International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Results:42 total items.
Contributions  [ Source: Huawei Technologies ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 535 ]  
 
Proposal on state transition tables for T-MPLS linear protection switching     ETRI, , Huawei Technologies   Q9/15   2007-05-25
[ 471 ]  
 
VS Technical Clarification     Huawei Technologies Co., Ltd , China Telecom Co., Ltd   Q12/15   2007-05-24
[ 470 ]  
 
Trigger events for auditing process     Huawei Technologies Co., Ltd   Q14/15   2007-05-24
[ 469 ]  
 
1+1/1:1 protection switching mechanism for RMPS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 468 ]  
 
Requirement of partial protection switching for RMPS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 467 ]  
 
Proposal for an over-clocked OTN structure (supplement) recommendation     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 464 ]  
 
Proposal on OAM Model for T-MPLS SPRing     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 463 ]  
 
Proposal for Application Code and Parameter Values in G.dapp2     MII , China Telecom, China United Telecom , China Mobile , ZTE Corporation , P.R. China Huawei Technologies Co., Ltd   Q6/15   2007-05-24
[ 462 ]  
 
Proposal for FC over T-MPLS     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 461 ]  
 
Considerations in Sync Ethernet over OTN     Huawei Technologies Co., Ltd   Q13/15, Q11/15, Q9/15   2007-05-24
[ 460 ]  
 
Consideration about the time requirement     Huawei Technologies Co., Ltd   Q13/15   2007-05-24
[ 459 ]  
 
Connections between ring nodes on T-MPLS ring     Huawei Technologies Co., Ltd   Q9/15   2007-05-24
[ 458 ]  
 
Proposals on a flexible multiplexing/mapping scheme     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 457 ]  
 
Considerations on the evolution of OTN     Huawei Technologies Co., Ltd   Q11/15   2007-05-24
[ 456 ]  
 
G.VDSL: Further information for the SOS proposal     Ministry of Information Industry of the P.R. China , Huawei Technologies Co., Ltd.   Q4/15   2007-05-24
[ 455 ]  
 
G.vdsl: More Results on Performance of a Physical-Layer Retransmission Scheme     Huawei Technologies Co., Ltd. , Ministry of Information Industry of the P.R. China   Q4/15   2007-05-24
[ 453 ]  
 
G.vdsl: Proposal for New Recommendation on FEXT Cancellation for use with VDSL2 Transceivers     Huawei Technologies Co., Ltd   Q4/15   2007-05-24
[ 452 ]  
 
G.vdsl: More Information about Bivariate Histogram for Impulse Noise Monitor     Huawei Technologies Co., Ltd, P.R. China   Q4/15   2007-05-24
[ 451 ]  
 
OMCI for 802.1ad QoS support     Huawei Technologies (Ltd), China   Q2/15   2007-05-24
[ 272 ]  
 
Proposed text for Draft Amendment 1 to Recommendation G.8110.1     Alcatel , Huawei Technologies   Q12/15   2006-10-20
[ 267 ]  
 
Proposals for draft Recommendation G.8131 (Protection switching for Transport MPLS (T-MPLS) networks)     Huawei Technologies , Alcatel , Tellabs Oy   Q9/15   2006-10-20
[ 152 ]  
 
Power Load Management M.E.     Huawei Technologies   Q2/15   2006-10-19
[ 151 ]  
 
Path Degradation in Packet Transport Network     Huawei Technologies   Q9/15, Q12/15   2006-10-19
[ 150 ]  
 
Proposal for G.984.4 modelling of SDH over GEM     Huawei Technologies   Q2/15   2006-10-19
[ 149 ]  
 
VDSL2: Key issues to emergency rate reduction(SOS)     MII China , Huawei Technologies   Q4/15   2006-10-19
[ 148 ]  
 
VS Tunnel Multiplexing and Services Discussion     Huawei Technologies , Siemens AG , China Telecom   Q12/15   2006-10-19
[ 147 ]  
 
Proposed text for G.7716 draft     Huawei Technologies   Q14/15   2006-10-19
[ 146 ]  
 
Proposal for TCM in G.8110.1     Huawei Technologies   Q12/15   2006-10-19
[ 145 ]  
 
Propose to add RPR/TM adaptation function     Huawei Technologies   Q12/15   2006-10-19
[ 144 ]  
 
Shared Bandwidth Rate Control     Huawei Technologies   Q12/15, Q9/15   2006-10-19
[ 143 ]  
 
Proposal for FC over T-MPLS     Huawei Technologies   Q12/15   2006-10-19
[ 142 ]  
 
Proposal for E-Tree service in G.8011     Huawei Technologies   Q11/15   2006-10-19
[ 141 ]  
 
Proposed Functional Requirements for Automatic Synchronization Distribution     Huawei Technologies   Q13/15   2006-10-19
[ 140 ]  
 
Proposal for TCM in G.798     Huawei Technologies   Q11/15, Q9/15   2006-10-19
[ 139 ]  
 
Corrigendum to G.7043/Y.1343     Huawei Technologies   Q11/15   2006-10-19
[ 138 ]  
 
Proposals for application code and Physical layer parameters and values for G.dapp2 applications     Huawei Technologies   Q6/15   2006-10-19
[ 137 ]  
 
Proposal for TCM in G.709     Huawei Technologies   Q9/15, Q11/15   2006-10-19
[ 136 ]  
 
Proposal for sequencing TCM levels in G.798     Huawei Technologies   Q11/15, Q9/15   2006-10-19
[ 135 ]  
 
Comments on draft G.dapp2 version 0.31     Huawei Technologies   Q6/15   2006-10-19
[ 134 ]  
 
Clarification to questions raised to WD23 at Ottawa Q13/15 Meeting that was held June 19 - 23, 2006 in Ottawa, Canada     Huawei Technologies   Q13/15   2006-10-19
[ 133 ]  
 
Automatic Sync Distribution Technique     Huawei Technologies   Q13/15   2006-10-19
[ 132 ]  
 
VDSL2: Work Items on In-Domain FEXT Cancellation     MII China , Huawei Technologies   Q4/15   2006-10-19
Results:42 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-5-1