-30 |
|
[ 131 ]
|
Discussion about the scope of L.rareMetals
|
Korea (Republic of)
|
Q21/5
|
2010-03-30 |
|
[ 130 ]
|
Follow-up comment and consideration of power system configuration after the submitted opinions for K.56 AAP
|
Korea (Republic of)
|
Q5/5
|
2010-03-30 |
|
[ 129 ]
|
Proposals for update of Clause 7 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
|
Korea (Republic of)
|
Q18/5
|
2010-03-30 |
|
[ 128 ]
|
Proposal for update of Clauses 3, 4 and 6 of L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"
|
Korea (Republic of)
|
Q18/5
|
2010-03-30 |
|
[ 127 ]
|
Proposal for clarification of the work scope of L.methodology_ICT_in_organizations
|
Korea (Republic of)
|
Q18/5
|
2010-03-30 |
|
[ 126 ]
|
Proposal for the scope of L.methodology_ICT_in_organizations
|
Korea (Republic of)
|
Q18/5
|
2010-03-30 |
|
[ 125 ]
|
Considerations for Title correction of draft recommendation L.specHVDC
|
Korea (Republic of)
|
Q19/5
|
2010-03-30 |
|
[ 124 ]
|
Induced voltage measured at one end of a conductor when the other end of that conductor is earthed closely to the high-speed electrified railway
|
Korea (Republic of)
|
Q9/5
|
2010-03-30 |
|
[ 123 ]
|
Consideration of nominal voltage decision DC 300V
|
Korea (Republic of)
|
Q19/5
|
2010-03-30 |
|
[ 122 ]
|
Introduction of safety requirement for surge suppressors in audio/video, information and communication technology equipments
|
Korea (Republic of)
|
Q11/5
|
2010-03-30 |
|
[ 121 ]
|
Proposal for complementary input on '2010 Best Practices for the EU Code of Conduct on Data Centres'
|
Korea (Republic of)
|
Q19/5
|
2010-03-30 |
|
[ 120 ]
|
Considerations for Proposed input to SG5 Recommendations on 'Data Center Energy Efficiency'
|
Korea (Republic of)
|
Q19/5
|
2010-03-30 |
|
[ 119 ]
|
Presentation on the TEER Standards Supporting Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"
|
ATIS
|
Q20/5, Q19/5, Q18/5, Q17/5
|
2010-03-30 |
|
[ 118 ]
|
Electromagnetic disturbance waves enter Ethernet ports in customer telecommunication equipment
|
NTT
|
Q8/5
|
2010-03-30 |
|
[ 117 ]
|
Decision of nominal voltage based on compatibility requirements
|
KT
|
Q19/5
|
2010-03-30 |
|
[ 116 ]
|
Working document toward draft new Recommendation K.guide
|
Telekomunikacja Polska
|
Q3/5
|
2010-03-30 |
|
[ 115 ]
|
Additional supplement of smart antennas calculation for K.guide
|
China Mobile Communications Corporation
|
Q3/5
|
2010-03-30 |
|
[ 114 ]
|
Proposal of evaluation of environmental impact for office space
|
Japan
|
Q18/5
|
2010-03-30 |
|
[ 113 ]
|
Proposed Introduction and Scope for L.methodology_umbrella
|
Japan
|
Q18/5
|
2010-03-30 |
|
[ 112 ]
|
Progress Report on the EARTH Project
|
Alcatel Lucent
|
Q18/5, Q17/5
|
2010-03-30 |
|
[ 111 ]
|
Network equipment to be covered
|
Alcatel Lucent
|
Q18/5
|
2010-03-30 |
|
[ 110 ]
|
External coaxial cable port test proposal
|
Bourns
|
Q4/5
|
2010-03-30 |
|
[ 109 ]
|
Ethernet Field experiences
|
IEEE
|
Q4/5
|
2010-03-30 |
|
[ 108 ]
|
Recommendations K.20, K.21 and K.45 - Power Contact Test Proposals
|
IEEE
|
Q4/5
|
2010-03-30 |
|
[ 107 ]
|
Higher Voltage DC
|
France Telecom Orange
|
Q19/5
|
2010-03-30 |
|
[ 106 ]
|
ICT environmental impact model
|
France Telecom Orange
|
Q21/5
|
2010-03-30 |
|
[ 105 ]
|
Scope of Phase 2 of Universal power adapter and charger solution for mobile terminals and other ICT devices
|
France Telecom Orange
|
Q21/5
|
2010-03-30 |
|
[ 104 ]
|
The impact of voltage ramp on DC powered telecommunication equipment start-up
|
ZTE Corporation
|
Q12/5
|
2010-03-26 |
|
[ 103 ]
(Rev.1) |
Strengthening the refined research for the Energy Efficiency Rating of transport equipment
|
ZTE Corporation
|
Q18/5
|
2010-03-26 |
|
[ 102 ]
|
Transmittal of Documents from ATIS Committee STEP-TEE on "Energy Efficiency for Telecommunications Equipment: Methodology for Measurement and Reporting"
|
ATIS
|
Q20/5, Q19/5, Q18/5, Q17/5
|
2010-03-26 |
|
[ 101 ]
|
Using data of lightning positioning system for network protection, recovery services or diagnosis by hotline services
|
France Telecom Orange
|
Q5/5
|
2010-03-16 |
Results:45 total items.
|
Multiple Document Download: Formats and Languages to be included (when available):